Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
21 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Cutting/ Removal of tubes of W5 Heat Exchanger and its repair work in SA plant, FACT-CD
2026_FACT_897391_1
4097/2025-2026/E33023
Limited
Miscellaneous Works
Item Rate
60 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
23 Feb 2026
6 Feb 2026
23 Feb 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
Cutting/ Removal of tubes of W5 Heat Exchanger and its repair work in SA plant, FACT-CD
Dismantling / Cutting of W5 Heat Exchanger Tubes and Patch work of shell & Tube sheets if, any Make necessary site arrangements including scaffolding for the work. Cut and dismantle tubes safely. All tube sheet holes must be cleaned completely of residue or debris using brushes or grinding.A sample tube shall be inserted through the holes after cleaning to ensure proper passage for the tubes. Clean the tube sheet area, baffle plate and bottom plate area. Patch work of shell, baffle plate and tube sheets shall be done as per instruction of the Engineer -in- charge. Repair / replacement of bottom tube sheet support shall be done as per the drawings. Damaged / removed tubes shall be transported to scrap yard and the area shall be clean and free of any scraps. Affer removal of all tubes, top cone need to be fixed back and one run of welding shall be done. All duct openings including the cone area shall be blinded and all arrangements/providing nipples/tubes etc. for nitrogen filling/preservation shall be done. W5 Heat exchanger shall be shifted to ear marked area as per the instruction from Engineer -In Charge after completing all works.
finance_943257.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tenderdocuments.pdf
Tender Documents • 1.28 MB
BOQ_943257.xls
BOQ • 0.23 MB
SpecialConditions.pdf
Tender Documents • 0.17 MB
Compliance.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .