Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.7 LAdmitted-Fee/PreQual/Technical/Finance | +5.50% | ₹35.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹36.9 L+₹1.2 L (3.32%)Admitted-Fee/PreQual/Technical/Finance ADC CHOWMUHANI JIRANIA BIRENDRANAGAR WEST TRIPURA PIN NO 799045 | BIRENDRANAGAR | WEST TRIPURA | TRIPURA | 799045 | +9.00% | ₹36.9 L+₹1.2 L (3.32%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.9 L
EMD Value
₹67,740
Closing Date
21 May 2026, 3:00 pmClosed
Executive Officer
JIRANIA
Upgradation of Newly Constructed Electric Crematorium(Construction of Boundary Wall, Waiting Shed Pathways, Drain etc.) under Jirania nagar Panchayat(2ND Call).
2026_Urban_72456_1
373/SE/UDD/EW/DNIeT/2025-26
Open Tender
Civil Works
Percentage
90 days
Jirania
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
₹67,740
25 May 2026
4 May 2026
21 May 2026
4 May 2026
21 May 2026
4 May 2026
4 May 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | Cum | 231.6 | - |
| 2 | Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift
upto 1.5 m. | - | Cum | 161.3 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,177.18 |
| 4 | Providing and laying in position cement concrete of
specified grade excluding the cost of centring and shuttering - All work upto plinth level:1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone
aggregate 40 mm nominal size) | 1 | Cum | 9,960.7 | ₹9,959.7 |
| 5 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement-
-All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone
aggregate 20 mm nominal size) | - | Cum | 11,693.5 | - |
| 6 | Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses,
plinth and skirting courses, fillets, columns, pillars,
piers, abutments, posts and struts etc. upto floor five
level excluding cost of centring, shuttering, finishing
and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone
aggregate 20 mm nominal size) | - | Cum | 12,925.6 | - |
| 7 | First class brick work in foundation and plinth
including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | Cum | 9,845.2 | - |
| 8 | Half brick manonary work with first class brick work in foundation and plinth
including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | 1,311.8 | - |
| 9 | 12 mm cement plaster of mix In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) | - | sqm | 224.2 | - |
| 10 | Neat cement punning | - | sqm | 56.8 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_73733.xls
BOQ • 0.31 MB
DNIeT373.pdf
Tender Documents • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .