Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.6 L+₹1.1 L (20.4%)Rejected-AOC 201 DDA LOCAL SHOPPING CENTRE BLOCK VIKASPURI NEW DELHI 110018 | NEW DELHI | WEST DELHI | DELHI | 110018 | ₹6.6 L+₹1.1 L (20.4%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.0 L+₹1.4 L (26.4%)Rejected-AOC E 207 ECO BHAWAN ECO BHAWAN E 207 INDUSTRIAL AREA PHASE VIII B SECTOR 74 MOHALI PUNJAB 160071 160071 MOHALI PUNJAB 160071 | S A S NAGAR | PUNJAB | 160071 | ₹7.0 L+₹1.4 L (26.4%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical NO 400 ABC TOWERS 13TH STREET SIDCO INDUSTRIAL ESTATE AMBATTUR CHENNAI TAMIL NADU 600098 | 600098 | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | Chandigarh Pollution Testing Laboratory L1 | Eco Paryavaran Laboratories and Consultants Private Limited L3 | SBA ENVIRO SYSTEMS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | DESIGN AND CONSTRUCTION OF 15 MLD CAPACITY MAIN PUMPING STATION (MPS), 10 MLD CAPACITY SEWAGE TREATMENT PLANT (STP) BASED ON SBR TECHNOLOGY AND 5 MLD CAPACITY TERTIARY TREATMENT PLANT (TTP) AT AEROCITY, SAS NAGAR, ALONG WITH ALL OTHER WORKS CONTINGENT THERETO INCLUDING OPERATION AND MAINTENANCE PERIOD OF 120 MONTHS INCLUDING DEFECT LIABILITY PERIOD | 1 | Job | - | - | 1 ₹1 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
6 Jul 2026, 1:00 pmClosed
Divisional Engineer (PH)
DE(PH) Room no. 301 BDA Bathinda
Preparation of Environmental Impact Assessment Study and Seeking Environmental clearance from the MOEF (GOI) for Development of New Urban Estate at Bathinda Malout Road (Thermal Site) (91.31acre ), Bathinda
2026_DHUD_170698_2
Puda/BDA/DE(PH)/2026/550-557 dt. 23.06.2026
Open Tender
Consultancy
Lump-sum
125 days
Guru Nanak Dev Thermal Plan Bathinda
Please refer Tender documents.
2 documents required · 2 mandatory
₹1
Yes
₹25,000
Yes
BDA Office
24 Jul 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DESIGN AND CONSTRUCTION OF 15 MLD CAPACITY MAIN PUMPING STATION (MPS), 10 MLD CAPACITY SEWAGE TREATMENT PLANT (STP) BASED ON SBR TECHNOLOGY AND 5 MLD CAPACITY TERTIARY TREATMENT PLANT (TTP) AT AEROCITY, SAS NAGAR, ALONG WITH ALL OTHER WORKS CONTINGENT THERETO INCLUDING OPERATION AND MAINTENANCE PERIOD OF 120 MONTHS INCLUDING DEFECT LIABILITY PERIOD | 1 | Job | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
SBD91.pdf
Tender Documents • 15.67 MB
BOQ_347458.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .