Tender for Construction of Toilet Blocks at Mahatma Mandir Convention and Exhibition Centre (MMCEC) at Gandhinagar
296476
2026/MMCEC
Open
Civil - All
Works
Gandhinagar
2 documents required · 1 mandatory · 1 optional
₹15,000
Gandhinagar Railway and Urban Development Corporation Limited
₹8.2 L
28 Apr 2026
28 Apr 2026
28 Apr 2026
8 May 2026
28 Apr 2026
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Gandhinagar Railway & Urban Development Corporation Limited (GARUD) invites bids for
the construction of works detailed in the table.
The bidders may submit bids for any or all of the following works.
Package Name Approximate Bid Cost of Period of #Class of Registration
No. of work value of security document completion /Category of
works (Rs.) (Rs.) contractor if required
1. Construction of Toilet
Blocks at Mahatma 2,74,21,007.66 8,22,630.23 15,000 6 Class “A”
Mandir Convention (Six Special Category-II
and Exhibition Centre Month) Building & above
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.tender.nprocure.com free of cost till the Time and Date as mentioned on
online NIT at website https://www.tender.nprocure.com.#
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee
/ Tender Fee through Demand Draft only of any Schedule Bank payable at
Gandhinagar and in favour of ‘Gandhinagar Railway and Urban Development
Corporation Ltd. Oncethe Bid is received online, Bid Document / Tender Fee will not be
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid
Security / EMD shall be submitted in electronic format through online (by scanning) while
uploading the bid, this submission shall mean that bid document / tender fee and Bid
Security / EMD has been received. Accordingly, the offer of only those shall be opened
whose Bid Document / Tender Fee and Bid Security / EMD have been received
electronically. However, for the purpose of realization of Demand Draft, and FDR / Bank
Guarantee bidder shall send the same in original through R.P.A.D. so as to reach to #
Gandhinagar Railway & Urban Development Corporation Limited (GARUD)
Block no. 3, 3rd Floor E-1 Wing, Karmayogi Bhavan, Sector-10A, Gandhinagar -
Gujarat within 7 Days from the last day of bidsubmission.
Penetrative action for not submitting Demand Draft / FDR / Bank Guarantee in
original to Executive Engineer / Tender Inviting Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the online
NIT at website https://www.tender.nprocure.com in the presence of the bidders or their
authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids
will be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on ………………………………at ………………………..hrs. at the
office of GARUD Gandhinagar to clarify the issues and to answer questions on anymatter
that may be raised at that stage as stated in clause 9.2 of ‘instructions toBidders’ of
the bidding documents.
6. #Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should
be rounded off to the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the
bidder cannot modify / edit / withdraw their submitted offer in any case. No written
or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of
submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender
are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the
bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the
format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly
in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past,
it shall not be deemed to be a ground / reason for not giving required information for
this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation of
this bid. The Government will not ask for any other information, unless it is found
absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
# For the works costing up to 7.5 crore (ROAD), 7.0 crore (BUILDING & BRIDGE)
kindly refer to SSR-10-2015-17-C dated 03-02-2017
For the works costing under 7.5 crore for Road Works and 7.0 crore for Building and
Bridge Works following documents shall be submitted in electronic format only through
online by scanning and the (i) Bid Document Fee / Tender Fee (ii) Bid Security / EMD
should be sent in original to the Tender opening authority through RPAD, so as to reach
the Executive Engineer within 7 days from last day of submission of Bid.
(i) Bid Document Fee / Tender Fee
(ii) Bid Security / EMD or Valid EMD Exemption Certificate of Appropriate Class of
Registration of Approved Contractors
(iii) Registration Certificate of Appropriate Class-“A” & above
(iv) Registration Certificate of Special Category - Road / Bridge / Building and
Category I / II / III, if required
(vi) Work Experience, if necessary…
(vi) Other Documents, as required…
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 8 19. Sealing & Marking of Bids
2. Source of Funds 8 20. Deadline for Submission of
3. Eligible Bidders 8 21. Late Bids
4. Qualification of the 8 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 12 E. Bid Opening and Evaluation
7. Site Visit 12 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 13 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 13 27. Correction of Errors
10. Amendment of Bidding 14 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 15 F. Award of Contract
13. Bid Prices 15 31. Award Criteria
14. Currencies of Bid and 16 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 16 33. Notification of Award and
Signing of Agreement
16. Bid Security 16 34. Performance Security
17. Alternative Proposals By 17 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 17 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works
(as defined in these documents and referred to as ‘the works”) detailed in the table
given in IFB. The bidders may submit bids for any or all of the works detailed in the
table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat / Govt.
of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to be
adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
#4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/
fail criteria regarding the Applicant’s general and particular experience, personnel and
equipment capabilities and financial positions, as demonstrated by the applicant’s
responses in the forms attached to the letter of application ( specified requirement for
joint ventures are given under para 4.6 below ) Subcontractors experience and
resources shall not be taken in to account in determining the applicants compliance
with the qualifying criteria
To qualify for more than one contract, the applicant must demonstrate having
experience and resources sufficient to meet the aggregate of the qualification criteria
for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year.
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
Applicant should indicate actual figures of costs and amount for the works executed
by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign
currency the above enhanced multiplying factors will not be applied. Instead, the
current market exchange rate (State Bank of India BC Selling rate as on the last date of
submission of the bid) will be applied for the purpose of conversion of the amount in
foreign currency into India rupees.
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum annual financial turnover (defined as billing for works in
progress and completed in all classes of civil engineering construction works
only) in any one year, over the last five years(i.e 2021-22 to 2025-26) of the
annual value of contract / contracts applied for is of Rs. 5,48,42,015.32.
(b) Experience in successfully completing or substantially completing at least one
contract of similar works of at least 40 percent of the value of proposed contract
within the last five years. (i.e 2021-22 to 2025-26) i.e. Rs. 1,09,68,403.07.
The works may have been executed by the applicant as prime contractor or as a
member of a joint venture or as a nominated sub-contractor. As subcontractor,
he should have acquired the experience of execution of all major items of works
under the proposed contract. In case a project has been executed by a joint
venture, weight towards experience of the project would be given to each joint
venture in proportion to their financial participation in the joint venture.
Substantially completed works means those works which are at least 90 %
completed as on the date of submission (i.e. gross value of work done up to the
last date of submission is 90 % or more of the original contract price) and
continuing satisfactorily.
The similar work shall be defined as construction of toilet blocks which includes
works of Civil, Interior, Plumbing, drainage, sewerage, electrical and HVAC
Works for Railway Stations, exhibition halls, convention centers, institutional &
Industrial buildings, educational institutes, and four-/five-star hotels etc.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value, billing
amount, date of commencement of works, satisfactory performance of the
contractor and any other relevant information.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their bid,
a detailed construction planning and methodology supported with layout and
necessary drawings and calculations to allow the employer to review their proposals.
The numbers, types and capacities of each plant/equipment shall be shown in the
proposals along with the cycle time for each operation for the given production
capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and / or credit
facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If
necessary, the employer will make inquiries with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over the last five years. A consistent
history of awards against the Applicant or any partner of a joint venture may result in failure
of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified
Made misleading or false representation in the forms, statements submitted, and / or
Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure due
to bankruptcy. The rescinding of contract of a joint venture on account of reasons
other than non – performance, such as Most Experienced partner of joint venture
pulling out, court directions leading to breaking up of a joint venture before the start
of work, which are not attributable to the poor performance of the contractor will,
however, not affect the qualification of the individual partners.
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others)
(Applicable only for estimated project cost of 50 Crore and above)
4.6.1. Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para
4.5.3 & 4.5.6 above. The joint venture must collectively satisfy the criteria of para
4.5.3 & 4.5.6 above. The experience of the other joint venture partners shall be
considered if it is not less than 30 percent of the qualifying criteria in para 4.5.3 &
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8 above.
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall
be submitted with a copy of the joint venture agreement providing the joint and
several liabilities with respect to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partners individually
or as a partner in any other joint venture. In case dissolution of a joint venture, each one
of the constituent firms may qualify if they meet all the qualification requirements, subject
to the written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if their
available bid capacity at the expected time of bidding is more than the total estimated
cost of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = (A*N*2-B), where
A = Maximum value of work executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into account
the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works to be
completed during the next (i.e 6 Month)( period of completion of work for which
bids are invited ); and
N = Number of years prescribed for completion of the works for which the bids are
invited. (i.e 6 Month)
Note :- In Case of joint venture, the available bid capacity will be applied for each
partner to the extent of his proposed participation in the execution of
4.8 Even though the bidders meet the above qualifying criteria, they are subject to
be disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with
the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid,
and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine
the Site of work and its surrounding and obtain all information that may be necessary
for preparing the Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes
and drawings in the Bid Document. Failure to comply with the requirements of Bid
Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids
which are not substantially responsive to the requirements of the Bid Documents shall
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify
the Employer in writing or through E-mail at the Employer’s address indicated in
the invitation to bid. The Employer will respond to any request for clarification
which he received earlier than 15 days prior to the deadline for submission of bids.
Employer’s response will be published on website including a description of the
enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which
will take place at the address, venue, time and date as indicated in the appendix.
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach
the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source
of enquiry) and the responses given will be published without delay on the tender
website i.e. www.tender.nprocure.com. Any modification of the bidding documents
listed in sub-Clause 8.1 which may become necessary as a result of the pre-bid
meeting shall be made by the Employer exclusively through the issue of an
Addendum pursuant to Clause 10 and not through the minutes of the pre-bid
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer
will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause8.1)
shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on
the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder
will not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period.
A bidder may refuse the request without forfeiting his bid security. A bidder agreeing
to the request will not be required or permitted to modify his bid, but will be required
to extend the validity of his security for a period of the extension, and in compliance
with Clause 16 in all respects.
#16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in
favor of Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore and
above) and Bank Guarantee of Schedule and Private Banks shall be considered as per
GoG Finance Department’s Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date
21/04/2023 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar Department
of Govt of Gujarat. Exemption Certificate is applicable only when Registration
Certificate of Appropriate Class and Category of Approved Contractors is
required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated
in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end
of the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed
the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation, If contractor does not
respond in time, his Bid Security (EMD) will be forfeited and his tender will be rejected.
Punitive action will be taken on such contractors. (As per GoG R&B Dept’s Gr. No.
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further in
the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate
parts to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids and
the expiration of the original period of bid validity specified in Clause 15.1 above or
as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security
pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend
at time, date and the place specified in Appendix in the manner specified in Clauses
and 23.3, In the event of the specified date of Bid opening being declareda holiday for
the Employer, the Bids will be opened at the appointed time and location on the next
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished does not
conform to the amount and validity period as specified in the invitation for bid (ref.
Column 4 and paragraph 3), and has not been furnished in the form specified in Clause
16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with
respect to the Qualification information and other information furnished in
part I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose
financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount and such other details as the Employer may consider
appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount, and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to influence
the Employer’s processing of Bids or award decisions may result in the rejection of his
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may,
at his discretion, ask any Bidder for clarification of his Bid, including breakdowns of
unit rates. The request for clarification and the response shall be in writing or by e-
mail, but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors discovered
by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating
to his Bid opening to the contract is awarded. If the Bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decision may result in the rejection of the Bidders’bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been
properly signed; (c) is accompanied by the required securities and; (d) is substantially
responsive to the requirements of the Bidding document. During the detailed
evaluation of the “Financial Bid”, the responsiveness of the bids will be further
determined with respect to the remaining bid conditions, i.e., priced bill of quantities,
technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would affect
unfairly the competitive position of other Bidders presenting substantially responsive
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer,
and may not subsequently be made responsive by correction or withdrawal of the
non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the requirements
of the Bidding documents or otherwise result in unsolicited benefits for the Employer,
shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not be
taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may
require the Bidder to produce detailed consistency of those prices with the
construction methods and schedule proposed. After evaluation of the price analyses,
the Employer may require that the amount of the performance security set forth in
Clause 34 be increased at the expense of the successful /bidder to a level sufficient to
protect the Employer against financial loss in the event of default of the successful
Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid
has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than the
one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest evaluated
bid. The contract will in such cases be awarded to the next lowest bidder at his
evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the award
of contract, without thereby incurring any liability to the affected bidder or Bidder or
any obligation to inform the affected Bidder or Bidders of the grounds for the
Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the
“Letter of Acceptance”) will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only tothe
furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of Acceptance.
Within 21 days of receipt, the successful Bidder will sign the Agreement and deliver it
to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall
furnish to the Employer an irrevocable and unconditional guarantee from a Bank
in the form set forth in Section 8 (the “Performance Security”) for anamount equal
to 5% (five percent) of its Contract Price. In case of bids mentioned below, the
successful Bidder, along with the Performance Security,
shall also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but
upto 20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 20% of the difference in the (i) Estimated
Project Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of
the Estimated Project Cost, then the Additional Performance Security shall
be calculated @ 30% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost
and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects
Liability Period and the Additional Performance Security shall be valid beyond
28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of
the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated
in the Conditions of Contract, subject to maximum amount, as stated in the Contract
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in completing for the contract
in question and will declare the firm ineligible, either indefinitely or for a stated
period of time, to be awarded a contract with National Highways Authority of India/
State PWD and any other agencies, if it at any time determines that the firm has
engaged in corrupt or fraudulent practices in completing for the contractor, orin
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the
Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is Gandhinagar Railway and Development [ Cl.1.1]
Corporation Ltd. (GARUD)
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3 (a)]
4. Value of Work is Rs.
6. The cost of civil & interior work is Rs.
The cost of Water Supply, Sanitary & Drainage is Rs.
The cost of Electrical work is Rs.
The cost of HVAC work is Rs.18,59,100.00
7. Liquid assets and / or availability of creditfacilities is Rs. [Cl.4.5.6 ]
9. Price level of the financial year 2026-27 [Cl. 4.5.2]
10. The pre-bid meeting will take place at Gandhinagar Railway & [Cl. 9.2.1]
Urban Development Corporation Limited (GARUD)
Block no. 3, 3rd Floor E-1 Wing, Karmayogi Bhavan, Sector-10A,
Gandhinagar - 382010, Gujarat.
11. The technical Bid will be opened at the office ofthe Gandhinagar
Railway & Urban Development Corporation Limited (GARUD)
Block no. 3, 3rd Floor E-1 Wing, Karmayogi Bhavan, Sector-10A,
Gandhinagar - 382010, Gujarat. on dt at
12. Address of the Employer: Block no. 3, 3rd Floor E-1 Wing,
Karmayogi Bhavan, Sector-10A, Gandhinagar - 382010, Gujarat
14. The bid should be submitted latest byAs stated on [Cl. 20.1 & 20.2]
15. The bid will be opened at Gandhinagar Railway & Urban [Cl. 23.1 ]
Development Corporation Limited (GARUD)
Block no. 3, 3rd Floor E-1 Wing, Karmayogi Bhavan, Sector-10A,
Gandhinagar - 382010, Gujarat
As stated on online NIT
16. The Bank Draft in favor of Gandhinagar Railway and Urban
Development Corporation Ltd
18. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common basevalue) for works
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
19. Timeline for execution of work:
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work
to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed
is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty except
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copy of marksheet,
Colour Photograph and the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated Site Engineers do
not resume or do not remain present on site of work, the recovery at the rate of
Rs.15,000-00 per month per Engineer will be made from the bills/deposit/dues of the
contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders. This
information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2025-2026
Work performed in the last five years 2024-2025
(in Rs. Lakhs) 2023-2024
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub-
contractor will also be considered the sub-contract involved execution of allmain
items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar nature over
the last five years** and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date Remark
Name the of work No. contract of period of of explaining
Employer (Rs. issue completion completion* reasons for
Crore) of delay &
order Completed
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contractinvolved
execution of all main items of work described in the bid document, provided, further
that all other qualification criteria are called (in the same name andstyle) in the last
five years** and in current year before the submission of the bid.
Year Name Name Quantity of work performed (Cum/MT) Remarks*
of the of the Cement Masonry Earth Bituminous (indicate
work Employ Concrete Works Work contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name & Value Stipulated Value of Anticipated
of works & No. Address Contract Period of Works* of
State of (Rs. Cr) Completion remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of the
Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name & similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and attach
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who may
provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to
Bidders. (Name of Consultant engaged for project preparations is * ................................. )
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
* Fill the name of Consultant
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the above
during the contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
_ have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for
such works have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by
the Department to verify this statement or regarding any (our) competence and
general reputation.
4. The Undersigned understands and agrees that further qualifying information may
be requested, and agrees to furnish any such information at the request of the
Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake that our firm
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 37 37 Bill of Quantities
2 Interpretation 38 38 Changes in the Quantities
3 Language and Law 39 39 Variations
4 Engineer’s Decisions 39 40 Payments for Variations
5 Delegations 39 41 Cash Flow Forecasts
6 Communications 39 42 Payment Certificates
7 Sub-Contractors 39 43 Payments
8 Other Contractors 39 44 Compensations Events
9 Personnel 40 45 Tax
10 Employer’s & Contractor Risk 40 46 Currencies
11 Employers Risks 40 47 Price Adjustment
12 Contractor’s Risk 40 48 Retention
13 Insurance 40 49 Liquidated damages
14 Site Investigations Reports 41 50 Bonus
15 Queries about the Contract 41 51 Advance Payment
16 Contractors to Construct the 41 52 Securities
17 The Works to be Completed By 41 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 41 54 Cost of Repair
20 Discoveries 42 E. Finishing the Contract
21 Possession of the Site 42 55 Completion
22 Access to the Site 42 56 Taking Over
23 Instructions 42 57 Final Account
24 Disputes 42 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 43 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 44 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 44 F. Special Conditions of
30 Delays Ordered by The 44 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions
of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming
part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by
the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects Liability
Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement of
the Engineer) who is responsible for supervising the Contractor, administering the
Contract, certifying payments due to the Contractor, issuing and valuing Variations
to the Contract, awarding extensions of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s
Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in the
Contract Data. The Intended Completion Date may be revised only by the Engineer by
issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor
shall commence execution of the works. It does not necessarily coincide with any of
the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on the
Temporary Works are works designed, constructed, installed, and removed
by the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male
also means female or neuter and the other way around. Heading have no
significance. Words have their normal meaning under the language of the
Contract unless specifically defined. The Engineer will provide instructions
clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to
the Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual
matters between the Employer and the Contractor in the role representing the
5.1 The Engineer may delegate any of his duties and responsibilities to other people
after notifying the Contractor and may cancel any delegation after notifying the
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontractingshall
not alter the Contractor’s obligations. Sub-contracting of supply or specific
items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for
the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,public
authorities, utilities and the Employer between the dates given in the Schedule
of other Contractor. The Contractors shall as refer to in the Contract Data, also
provide facilities and services for them as described in the Schedule. The
employer may modify the schedule of other contractors and shall notify the
contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated
in the Schedule or other personnel approved by the Engineer. The Engineer will
approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or
better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor shall
ensure that the person leaves the Site within seven days and has no further
connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks,
and the Contractor carries the risks which these Contracts states are
Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they
directly affect the execution of the Works, the risks of war, hostilities, invasion,
act of foreign enemies, rebellion, revolution, insurrection or military or
usurped power, civil war, riot commotion or disorder (unless restricted to the
Contractor’s employees), and contamination from any nuclear fuel or nuclear
waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the
Contract other than the excepted risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to
the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required,
the Employer may affect the insurance which the Contractor should have
provided and recover the premiums the Employer has paid from payments
otherwise due to the Contractor or, if no payment is due, the payment of the
premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the approval
of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports
referred to in the Contract Data, supplemented by any information available to
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall
carry out the Works in accordance with the programme submitted by the
Contractor, as updated with the approval of the Engineer, and complete them
by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing theproposed
Temporary works to the Engineer, who is to approve them if they comply with
the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design
of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary
or permanent work are subject to prior approval by the Engineer before their
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and this
will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is
not handed over to the Contractor, then contractor/ Employer may fore-close
the contract. Contractor/Employer has to foreclose the work within 30 days
after lapse of 25%-time limit and after 30 days foreclosure option will be
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts
and records relating to the performance of the Contractor and to have them
audited by auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to #Superintending
Engineer(Higher Authority)within 14 days of the notification of the Engineer's
decision. If the issue is not resolved, any party can refer the matter for
conciliation within 15 days from the decision given by the #Superintending
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the #Superintending Engineer, both the parties have to
refer to the Chief Engineer concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the #Superintending Engineer, both the parties have
to refer to the #Secretary, Roads & Building Department, Government of
Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within
days of the notification of the Engineer's decision, the Contractor shall not be
entitled to any additional payment/claim if he doesn’t follow the above
sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along with
monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved on
the timing of the remaining work including any changes to the sequence of
the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract data.
If the Contractor does not submit an updated programme within this period,
the Engineer may withhold the amount stated in the Contract data from the
next payment after the date on which the overdue programme has been
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible forcompletion
to be achieved by the Intended Completion Date without the Contractor taking
steps to accelerate the remaining work and which would cause the Contractor
to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting
full supporting information. If the Contractor has failed to give early warning
of a delay or has failed to cooperate in dealing with a delay, the delay by this
failure shall not be considered in assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer his
decision. The employer shall in not more than 21 days communicate to the
engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the extension
and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific
likely future events or circumstances that may adversely affect the quality of
the work, increase the Contract price or delay the execution of works. The
Engineer may require the contractor to provide an estimate of the expected
effect of the future event or circumstance on the contract price and completion
date. The estimate is to be provided by the Contractor as soon as reasonably
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided
or reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
33.1 : Defect liability period : The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion.
The Engineer in charge shall give the contractor a notice in writing about the
defects and the contractor shall make good the same within 15 days of receipt
of the notice. In the case of failure on the part of the contractor, the Engineer-
in-charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole
or any part of the amount of security deposit towards the expenses, if any,
Incurred by him in rectification, removal or re-execution. The Defects Liability
period shall be as under….
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall
be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be 36Months
from the certified date of completion which should include three monsoons.
(d) For original building works the defect liability period will be 4 years or elapse
of 4 monsoon period following date of possession of building taken over by
user agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No.TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from
the certified date of completion. During this period the contractor shall visit
the site every six months along with the concerned Section Officer / Deputy
Executive Engineer and will examine the work already carried out in this
contract like road work, jungle cutting, side shoulders, side gutter, road
furniture, patta etc. and will prepare Km. wise inspection report duly signed
by all concerned and any defect observed shall be done within 15 days by
the contractor at his risk and cost as per the direction of Engineer in charge.
The contractor needs to do videography of these visits andrequire to submit
at the time of release of FMG. If B.T. the surface during the maintenance
period of 4 years is worn out then agency shall have to provide renewal
coating as per tender item as directed by the Engineer-in- charge. The
amount equivalent to 5% of each running bill shall be withheld and will be
released after the free maintenance guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under
no circumstances shall exceed the allowable limit set forth in the relevant
clause for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment /
cutting for side shoulders, side gutters, kilometer / indicator / guard stones,
sign boards etc. are completed in all respect by the contractor. After
completion of the miscellaneous items, the above said 2% withheld amount
shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as
per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work
costing more than Rs. 5.00 Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by engineer’s
representative) by contractor in writing, Rs.2,00,000/- shall be withheld.
The qualified quality Engineer shall be deployed exclusively for this
contract by the contractors. If quality Engineer is not deployed by
contractor within one month after the date of work order, the amount
equivalent to Rs.20,000 per month shall be recovered till the actual
deployment of quality engineer. The amount so recovered towards the
deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own
risk and cost, the existing lane(s) of the road so that the traffic worthiness
and safety thereof are at no time materially inferior as compared to their
condition 10 (ten) days prior to the date of the Agreement, and shall
undertake the necessary repair and maintenance works for this purpose;
provided that the Contractor may, at his cost, interrupt and divert the flow
of traffic if such interruption and diversion is necessary for the efficient
progress of works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the
Contractor only with the prior written approval of the Executive Engineer
which approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be responsible for
ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of
any defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a Defect
and to uncover and test any work that the Engineer considers may have a
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it
does, the Contractor shall pay for the test and any samples. If there is no defect
the test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of
actual charges.
34.3 Agency has to establish testing laboratory on site for the various test to be
carried out in the work for this purpose agency shall construct a pukka
laboratory building with all facility on site at location specified by the engineer
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end
of the defects Liability Period, which begins at Completion and is defined in the
contract data. The Defects Liability Period shall be extended for as long as
Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the
same conditions in all respects on which he agreed to do the main work and at
the same rate as are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender
by more than 130%, the contractor will be paid for the quantity in excess of
130%, at the rate entered in the SOR of the year during which the excess in
quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate
is specified in this contract, then such class of work shall be carried out as
(i) At the rate derived from the item within the contract which is comparable to
the one involving additional or altered class of work; where there are more
than one comparable items, the item of the contract which is nearest in
comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii)If the rate cannot be derived in accordance with (i) above, such class of works
shall be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the “Schedule of Rates” of the Division in the year
in which the tender was received. If the Schedule of rates of the Division does
not contain all the items, the percentage increase or decrease of the tender shall
be calculated considering such items which were included in the “Scheduled
Rates” of the division for the year and for materials consumed on such item the
rate to be charged would be the basic rate taken into accountfor fixing the
rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work
shall be carried out at the rate decided by the competent authorities on the
basis of detailed rate analysis after hearing the contractor before a Committee
of two Superintending Engineers stationed at the same place orthe nearest
40.2 If the additional or altered work, for which no rate is entered in the “Schedule
of Rates” of the Division is ordered to be carried out before the rate is agreed
upon, then the contractor shall within seven days of the date of receipt by him
of the order to carry out the work, inform the Engineer-in-charge of the rate,
which it is his intention to charge for such class of work and if the Engineer in
charge does not agree to this rates, he shall by notice in writing be at liberty
to cancel his order to carry out such class of work and arrange to carry it out in
such manner as he may consider it advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereof
before the rates shall have been determined as lastly herein before mentioned,
then in such cases he shall only be entitled to be paid in respect of the work
carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of the dispute, the decision of
the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by
the competent authority, the alternation above referred to shall be within the
scope of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the
cost of the original work and the certificate of the Engineer-in-charge as to such
proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with
an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount certified
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days
and certify the amount to be paid to the Contractor after taking in to account
any credit or debit for the month in question in respect of materials for the
works in the relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the
items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or reduce
the proportion of any item previously certified in any certificate in the light of
later information
43.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
under the law. The Employer shall pay the Contractor the amounts certified by
the Engineer within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to
the Contractor will be made by the Employer. Hence, it is the responsibility of
the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and prices in
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed
beyond the Intended Completion Date then Authority will approve EOT with
eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on
due date of bid submission except GST. However, any subsequent changes in
the tax structure by Government after due date of bid submission will be
compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the
tax structure after bid submission. If the contractor fails to provide such
information and if any financial obligation may arise due to change in tax
structure, same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion date
or extensions granted by the Engineer and shall not apply to the work
carried out beyond the stipulated time for reasons attributable to the
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include theamount
of secured advance granted, if any, during the month less the amount of
secured advance recovered, if any during the month. It will exclude value
for works executed under variations for which price adjustment will be
worked separately based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor
is not covered by the provisions of this or other clause in the contract, the unit
rates and prices included in the contract shall be deemed to include amounts
to cover the contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor theproportion
stated in the Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has passed
and the Engineer has certified that all Defects notified by the Engineer to the
Contractor before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted
by the Employer under the provision of this clause, Employer shall consider the
said request of the Contractor provided that the refund hereunder shall be
made in tranches of not less than 1% (One Percent) of the Contract Price and
Contractor furnishes an irrevocable and unconditional Bank guarantee for an
equal amount substantially in the format of Bank Guarantee for Performance
Guarantee enclosed with SBD and valid up to 60 day beyond the scheduled /
extended Defects Liability Period. On completion of the whole works, the
contractor has however an option to submit a fresh irrevocable and
unconditional Bank Guarantee for an amount equal to 5% of the total value of
work executed substantially in the format of Bank Guaranteefor Performance
Guarantee enclosed with SBD and valid up to 60 days beyond the Defect
Liability Period and yet refund the Retention Money Bank Guarantee submitted
for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per
day stated in the Contract Data for each day that the Completion Date is later
than the Intended Completion Date (for the whole works or the milestone as
stated in the contract data). The total amount of liquidated damages shall not
stated in the contract data). The total amount of liquidated damages shall not
exceed the amount defined in the Contract Data. The Employer may deduct
liquidated damages from payment due to the Contractor. Payment ofliquidated
damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated damages
by the Contractor by adjusting the next payment certificate. The Contractor
shall not be entitled for any interest on the over payment calculated from the
date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in
the tender, then the contractor shall pay to the employer the relevant sum
stated in the Contract Data as Liquidated damages for such default and not as
penalty for everyday or part of day which shall elapse between relevant time
for completion and the date stated in the taking over certificate of the whole of
the works on the relevant section, subject to the limit stated in the contract
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve
the contractor from his obligation to complete the works on from any other of
his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable
any Section, a Taking Over Certificate has been issued for any part of the Works
or of a Section, the liquidated damages for delay in completion of the remainder
of the Works or of that Section shall, for any period of delay after the date stated
in such Taking-Over-Certificate, and in the absence of alternative provisions in
the Contract, be reduced in the proportion which the value of the part so
certified bears to the value of the whole of the Works or Section, as applicable.
The provisions of this Sub-clause shall only apply to the rate of liquidated
damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall pay
to the contractor a sum stated in Contract Data as bonus for every completed
month but subjected to maximum amount as stated in Contract Data;
which shall elapse between the date of completion of all items of works as
stipulated in the contract, including variations ordered by the Engineer and the
time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time
limit of the works is equal or more than 6 months. The bonus would be paid as
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the Contract
Date by the date stated in the Contract Date, against provision by the Contactor
of an Unconditional Bank Guarantee in a form and by a bank acceptable to the
Employer in amounts and currencies equal to be at least 110% of the advance
payment. The guarantee shall remain effective until the
advance payment has been repaid, but the amount of the guarantee shall be
progressively reduced by the amounts repaid by the Contractor. The
Mobilization advance would be deemed as interest bearing advance at an
interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,plant
and Mobilization expenses required specifically for execution of theWorks. The
Contractor shall demonstrate that advance payment has been used in this way
by supplying copies of invoices or other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate amount from
payments otherwise due to the Contractor, following the schedule of completed
percentages of the Works on a payment basis. No account shall be taken of the
advance payment or its repayment in assessing valuations of work done,
variations, price adjustments, Compensation Events, or Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids)
shall be provided to the Employer no later than the date specified in the Letter
of Acceptance and shall be issued in an amount and form and by a bank or
surety acceptable to the Employer, and denominated in Indian Rupees. The
performance Security shall be valid until a date 60 days from the date of expiry
of Defects Liability Period and the additional security for unbalanced bids shall
be valid until a date 28 days from the date of issue of the certificate of
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion
of the works and the Engineer will do so upon deciding that the work is
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total
amount that the Contractor considers payable as full and final settlement of all
claims under the Contract for items before the end of the Defects Liability
Period. The Engineer shall issue a Defect Liability Certificate and certify any
final payment that is due to the Contractor within 56 days of receiving the
Contractor's account if it is correct and complete. If it is not, the Engineer shall
issue within 56 days a schedule that states the scope of the corrections or
additions that are necessary. If the Final Account is still unsatisfactory after it
has been resubmitted, the Engineer shall decide on the amount payable to the
Contractor and issue a payment certificate, within 56 days of receiving the
Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses
and savings in final account is observed, the Engineer/Employer shall be at
liberty to restrict the final payment of BOQ items to the lowest amount
evaluated of the bids considering the final quantities and the rates quoted
including the rebates if any. Payment of variation items shall however be made
at the rates approved by the Employer, within 90 days from the physical
completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required,
the Contractor shall supply them by the dates stated in the Contract data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates
stated in the Contract data, or they do not receive the Engineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from payments
due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is shown
on the current programme and the stoppage has not been authorized by the
2. The Engineer instructs the Contractor to delay the progress of the Works
and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within
a reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days
for which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence
a procurement process or the execution of a contract to the detriment of the
borrower, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive levels
and to deprive the Borrower of the benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by
the Contractor, the Engineer shall issue a Certificate for the value of the work
done less advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to the
work not completed as indicated in the Contract data. Additional Liquidated
Damages shall not apply. If the total amount due to the Employer exceeds any
Damages shall not apply. If the total amount due to the Employer exceeds any
payment due to the Contractor the difference shall be a debt payable to the
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought
by the contractor and available at site, the reasonable cost of removal of
equipment, repatriation of the Contractor’s personnel employed solely on the
works, and the Contractor’s cost of protecting and securing the Works and less
advance payment received up to the date of the certificate, less other recoveries
due in terms of the contract and less taxes due to deducted at source as per
applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because
of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after receiving this
certificate and shall be paid for all work carried out before receiving itand
for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make
his own arrangements for the engagement of all staff and labour, local or other,
and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer
a return in detail, in such form and at such intervals as the Engineer may
prescribe, showing the staff and the numbers of the several classes of labour
from time to time employed by the Contractor on the site and such other
information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and rules
made thereunder, regulations, notification and bye laws of the State or central
Government or local authority and any other labour law (including rules),
regulations, bye laws that may be passed or notifications that may be issued
under any labour law in future either by the State or the Central Government
or the local authority. Salient features of some of the major labour laws that are
applicable to the construction industry are given below. The Contractor shall
keep the Employer indemnified in case any action is taken against the
Employer by the competent authority on account of contravention of any of the
provisions of any Act or rules made thereunder, regulations or notifications
including amendments. If the Employer is caused to pay or reimburse, such
amounts as may be necessary to cause or observe, or for observance of the
provisions stipulated in the notifications/bye laws/Acts/Rules/regulations
including amendments, if any, on the part of the Contractor, the
Engineer/employer shall have the right to deduct any money due to the
Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor any
sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in case
of injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the
Act on satisfaction of certain conditions on separation if an employee has
completed 5 years service or more on death, the rate of 15 days wages for every
completed year of service. The Act is applicable to all establishments employing
or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The
benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits
to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for
certain welfare measures to be provided by the Contractor to contract labour and
in case the Contractor fails to provide, the same are required to be provided, by the
Principal Employer by Law. The principal Employer is required to take Certificate
of Registration and the Contractor is required to take license from the designated
Officer. The Act is applicable to the establishments or Contractor of Principal
Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if
the employment is a scheduled employment. Construction of Building, Roads,
Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to
be paid, when it will be paid and what deductions can be made from the wages
of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equalwages
for work of equal nature to Male and Female workers and for not making
discrimination against female employees in the matter of transfer, training and
promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual bonus
subject to a minimum of 8.33% of wages and maximum of 20 % of wages to
employees drawing Rs. 3500/- per month or less. The bonus to be paid to
employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted
for five years in certain circumstances. Some of the State Governments have
reduced the employment size from 20 to 10 for the purpose of applicability of this
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure
for resolutions of Industrial disputes, in what situations a strike or lock-out
becomes illegal and what are the requirements for laying off or retrenching the
employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by
some of the State and Central Government to 50). The Act provides for laying
down rules governing the conditions of employment by the Employer on matters
provided in the Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the Act
have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits
employment of children below 14 years of age in certain occupations and process
and provides for regulation of employment of children in all other occupations
and processes. Employment of Child labour is prohibited in Building and
Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions
of service) Act 1979:- The Act is applicable to an establishment which employs
5 or more inter-state migrant workmen through an intermediary (who has
recruited workmen in one state for employment in the establishment situated in
another state).The inter-state migrant workmen, is an establishment to which this
Act becomes applicable, are required to be provided certain facilities such as
housing, medical aid, traveling expenses from home upto the establishment and
O) The Building and Other Construction workers (Regulation of employment
and Conditions of Service) Act 1996 and the Cess Act of 1996:- All the
establishments who carry on any building or other constructions work and
employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of
the cost of construction as may be modified by the government. The Employer of
the establishment is required to provide safety measures at the Building or
construction work and other welfare measures, such as canteens, First Aid
facilities, Ambulance, Housing accommodations for workers near the workplace
etc. The Employer to whom the Act applies has to obtain a registration certificate
from the Registering Officers appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable to
premises employing 10 persons or more with aid of power or 20 or more persons
without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from
time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management
plan for best energy use, waste management, the reductionof pollution as
in EMS (Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to #Superintending
Engineer (Higher Authority) within 14 days of the notification of the Engineer's
decision. If the issue is not resolved, any party can refer the matter for
conciliation within 15 days from the decision given by the #Superintending
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Superintending Engineer, both the parties have to refer to
the #Chief Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with
the decision of the Superintending Engineer, both parties have to refer to
the #Secretary, Roads & Building Department, Government ofGujarat for
the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract Dispute
Arbitration Tribunal. If the Contractor fails to refer a claim / dispute to the
Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional
payment/claim if he doesn’t follow the above sequence in stipulated time.
However, during such period, he would not stop the work in any case.
Clause Reference With
respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Gandhinagar Railway and Urban Development Corporation
Address: Block no. 3, 3rd Floor E-1 Wing, Karmayogi Bhavan, Sector-
10A, Gandhinagar - 382010, Gujarat.
Name of authorized Representative (will be intimated later)
2. The Engineer is
Name of Authorized Representative: To be intimated to contractor
after award of contractor
3. The Defects Liability Period is 1 year or Elapse of 1 monsoon [CL.1.1&33]
Period from the date of completion.
4. The Start Date shall be 1st days for the date of issue of the Notice [CL.1.1]
to proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
6 Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
Milestone 1 i.e. 25 % 45 . days.
Milestone 2 i.e. 50 % 90 . days
Milestone 3 i.e. 75 % 135 . days .
Milestone 4 i.e. 100 % 180 . days
6. The Site is located at Gandhinagar. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of Building work with items as per [CL.1.1]
B.O.Q. The works shall, inter alia, include the following, as
Specified or as directed:
Site clearance; setting – out and layout; widening of existing carriageway
and strengthening including camber corrections; construction of new
road/ Parallel service road; bituminous pavements
remodeling/construction of Junctions, intersections, bus bays, lay-bays;
supplying and placing of drainage Channels, flumes, guard posts and
guard other related items; construction/extension of cross drainage
works, bridge, approaches and other related stones; protective works for
roads/bridge; all aspects of quality assurance of variouscomponents of
the works; rectification of The defects in the completed works during the
Defects Liability Period; submission of “As- built’’ drawings and any
other related documents; and other item of work as may be required to
be carried out for completing the work in
accordance with the drawings and the provisions of the contract and to
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments and
bearing; prestressed/reinforced cement concrete superstructure;
wearing coat, hand railings, expansion joints, approach slabs, drainages
spouts/ downtake pipes, arrangements for fixing light posts, water
mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs etc.;
all aspects of quality assurance; clearing the site and handing over the
works on completion; rectification of the defects during the Defects
Liability Period and submission of “As-built” drawings and other related
documents; and other items of work as may be required to be carried out
for completing the works in accordance with the drawings and the
provisions of the contract and to Insure safety
(C) Other Items : As per the BOQ [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the Bid
10. The following documents also form part of the Contract: [CL.2.3(9)]
As per clause 2-3
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death
is Rs. 5 lakhs per occurrence with the number of occurrences limited
to four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
(d)Building Work
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be Ist Day of work order given. [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 45 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs 50 THOUSAND
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the
course of execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g. ordinary soil
to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps,
etc. not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii)Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such
that the gross % weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to
labour shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for local
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of opening
of technical Bids as published by Labour Bureau, Ministry
of Labour, Government of India
Li = The consumer price index for industrial workers for the State
for the month under consideration as published by the
Labour Bureau, Ministry of Labour, Government of India.
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of
cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in rates
C0 = The all India wholesale price index for Ordinary Portland
Cement on 28 days preceding thescheduled date of
opening of technical bid as published by the Office of
the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration as
published by Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry
of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products Rebars)
on 28 days preceding the date of opening of Bids as published by the Office of the
Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long Products
Rebars) for the month under consideration as published by Office of the
Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest
centre on the day 28 days prior to the scheduled date of opening of
Bi = The official retail price of bitumen of IOC depot at the nearest centre
for the 15th day of the month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to the
date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of
IOC at the nearest centre for the 15th day of the month of the under
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has
been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in accordance
with the following formula
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts
has been chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials other
than cement, steel, bitumen and POL procured by the contractor shall
be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than
cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on 28 days
preceding the scheduled date of opening of technical Bids, aspublished
by the Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the month
under consideration as published by the Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement,
steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
1. Labour -Pl 21.832 %
2. Cement – Pc 7.179 %
3. Steel - Ps 12.890%
4. Bitumen - Pb 0.000%
6. Plant & Machinery Spares Pp 10.753%
7. Other Materials - Pm 46.025%
25. The proportion of payments retained (retention money) shall be 6% {CL. 48}
from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49}
delay in completion of works (1/2000)th of the Initial contract
price, rounded off to the nearest
Thousand, per day. For sectional
Completion (wherever specified In
item 6 of Contract data) (1/2000)th of
initial contract price for #5 km
Section, rounded off to the nearest
thousand per day.
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given
as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
#Nature of Advances Amount (Rs.) Conditions to
i Mobilization 10% of the contract On submission of unconditional
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The contractor
may furnish four bank guarantees
of 2.5 % of each valid for the full
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is
equipment. Total amount satisfied That the equipment is
equipment. Total amount satisfied That the equipment is
will be subject to a required for performance of the
maximum of 5% of the contract) and on submission of
Contract Price unconditional Bank Guarantee for
amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after
fulfillment of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the interim
payments certified by the Engineer under the Contract. Deduction shall commence
in the next Interim Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than 20 percent
of the Contract Price or 6 (six) months from the date of payment of first installment
of advance, whichever period concludes earlier, and shall be made at the rate of
percent (collectively for both Mobilization Advance and Equipment Advance)
of the amounts of all Interim Payment Certificate until such time as the loan has
been repaid, always provided that the loan shall be completely repaid prior to the
expiry of the original time for completion pursuantto Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL. 52}
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be
decided after evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an
unconditional Bank Guarantee of the type as presented in Section 8 of the Bidding
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58} are
required within 28 days of the issue of certificate of completion of the whole or
section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by
the Date required is Rs. 10.00 Lakhs.
37. The following events shall also be fundamentals breach of contract: {CL.59.2} “The
Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl 60}
the Employer’s additional cost for completing the Works shall be 20 per cent.
TECHNICAL SPECIFICATION
(As Per Attachment)
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in
conformity with the conditions of Contract, specification, drawings, Bill of Quantities
and Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably
possible after the receipt of the Engineer’s notice to commence, and to complete the
whole of the Works in the Contact within the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for
receiving the same, and it shall remain binding upon it and may be accepted at any
time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together with
your written acceptance thereof, shall constitute a binding contract betweenus.
5. We understand that you are not bound to accept the lowest or any tender you may
------- duly authorized to sign bids for and on behalf of -----------------------------------
(in block capitals or typed)
BILL OF QUANTITIES
(as per attached sheet)
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructionalplant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
ITEM DESCRIPTION UNIT QTY Rate (INR)
A CIVIL & INTERIOR
Demolition : Demolition including stacking of
1 serviceable materials and disposal of unserviceable Cum
materials with all lead and lift. (i) R.C.C. work
Demolition of Brick work and stone masonry
including stacking of serviceable materilas and
2 disposal of unserviceable materials with all lead and Cum
lift.(ii) In Cement
Dismentling wood work, wrought framed and fixed
3 in frames trusses including stacking the materials Cum
with all lead and lift.
Clearing and grubbing road land including uprooting
rank vegetation grass bushes,shrubs,sapling and
4 trees girth up to 300 mm removal of stumps of trees Sqm
cut earlier and disposal of unserviceable materials (C)
By mechanical means in area of light jungle
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter 279.00 122.99
lead.(A) Loose or soft soil
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. In layers
not exceeding 20 cm. in depth consolidating each 13.00 136.92
disposited layer by ramming and watering.
Filling in foundation and plinth with murrum or
7 selected soil in layers of 20cm. thickness including Cum
watering, ramming and consolidating etc. complete.
Filling in plinth with sand under floors including
8 watering ramming, consolidating and dressing Cum
P.C.C : Providing and laying cement concrete 1:2:4 (1-
Cement : 2- Coarse sand : 4- graded stone aggregates
20 mm nominal size) and curing complete including 14.00 3,661.30
cost of formwork in (A) Foundation and Plinth
Providing and laying controlled cement concrete
M.250 and curing complete excluding the cost of
10 formwork and reinforcement for reinforced concrete Cum
work in (A)Foundations, footings, Base of columns
and Mass concrete.
Providing and laying controlled cement concrete
M.250 concrete With all lead, including all
transportation, pumping, pouring, curing of concrete
etc complete including the cost of formwork but
11 excluding the cost of reinforcement for reinforced Cum
concrete work in M250 all RCC element lik, © Slabs,
landing,Stair case, Lintels, Coping, shelves, Balconies,
Beams, Girders, Cantilever, Columns, Pillars posts
and struts, all floor level all floor level.
GRADE SLAB (M200) : Providing and laying controlled
cement concrete M.200 Concrete with all lead,
including all transportation, pumping, pouring, curing 23.00 4,839.96
of concrete etc complete including the cost of
formwork but excluding the cost of reinforcement for
reinforced concrete work in M200 Grade Slab
Providing TMT Bar FE 500D reinforcement for R.C.C.
13 work including bending, binding and placing in Kg
position complete at all floor levels
Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg./Sq.Cm.
in foundation and plinth, in Cement Mortar 1:6 (1- 2.00 4,214.09
Cement : 6 -fine sand) (B) Conventional
Providing 10mm thick cement plaster in single coat
on brick/concrete walls for interior plastering upto
floor two level and finished even and smooth in (i)
15 Cement mortar 1:3 (1-cement:3-sand), interior Sqm
plastering above floor two level for every additional
storey height. all type of scaffolding , tools, tackles
etc complete. (For all floor) (144.21 + 21.67 = 165.88)
Providing 20 mm thick double coat mala cement
plaster on interior and external brick / concrete work
for plastering comprising of base coat of 12 mm thick
cement plaster in cement mortar (1 Cement :
coarse sand) in rough finishing and 8 mm thick top 756.00 286.10
coat of cement mortar 1:2 (1 Cement : 2 Coarse sand)
finished with trovel including all level, scaffolding,
curing, tools, tackles etc complete. ( For all floor )
Providing 15mm thick cement plaster in single coat
on Rough (Similar)side of single or half brick walls for
interior plastering upto floor two level and finished
even and smooth in (iii) Cement mortar 1:6 (1-
cement:6-sand) interior plastering above floor two 1,350.00 145.65
level for every additional storey height. all type of
scaffolding , tools, tackles etc complete. (For all floor)
Providing and applying external finish of average
to 2.5mm thick acrylic polymer based texture and
pattern with standard tool and applicator as
specified by manufacturer on exterior surfaces at all
heights including scaffolding to give even shades
including thoroughly brushing the surfaces free from
mortar droping and other foreign matter and sand
paper smoothed etc. complete as per the 756.00 301.99
manufacture specifications and up to the
satisfaction of Engineer in-charge/ Architect. The
rate includes making of grooves, pattas and finishing
as directed by Architect/ EIC. Paint shall be
measured and paid in seperate tender item. (Item
should be executed by approved applicator only.)
Providing and laying broken chine mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain
or slope and to be tempered to bring mortar creme
out upto surface using white cement including 158.00 779.70
rounding off junctions and extending them upto
cm along the wall,clearing with water and oxalic acid
etc. as directed.
Vitrified Flooring : Providing and laying Lapato /
Glossy/Matt/Rustic finish Vitrified tiles flooring
using minimum 10 mm thick tiles as per approved
make list or selected by Architect , tile size (1200
equivalent size as per instruction of EIC/Architect)
including preparing base for leveling with 20mm
20 thick cement mortar 1:6 (1 cement : 6 coarse sand ) Sqm
and jointed with 3mm thick laticrete grouting of
approved shade and colour in proper line and level
as per detailed drawing / instruction and approval
by architect.The rate shall be inclusive of protecting
the flooring by plaster of Paris and plastic and/or
bubble top sheets. Basic rate of tile is Rs. 60/Sqft.(
At all floor area)
Vitrified Flooring (Type-01) : Providing and laying
Vitrified tiles 8 to 10 mm thick , in skrting risers of
21 steps and dedo on 10mm thick cement plaster 1:3 (1- Sqm
cement : 3-coarse sand) and jointed with white
Providing and laying polished Kota stone slab flooring
over 20mm (Average) thick base of cement mortar
1:6 (1-cement : 6-coarse sand) or L.M. 1.1.5 (1-Lime
22 putty :1.5 - coarse sand) laid over and jointed with Sqm
grey cement slurry mixed with pigment to match the
shade of slab including rubbing and polishing etc.
complete. (A) 25mm thick
Window : Providing and fixing factory made (size as
per EIC/Architect) upvc fenesta wooden colour
sliding glazed window with Mosquito net and
Approved sample by Architect/Client/EIC. all height
dimension comprising of upvc multi chambered
frame with in built roller track and sash extruded
profiles duly reinforced with 1.60 + 0.2 mm thick
galvanizd mild steel section made from roll forming
process of required lenght ( shape & size according
to upvc profile ), appropriate dimension of upvc
extruded glazing beads and upvc extruded
interlocks, epdm gasket,wool pile,zinc alloy (white
powder coated) touch locks with hook,zinc alloy
body with single nylon rollers (weight bearing
23 capacity to be 40 kg),g.i. fasteners 100 x 8 mm size Sqm
for fixing frame to finished wall and necessary
stainless steel screws etc. profile of frame & sash
shall be mitred cut and fusion welded at all
corners,including drilling of holes for fixing
hardware's and drainage of water etc. after fixing
frame the gap between frame and adjacent finished
wall shall be filled with weather proof silicon sealant
over backer rod of required size and of approved
quality,all complete as per approved drawing &
direction of engineer-in-charg. Three track Three
panels sliding window of 5 mm thick toughen glass
and series 2000 frame 65 x 58 mm & sash 45 x
mm both having wall thickness of 1.9+ 0.2 mm and
single glazing bead of appropriate dimension.
Core cutting : Providing and wet drilling accurate and
clean holes of specified diameter in RCC walls, slabs,
beam or any other RCC member without vibration by
core cutting (diamond drilling) machine including
scafolding, safety majors, disposing the debris,
cleaning for all levels/ all height as per structural
24 consultant's drawing, after approval of engineer in Nos
charge etc compete. Rate shall be inclusive of filling
the hole with non shrink grout/Chemical Anchoring
in good manner. Measurement shall be taken for the
depth of holes in running meter for specified
diameter. Holes shall made by authorised approved
agency. (a) holes from 100mm to 150 mm dia.
Core cutting : Providing and wet drilling accurate and
clean holes of specified diameter in RCC walls, slabs,
beam or any other RCC member without vibration by
core cutting (diamond drilling) machine including
scafolding, safety majors, disposing the debris,
cleaning for all levels/ all height as per structural
25 consultant's drawing, after approval of engineer in Nos
charge etc compete. Rate shall be inclusive of filling
the hole with non shrink grout//Chemical Anchoring
in good manner. Measurement shall be taken for the
depth of holes in running meter for specified
diameter. Holes shall made by authorised approved
agency. (b) holes from 150 mm to 300 mm dia.
SS RAILING : Providing & Fixing Stainless steel
grade pipe railing Horizontal 50 mm dia. 2 Nos. and
Supprt pipe from wall 16mm Dia. at everymax
0.90mtr C/C including welding, grinding, buffing,
polishing and making curvature (wherever required)
and fitting the same with necessary stainless steel
nuts, Plates and bolts complete, i/c fixing the railing 25.00 2,872.66
with necessary accessories & stainless steel dash
fasteners, stainless steel bolts etc., fixed on Concrete
or brick work . Rate including of all materials.labour,
fixing & polishing etc. comp. as per Drawing and
Approve by Engineer In Charge
WATER PROOFING : Providing and laying composite
built up waterproofing in the toilets/ kitchen/ pantry
etc. after proper surface preparation, carry out
cementitious injection grouting at leakage points
using Cebex 100 Plasticised expandive grout
admixture, or equivalent, application of polymer
27 modified vatta at slab-wall junction using Nitobond Sqm
SBR Latex-screed modifier cum bonding agent,
treatment of pipe cutouts using polymer modified
mortar and application of two coats of Brushbond
TGP- Crystalline Capillary Waterproofing systemetc.
complete including all tools and tackles as per
manufacturer's specification.
PLAIN CEMENT CONCRETE WORK : Providing and
laying concrete 1:2:4 (1 cement : 2 coarse sand :
coarse aggregate) in required slopes, average 77.00 4,476.96
thickness as per instructions of EIC/Architect
Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg./Sq.Cm. 246.00 4,202.82
in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(A)
Half brick masonry in common brunt clay building
bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-
coarse sand ) with 2 Nos of 6mm Mild steel round 63.00 693.20
bars after every three course embedded in Cement
Mortar (A) Modular
STONE FLOORING : Supplying and laying 20 mm thick
approved Grey Saracolin #301 (600mmx600mm) (
APPROVED BY Client/ PMC) flooring laid on over a
bed of average 5mm thickcement based polymer
modified adhesive (conforming to ISO 13007) with
pigment to match/contrast the shade of Stone
making sure that the bond between the marble and
the surface of the sub-base is firm and the laid
sample to be approved for workmanship and quality 300.00 6,293.43
acceptance. Cost to include for laying with any gap
which will be filled with Epoxy stain free grout i/c
necessary cutting, metering, curing, cleaning with
complete grinding and Mirror Polishing with
diamond pads etc. including all other necessary
related works as per specifications and schedule and
reference drawing or directed by Project In-charge.
STONE CLADDING :Providing and fixing of 20mm
thick Oliver Beize #300( APPROVED BY Client/PMC)
in Wet Cladding to Columns/Wall with 'V" grooves at
joints, on a backing of cement mortar 1:3 with OPC
43 grade, with minimum 20mm thick laid in proper
plumb and level or as directed and pointed in
approved epoxy grout, grout colour to match stone
34 colour and joints sealed with matching colour Sqm
approved quality sealant, The cost to include
providing , chamfering, etc complete. Cost to include
labour, materials, wastages, cleaning after
completion, necessary protection and inclusive of all
lead, lifts etc complete, all as per the drawings,
specifications and as per the instructions and to the
satisfaction of the project manager.
Providing and fixing MDF board panelling with
mm 'V" grooves at joints, inclusive of all lead, lifts etc
35 complete, all as per the drawings, specifications and Sqm
as per the instructions and to the satisfaction of the
POP CEILING : Providing and fixing in position multi
level POP false-ceiling CORNICE suspended on G.I.
frame work in design as shown in the drawing. The
G.I. frame work consist of Perimeter channel of size
27mm x 0.5mm. Intermediate channel of size 45mm
x 0.5mm thick fixed to ceiling channel with 25mm dry
wall screws at 230mm centers Jointed and finished
with requisite filler, paper tape, finisher suitable for
POP finish with GI jali mesh including necessary
coves and shadow grooves. Rate to include making
necessary cut-outs/openings for light fittings,
diffusers, including monolithic edge profile protector
etc. All components to be of approved makes and
overall spacings should match their
recommendation, standards as per specifications,
schedules and as per reference drawing or directed
by Project In-charge. Note : Only plan surface area
shall be measured for payment. The quote rate
includes making and marking of layout, air tight
partition above ceilings (wherever specified), making
provision in 16 SWG aluminum box section framing 400.00 2,690.00
around ducts with cleat angles, corner connectors,
fasteners, for fixing of all types of AC grills (supply and
fixing of AC grills by HVAC contractor), providing
plywood templates for all services points, iron
mongery, shifting of all materials, cutting, wastage,
all leads, lifts at all levels, scaffolding, labour, making
necessary grooves, profiles, chamfering, edge
finishing, making cutouts as required, making holes,
all tools and tackles, equipments, making provisions
for services, materials such as filler compounds,
adhesives, glues (if any), consumables,
housekeeping, protection before, during and till
handing over to operations etc. complete. Apart from
the above all other terms are to be followed as laid
out in the preamble. All works are to be done as per
approved shop drawing, approved work method, co-
ordinate consultants drawings, coordination with
other related agencies and relevant IS Codes as
refferred in the preamble.
PAINTING : Providing and applying Plastic Emulsion
Paint on Ceiling/walls/all members wherever
required ICI Dulux Paint #600 (White Swan-# 60YY
83/062) Three (3 )or more coats of RAL 9010 , Pure
White Paint will be of approved shade/colour and
quality 3 in 1), shade to give a smooth finish on new
plastered surfaces/Gypsum Board over a coat of
approved primer, including the cost of preparing the 400.00 425.00
surfaces with filling materials (putty), scrapping, sand
papering, scaffolding etc. complete. The putty shall
be made of best quality whiting mixed with double
boiled linseed oil, complete as per Specifications and
as per reference drawing or directed by Project In-
PELMET : Providing and fixing 12 mm thick upto
300mm wide pelmet of
flat pressed 3 layer neneed particle board solid core
mm diametre alluminium curtain Road and brackets
fixing with 25mm x 3mm M.S flat 10cm,long and 75.00 219.36
etc.complete as per approved design, details,
specification including necessary fixing arrangement
screws, nails, glues, drilling as per requirement etc or
directed by Project Incharge.
Toilet Vanity counter: Providing & fixing vanity
counter (size as drawing)(tentative Sixe
2000x600mm) with 20 mm thick Grey Saracolin #301
marrble ( APPROVED BY Client/PMC) with 2 mm thick
chamfer to edges top side on counter top and front
side panel. 2mm chamfer outside along with mitered
joint inside along with necessary silicon sealant as
shown including providing opening of required size &
shape for wash basin made with frame and legs of
75 mm x 50 mm solid wood #503 Box Section with
inner 6mm SS flat profile polished metal lining frame
all side vertically & Horizontally and other inter-
39 connecting ties, 19mm thick marine. board on top, Each
bottom, sides, partitions, removable panels, shelves,
12 mm thick marine ply for sides & back of drawer,
9mm thick marine ply at back of cabinet & bottom
drawers ,all internal & External surface are cladded
with 4.0mm thick veneer (walnut finish - dark satin
finish) with solid timber lipping , PU matt finish polish
on veneer surface , cancealed drawer runners &
other necessary hardware along with necessary
arrangement for electrical & plumbing installation
etc., as per design and drawing all complete as per
details, Specifications and Schedules and drawing. or
as per directed by project incharge.
Single leaf Door - (of various sizes) Providing,
fabricating and fixing in position 12mm thick BWP
grade plywood as subframe for door
frames.Providing, fabricating and fixing in position
12mm thick and 110 mm wide BWR grade plywood
as subframe for door frames using 6mm dia 100 mm
long Hiliti make masonary screws with countersunk
head and anchor slevees .Wood/ Plywood shall be
treated for antitermite treatment by a two or more
coat Premise Imidacloprid 30.5% SC of approved
make.( Bayer )Providing 10 mm x 12 mm (WD -08)
solid timber lipping to the exposed ply edge and
polishing the same to match the main frame The
quote rate shall include marking of layout or
position of subframe, shifting, wastage, all leads,
lifts at all levels, scaffolding, labour, making cutouts
as required, making holes, all tools and tackles,
equipments, screws / fasteners, housekeeping, All
works are to be done as per approved shop drawing,
approved work method, approved mock up,
consultants drawing, coordination with other
related agencies for electrical conduiting / wiring
Providing ,Fabricating and fixing in position Timber
Door Frame ( as per detail, and specicification or
directed by project in charge. Flush Shutter with
to 4mm ply Veneer #503 on both sides of various
sizes ,Fabricating and fixing in position Timber
41 Flush Shutter with 2.5 to 4mm ply Veneer #509 on Smt
both sides or Glass in timber frame of various sizes
as per specification, design and approved drawing or
as directed by Engineer-INcharge . Timber Shutter (
overall thickness shall not be more than 53mm
thick( 4mm ply veneer +45mm +4mm ply veneer
#509) ) Specification and fabrication of flush
shutter shall be as per the approved specification
sheet and relavent IS Codes. Providing and fixing in
position handles designed and fabricated as per the
approved drawingWood/ Plywood shall be treated
for antitermite treatment by a two or more coat
Premise Imidacloprid 30.5% SC of approved make.(
Bayer )Finished door to be polished in melamine
coating in approved shade and colour after dulty
preparing / sanding the veneer and wood surfaces
to finally reveal open grain smooth finish to match
the control sample The quote rate shall include
making and marking of layout, shifting, wastage, all
leads, lifts at all levels, scaffolding, labour, making
cutouts as required, making holes, all tools and
tackles, equipments, Polishing of timber surfaces
matching to the approved sample with melamine
polish, materials such as filler compounds, adhesives
(if any), consumables required for manufacturing
the above items, fasteners, housekeeping,
protection before, during and till handing over and
all civil related works etc. complete. All works are to
be done as per approved shop drawing, approved
work method, approved mock up, shop drawing,
coordination with other related agencies.
Urinal Partition Providing Febricating and Fixing
10mm thick ANEL finish Urinal partition(560X2400)
with 20mmx4mm metal frame in mate finish with all
43 nessery fittings and hardwear etc. as per design and Sqmt
drawing all complete as per details, Specifications
and Schedules and drawing. or as per directed by
project incharge.
TRAP DOOR : Providing & fxing Trap door consisting
of Solid wood frame work 75mm x50mm thk with
Shutter of 18mm thk Marine Ply 710, with Inside
laminate of 1mm thk & outside 4mm thk MDF, 9.00 12,926.08
Hinges, L/N Key etc. complete as per detailed
drawings as per instruction of engineer in charge.
B PLUMBING WORK
B.1 SANITARY INSTALLATION
1.01 Providing and fixing floor mounted, white vitreous
china single piece, double traps syphonic water
closet of approved brand/make, shape, size and
pattern including integrated white vitreous china
cistern of capacity 10 litres with dual flushing system,
including all fittings and fixtures with seat cover, 58.00 22,766.13
cistern fittings, nuts, bolts and gasket etc including
making connection with the existing P/S trap,
complete in all respect as per directions of Engineer-
1.02 Providing and fixing white vitreous china battery
based infrared sensor operated urinal of approx. size
610 x 390 x 370 mm having pre & post flushing with 30.00 9,974.00
water (250 ml & 500 ml consumption), having water
inlet from back side, including fixing to wall with
suitable brackets all as per manufacturers
specification and direction of Engineer-in-charge.
1.03 Providing and fixing stone slab with table rubbed,
edges rounded and polished, of size 75x50 cm deep
and 1.8 cm thick, fixed in urinal partitions by cutting
a chase of appropriate width with chase cutter and
embedding the stone in the chase with epoxy grout
or with cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 6 mm nominal size)
as per direction of Engineer-in-charge and finished
Granite Stone of approved shade Sqm
1.04 Providing and fixing wash basin with C.I. brackets,
mm C.P. brass pillar taps, 32 mm C.P. brass waste of
standard pattern, including painting of fittings and
brackets, cutting and making good the walls
wherever require:
White Vitreous China Wash basin size 630x450 mm
with a pair of 15 mm C.P. brass pillar taps 55.00 3,311.06
1.05 Providing and fixing 600x450 mm beveled edge
mirror of superior glass (of approved quality)
complete with 6 mm thick hard board ground fixed to Each
wooden cleats with C.P. brass screws and washers
1.06 Providing and fixing toilet paper holder :
C.P. brass Each
1.07 Providing and fixing CP Brass liquid soap container of
standard shape with bracket of the same materials Each
with snap fittings of approved quality and colour.
1.08 Providing and fixing CP Brass 32mm size bottle trap
of approved quality & make and as per the direction Each
of engineer in charge.
1.09 Providing and fixing CP Brass towel ring with
concealed fittings arrangement of approved quality Each
1.10 Providing and fixing CP Brass Coat Hook of approved
quality and colour 58.00 853.75
1.11 Providing ,Fixing of straight / offset type flexible
single body push fit type WC pan connector of with
integral single mould sealing fins made of flexible EVA
body to be fixed with manufacture supplied grease, 58.00 1,272.50
including rubber bush / adaptor for use with C.I pipe
as supplied with the pan connector.
1.12 Providing and fixing C.P. brass Two way bib cock of
approved quality conforming to IS:8931. 58.00 2,066.25
1.13 Providing and fixing CP Health faucet to european
type W.C. of approved quality and make as approved Each
by engineer in charge.
1.14 Providing and fixing C.P. brass angle valve for basin
mixer and geyser points of approved quality Each
conforming to IS:8931 15mm nominal bore
1.15 Providing and fixing C.P. Brass extension nipple (size
15mmx50mm) of approved make and quality as per Each
direction of Engineer-in-charge.
1.16 Providing and fixing uplasticised PVC connection pipe
with brass unions : 45 cm length , 15 mm nominal Each
1.17 Providing and fixing CP Brass soap Dish Holder with
concealed fitting arrangements, of approved quality Each
1.18 Providing and fixing CP Brass towel rail complete with
brackets with CP brass screws with concealed fittings Each
arrangement of approved quality and colour.
1.19 Providing & Fixing of Grab bar 600 mm of non
slipping grip as per standard specification of use in
disabled toilet complete with brackets suitable for Each
wall installation as per approved sample complete in
1.20 Supply installation, testing and commissioning of
Hand drier ,Operating power supply 230 + 10% V Each
TOTAL FOR SANITARY INSTALLATION Sub Total B1
B.2 WATER SUPPLY
2.01 Providing and fixing Chlorinated Polyvinyl Chloride
(CPVC) pipes, having thermal stability for hot & cold
water supply, including all CPVC plain & brass
threaded fittings, i/c fixing the pipe with clamps at
1.00 m spacing. This includes jointing of pipes &
fittings with one step CPVC solvent cement and the
cost of cutting chases and making good the same
including testing of joints complete as per direction
of Engineer in Charge.
Concealed work, including cutting chases and
making good the walls etc.
20 mm nominal dia Pipes Mtr.
25 mm nominal dia Pipes Mtr.
32 mm nominal dia Pipes Mtr.
2.02 Providing and fixing Chlorinated Polyvinyl Chloride
(CPVC) pipes, having thermal stability for hot & cold
water supply, including all CPVC plain & brass
threaded fittings, including fixing the pipe with
clamps at 1.00 m spacing. This includes jointing of -
pipes & fittings with one step CPVC solvent cement
and testing of joints complete as per direction of
Engineer in Charge.
Internal work - Exposed on wall and External Work
20 mm nominal dia Pipes Mtr.
25 mm nominal dia Pipes Mtr.
32 mm nominal dia Pipes Mtr.
40 mm nominal dia Pipes Mtr.
50 mm nominal dia Pipes Mtr.
65 mm nominal dia Pipes Mtr.
2.03 Providing and fixing forged brass operated ball valve
of full flow of superior quality having minimum
working pressure of 16 kg/cm2.
20 mm nominal bore Each
25 mm nominal bore Each
32 mm nominal bore Each
40 mm nominal bore Each
2.04 Supplying, fixing, testing and commissioning of
butterfly valve of PN 1.6 rating with
bronze/gunmetal seat duly ISI marked complete
with nuts, bolts, washers, gaskets conforming to IS
13095 of following sizes as required :
50 mm nominal bore Each
65 mm nominal bore Each
TOTAL FOR WATER SUPPLY SUBTOTAL B2
INTERNAL DRAINAGE SYSTEM
Providing and fixing soil, waste and vent pipes
3.01 Providing, fixing & testing uPVC SWR pipes
confirming to IS 13592 (Type B) alongwith all
required fittings like tees, bends, crosses with or
without access doors jointed with approved solvent
cement as per manufacturer's recommendations, -
fixed to walls and ceilings with clamps complete
including cutting and making good the floors and
walls where required complete of outer diameter.
110 mm OD Metre
75 mm dia Metre
3.02 Providing, fixing, jointing and testing in position the
following uPVC pipes conforming to IS 4985 of
kg/sqcm pressure rating including all fittings, solvent
weld joints, testing complete for drainage system cut
to required length to be laid under floor including
covering all around with cement concrete and
making good the same complete as required.
For waste pipes
40mm OD (6 kg pressure) Metre
50mm OD (6 kg pressure) Metre
63mm OD (6 kg pressure) Metre
3.03 Providing and Fixing 110x110 mm uPVC 'P' trap with
Height riser/Saddle as required size ftting with seal
50 mm of self cleansing design floor/urinal trap
without vent suspended with supporting clamp or in
sunken portion including cutting and making good
the walls and floors wherever required complete in
110 mm inlet & 110 mm outlet Long ht Each
3.04 Providing and fixing floor drain (FD) with 63mm
outlet and 100 mm inlet having 19mm seal for
indirect floor drain (FD).
110 x63mm outlet Each
3.05 Cutting holes up to 15x15 cm in R.C.C. floors and
roofs for passing drain pipe etc. and repairing the
hole after insertion of drain pipe etc. with cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded 105.00 452.00
stone aggregate 20 mm nominal size), including
finishing complete so as to make it leak proof.
3.06 Providing, fixing, testing and commissioning of pipe
inlet fittings by fixing Tee 110 x50/110 x75 mm (as
required) fixed on 'P' traps for connecting fixture
drains/ extension pices in uPVC including fixing and 62.00 886.00
sealing inlet joint with drip seal / Pipe seal joint as
required complete.
3.07 Providing and fixing 1 mm thick stainless steel grating
with frame for floor traps or drains of required
pattern including cutting and making good the floors -
125mm dia. Each
3.08 Providing and fixing clean out pipe (door piece) for
cleaning as required complete complete with all
fitting, clamps, accessories and civil works.
110mm dia. Each
TOTAL FOR DRAINAGE Sub Total B3
C ELECTRICAL WORKS
1 Point wiring for Light / Bell with 2-1.5 sq.mm &
earth wire of 1.5 sq.mm (Green) both are of ISI
marked 1.1 KV grade FRLS PVC insulated multi strand
copper wires up to 10 mtr length , in below type of
pipe erected with 6A Modular type switch / bell push
& accessories and earth continuity of following type,
erected on PVC / Metallic/Wooden box, single
mounting base frame covered with
textured/metallic/white front plate modules erected
on / in wall / ceiling as per pipe erected, with
necessary Lamp holder/ceiling rose / H.D.Connector
(b) with 16 swg HGS metal conduit pipe and
accessories painted black erected flushed on
wall/ceiling complete
2 Point wiring for Individual Plug with & earth wire of
1.5 sq.mm (Green) both are of ISI marked 1.1 KV
grade FRLS PVC insulated multi strand copper wires
up to 10 mtr length, in below type of pipe erected
complete with Modular type switch & 5 pin Plug
erected on PVC / Metallic/Wooden box covered with
appropriate front plate modules erected on / in wall
/ ceiling as per pipe erected with following type of
(I) [I] For 6A Plug and 6 a switch with 2-1.5 sq.mm Cu.
Wire from nearby switchboard/mcb db board -
(b) with 16 swg HGS metal conduit pipe and
accessories painted black erected flushed on
wall/ceiling complete
(II) [II] For 16A Plug and 16 amp switch with 2-2.5 sq.mm
Cu. Wire from mcb db board. -
(b) with 16 swg HGS metal conduit pipe and
accessories painted black erected flushed on
wall/ceiling complete
3 Providing and erecting Mains with 1.1 KV grade FRLS
PVC insulated ISI marked stranded Copper conductor
wire in following type of pipe to be erected
concealed in /flushed on wall/ceiling, with 1.5 sq. mm -
copper conductor FRLS PVC insulated stranded wire
of green colour for earth continuity of following size
(B) (B) With 16 swg HGS metal conduit pipe and
accessories painted black. -
(a) 2 wire 1.5 sq. mm Mtr.
(b) 2 wire 2.5 sq. mm Mtr.
4 providing and erecting Mains with 1.1 KV grade FRLS
PVC insulated ISI marked stranded Copper conductor
wire in following type of pipe to be erected in / on
wall / ceiling with 2.5 sq. mm copper conductor FRLS -
PVC insulated stranded wire of green colour for earth
continuity of following size
(B) (B) with 16 swg HGS metal conduit pipe and
accessories painted black. -
(d) 3 wire 4 sq. mm Mtr.
(g) 4 wire 4 sq. mm Mtr.
05- Supplying and erecting LED indoor fittings with LEDs
Jan of wattage 0.2 Watt to 0.5 Watt assembled on single
MCPCB, with housing used as a heat sink shall be
made of thick sheet Steel conforming to IS:
513/CRCA/aluminium pressure die cast powder
coated and high U.V. & corrosion resistance with
diffuser housed in aluminium casted body with
company mark/name
160V to 270V,Power Factor more than 0.95, THD <
CCT 3000 K to 6500K,
Luminaire efficacy> 85 lumens/watt
LED driver efficiency > 85 %
( fitting required LM-79 & LM-80 Certificates)(NOTE:
Below description have shown ranges of Wattage
capacity of LED fittings.The Engineer incharge may
select any wattage capacity between the ranges
(A) Square/ Circular shaped Surface/Recessed Mount
Downlight with provision for spring loaded mounting
clips complete.IP20
(ii) 11-15 watts, Surge-2 KV
(D) LED Strip Light
(i) Minimum 4.8W-120 LED per meter (2 wire, IP-65)
with non integral suitable Driver complete -
(F) Spot Light 425 Lumens, Surge-2KV
(ii) 8 to 11 Watts
Supply, installation,testing and commissioning of
EXIT light Prolite make self contained 6W luminaire
double sided /Single side complete with flush
mounting frame ,sign label,fluorescent tube and 24.00 3,400.00
battery and with label EXIT/RIGHT/LEFT/UP/DOWN
Supply and installation Motion Sensors for Lighting
Circuit 39.00 3,400.00
6 providing and erecting Miniature circuit breaker
single pole 6A to 25A suitable to operate on 240 V
A.C. system and having breaking capacity 10 KA to be
erected in existing box. confirming to IS 8828/1996
7 Providing & erecting 240 V MCB double pole switch
for motor & inductive load (C Curve) having 10 KA
breaking capacity & confirms to IS : 8828 in existing -
box having following capacity
(A) 6 to 32 Amp.
8 Providing & erecting 415 V MCB Four Pole for Motor
& Inductive Load (C Curve) having 10KA breaking
capacity & confirms to IS :8828 in existing box having -
following capacity
(a) 6 to 32 Amp.
9 Providing and erecting Sheet Steel powder coated
MCB distribution board - flush / surface mounted
fitted with busbar, neutral link, earth bar and DIN rail,
Conforms to IS 8623-1 & 3, IEC 61439-1 & 3 without
MCB to house appropriate nos. of MCBs.(The DBs
should be used of same company of MCB to be used)
(A) single phase incoming and horizontal single phase
(b) sheet steel double door (IP-43)
(B) three phase incoming and single phase horizontal
type outgoing Per phase isolation type (PPI) -
(b) sheet steel double door
10 Providing & erecting approved make thermo plastic
MCB/RCCB distribution board having modular
Double door with DIN rails, epoxy powder coated
finish metal frame & door assembly with Acrylic/
Plastic door, spring & hinged pins complete with
required PVC sleeved 32 / 63A copper Bus strips
without MCB / RCCBs
(a) One Row 8 Module Ea.
11- Providing and erecting Sheet Steel powder coated
01- Vertical MCB distribution board (VTPN) - flush /
1900 surface mounted double door (IP54) fitted with
copper insulated busbar, isolated neutral bar, earth
bar and DIN rail, Conforms to IS 8623-1 & 3, IEC
61439-1 & 3, suitable for 63/100 AMP TPN MCCB +
RCCB as incomer and three phase outgoing as per
following .(The DBs should be used of same company
of MCB to be used)
(D)12 way outgoing Ea.
12 Providing and erecting Approved make Four pole
moulded case circuit breaker having breaking
capacity ICU of 25 KA. at 415 V,having normal current
rating up to 25 A to 100A. with Fixed thermal &
magnetic release suitable to work on A.C. supply 50 -
c/s. with all internal connections, spreader tinned
copper & complete erected in existing 16 G.M.S.
13 providing and erecting Approved make RCCBs
conforming to IS: 12640 and having sensitivity of
mA and Short Circuit withstand capacity of 10 KA and
suitable for operation on single phase 240 V,50Hz.
having characteristic of quick action & tripping with -
all advance feature & do not incorporate any
electronic component. for following Max. rating
erected as directed
(ii) 40Amps. DP
14 Providing and erecting XLPE(IS:7098)(I)-88 ISI
armoured cable multistrand Copper conductor for
1.1 KV. to be laid on wall with necessary clamps or in
existing trench / pipe at road crossing or floor of
following size of cable.
(C) 3 core 6 Sq. mm Mtr.
15 Providing and erecting XLPE(IS:7098)(I)-88 ISI
armoured cable multistrand Copper conductor for
1.1 KV. to be laid on wall with necessary clamps or in
existing trench / pipe at road crossing or floor of
following size of cables.
(A) 4 core 10 Sq. mm Mtr.
(B) 4 core 16 Sq. mm Mtr.
16 Providing and, fixing heavy duty flange type brass
cable gland with rubber ring for PVC insulated
armoured cable complete with out going tails, -
insulating tape etc for following size of cables.
(A) 2 to 4 core 2.5 / 4 Sq. mm Ea.
(B) 2 to 4 core 6 Sq. mm Ea.
(C) 2 to 4 core 10 Sq. mm Ea.
(D) 2 to 4 core 16 Sq. mm Ea.
(E) 2 to 4 core 25 Sq. mm Ea.
17 Solder less crimping type Copper lugs conforming to
IS suitable for cable of following size evenly crimped
with high pressure tool & connected to switchgear
terminals with brass/cadmium plated nut bolts in an
approved manner.
18 Providing and erecting Epoxy Outdoor / Indoor end
termination Kit suitable for LT PVC insulated
armoured cable1.1 KV grade complete with ferrule
bushing and accessories and suitable clamps duly -
erected and connected to the supply for all cores
cables of following size.
19 Providing and fixing approved make Perforated C
type cable tray. Made from pre- galvanized sheet
steel. The cable tray should be bended as per IS
2062/1079 . with max 17.5% perforation with
coupler plate / Fish plate and GI hardware like nut - -
bolt and washers etc. erected on existing support as
per Specification and as per instruction of engineer in
(1) 50 X 50 X 1.5 mm Thick Rmt
20 Providing and fixing approved make 'T' Junction for
Perforated C type cable tray. Made from pre
galvanized sheet steel. The Junction should be
bended as per IS 2062/1079. with max 17.5%
perforation with coupler plate / Fish plate and GI -
hardware like nut - bolt and washers etc. erected on
existing support as per Specification and as per
instruction of engineer in charge..
(1) 50 X 50 X 1.6 mm Thick ' T' Junction Ea.
21 Providing and fixing approved make '90° Elbow' for
Perforated C type cable tray. Made from pre
galvanized sheet steel. The Junction should be
bended as per IS 2062/1079. with coupler plate /
Fish plate and GI hardware like nut - bolt and washers
etc. erected on existing support as per Specification
and as per instruction of engineer in charge..
(1) 50 X 50 X 1.6 mm Thick 90° Elbow Ea.
Supplying & erecting recess wall mounting speaker
with 5W rated input power 3.3 K. Ohms / 3W
impedance, 100 - 10000 Hz frequency response with
6 inch dia. cone type 8 ohms speakers duly fitted in -
ABS plastic cabinet of colour match with wall or
ceiling of following size. [[Approved by Competent
Authority i.e. not Below the rank of Executive
(a)Round Shaped, 230mm dia. Speaker Ea.
23 Supplying and erecting Flexible PVC insulated multi
strand multi core 1.1 kv grade ISI marked copper
wires of following size to be erected as directed.
(b) 1.00 Sq.mm twin twisted Mtr.
Note -1. Integration and modification if required in
softwar programme for installation of new detectors
and device with Main Fire alarm panel.
2. Vendor shall be responsible for the properly -
functional of existing Main Fire Alarm panels,
detectors, hooter, MCP and devices after installation
of detectors & devices in proposed expansion area.
Make;-As per Existing (Notifier, Tyco, Honeywell)
Supply, Installation, testing & Commissioning of
Intelligent Addressable multi sensor detectors UL
Listed. It shall have a humidity rating of 10% to 93%
RH, non-condensing with required standard 24.00 3,500.00
mounting bases. with standard base etc.complete as
required. Make - As per Existing
Supply & Installation of sounders with strobe lights
26 UL Listed and with suitable rating of power supply. Nos.
Make - As per Existing
Supply & Installation of Manual call points Ul Listed.
Make - As per Existing 8.00 4,000.00
2 core x 1.5 sq.mm Armoured, Red Colored Fire
Survival Cable with junction box with flame proof
gland for loop in loop out complete with saddling at
every 500mm interval for SLC loop, power cable with 375.00 310.00
required fixing accessories. (For detectors, MCPs,
modules and jacks)
1 Ductable Split unit
Supply, installation, testing and commissioning of
CONCEALED Duct type units with Scroll compressor
with green Regrigerant R-410A/R-32/R-22. The unit
should be complete with indoor & outdoor unit,
condensing unit, controls, control panel, tubular type
refrigerant, canvas connection remote control and
drain piping. The refrigerant piping, control wiring
should be based on the indoor unit and outdoor unit
distance being 3 mtrs/Ckt along with 13 mm thk nitrile
rubber insulation. The insulated drain piping should
be of 32 mm dia. and distance 3 mtrs/unit. Indoor unit
should be provided with thermostats and remote
control. The installation should be complete with all
the required accessories like the supports, clamps
required to make the installation complete. The cost
should also include Chasing in walls as well as all the
supports needed to install the units at the higher level.
The quoted price shall include the GI frame structure
to mount the outdoor unit or to suit the site condition.
1.1 3 TR ( 1200 cfm) HSP split air conditioning units as
described above 1.00 1,05,000.00
1.2 2.0 TR ( 800 cfm) HSP split air conditioning units as
described above 3.00 75,000.00
1.3 1.5 TR ( 600 cfm) HSP split air conditioning units as
described above 3.00 68,000.00
2 Supplying, installing, testing and commissioning of IN
LINE FANS suitable for installing in any position in
vertical or horizontal ducts. The casing shall be double
skin, internally acoustically lined and constructed of
galvanised steel. The fan shall be DIDW with forward
curve impeller fitted with maintenance free external
rotor motor. The motor shall be suitable for 220±10%
volt single phase 50 cycles AC supply. Quoted price
shall be inclusive of electronic speed regulator and
wiring between fan & speed regulator for single phase
fans. Incase of 3 phase fans quated price shall be
inclusive of DOL starter panel with cabling between
starter panel and fan. The incoming power supply to
speed regulator / starter panel shall be provided by
electrical contractor.
B PIPING-COPPER AND DRAIN
Providing & fixing of inter connecting copper piping
between indoor & outdoor units as per manufacturer
specifications duly insulated with closed cell nitrile
foam tabular insulation of 13mm thickness. All piping
inside the room shall be properly supported with
hanger in M.S. painted cable tray and exposed piping
shall be properly supported in G.I. cable tray with top
6.4 mm OD soft copper (Insulation 13 mm)
9.5 mm OD soft copper (Insulation 13 mm)
12.7 mm OD soft copper (Insulation 13 mm)
15.9 mm OD soft copper (Insulation 13 mm)
2 Supplying, installing and testing of UPVC pipe ( heavy
duty) with 6 mm thick nitrile rubber insulation with
protective coating on condensing water piping and
fitting like bends, elbow, tee and union, etc. as per the
approved shop drawings and specifications.
C AIR DISTRIBUTION
(FOR FACTORY FABRICATED DUCTS AS PER
“SMACNA” STANDARDS & SPECIFICTIONS)
1 Supply, Fabrication, installation and testing of factory
fabricated sheet metal ducts with sleeve joints and
supports complete with the approved shop drawings
and as required by the specifications and hanging of
the ducts to be done by thread wire on metal cushion
with gripple support.
2 Supplying and erecting GI sheet of fabricated at site
and mentioned guage to be used for fabrication of
ducting complete with neoprene rubber garkets,
elbows, splitter dampers, vanes, hangers, supports
etc. as per approved drawings and specifications of
following sheet thickness complete as required:
Supply, installation, testing and balancing of powder
coated Extruded Aluminium Supply air Grilles with
3 volume control dampers in accordance with the SQMT
approved shop drawings and specifications.
(Minimum Chargable area would be 0.1 Sqm Per Pc)
Supplying & fixing of opposed blade volume control
dampers in supply air duct collars as per
approved drawings and specifications. Volume
control damper shall be provided at the junction of
4 each branch duct with main duct. Dampers shall be 2 SQMT
gauge heavier than the gauge of large duct but
should not be less than 20 gauge, and shall be
rigid in construction so as not to flutter with the
passage of air.
Supply, fabrication, installation and testing the
flexible connections constructed of fire resistance
flexible double canvas sleeve as per the approved 20.00 2,500.00
Supply, installation, testing and balancing of Powder
coated/Anodised extruded aluminium construction.
6 inlet air louvers with bird screen and volume damper SQMT
for fresh air as per specifications and approved shop
Supply, installation, testing and balancing of powder
coated Extruded Aluminium Return air Grilles
7 without volume control dampers in accordance with SQMT
the approved shop drawings and specifications.
(Minimum Chargable area would be 0.1 Sqm Per Pc)
Supply, installation, testing and balancing of powder
coated Extruded Aluminium Exhaust air Grilles
8 without volume control dampers in accordance with SQMT
the approved shop drawings and specifications.
(Minimum Chargable area would be 0.1 Sqm Per Pc)
D THERMAL INSULATION
1 Supply, installation and testing of Acoustic lining with
Open cell nitrile rubber with in supply and return air
ducts of specified thickness as per the specifications.
All ducts shown cross hatched on the approved shop
drawings shall be provided with acoustic lining as
perthe specifications:
2 Supplying and fixing of following thickness duly
laminated aluminum foil of mat finish closed cell Nitrile
rubber(Class“O”) insulation on existing duct after
applying suitable adhesive for Nitrile rubber. The
joints shall be sealed with 50mm wide and 3mm thick
self adhesive nitrile rubber tape insulation complete
as per specifications and as required.
E ELECTRICAL INSTALLATION
Supply, laying, testing and commissioning of PVC
sheathed stranded FRLS wires in MS conduits
recessed / surface including cutting, chesing the wall
surface and making for the same, sizes as given
below of copper conductor including terminations
complete as required.
a) 2C x 1.5 mm2 (control wiring for IDU to ODU)
Grand Total (A+B+C+D)
Grand Total (A+B+C+D)
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
04 Building Specification Booklet.pdf
MMCEC DRAWINGS_compressed (1).pdf
Technical Specification.pdf
B1 TENDER SBD R1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .