Loading…
Loading…
Updated dates
Tender Value
₹3.6 L
EMD Value
₹3,629
Closing Date
30 Jun 2026, 3:15 pm3d left
Similar tender results from the same govt authority in the past 3 years.
GUNTUR MUNICIPAL CORPORATION
GUNTUR
REPAIRS TO EXISTING TOILETS AT SRINIVASARAO THOTA HINDU BURIAL GROUND OPPOSITE AND KVP COLONY VEHICLE SHED IN DIVISION NO 21 IN GUNTUR MUNICIPAL CORPORATION
943502
ET No.18/2026-27,Item No.04
OPEN - NCB
Civil Works
GUNTUR
1 document required · 1 mandatory
₹129
₹3,629
6 Jun 2026
6 Jun 2026
30 Jun 2026
30 Jun 2026
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum
Construction of granular sub-base (GSB) by providing Well graded material for Grading III mixing in a Mechanical Mix Plant at OMC carriage mixed material to work site spreading in uniform layers with motor grader on prepared surface and compacting with 80-100 kN Vibratory Roller to achieve the desired density, complete as per Technical Specification of MORTH.
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43/53 grade at cement as per Clause 1501.2.2 (M30 Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS:383, maximum in a concrete mixer of not less than 0.28 cum capacity and appropriate weighbatcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, near approaches to bridge/culvert and construction joints, and curing of concrete slabs for 14 days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
Flooring with ceramic tiles, set over base coat of CM (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kg/sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all Material like cement, sand water and tiles etc., complete for finished item of work (BLD-CSTN-7-6) - 10 Sq.M. FOR walls
S/F of Sal wood frames and gink sheet including cost and conveyance of all materials and labour charges etc., complete (0.75 x 2.10). Door
Carting away the surplus excavated earth from the work site with a lead of 1 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum. EARTH WORK 100%
Supply, delivery of the required items for sanitary arrangements to existing toilets
Hand wash liquid
Naphthalene balls
Cheerelu (broom stick) - 4 Nos
Brushes - 4 Nos
Submerged Motor Wire
Provision for Seignorage charges
Provision Towards merit 2%
Provision Towards DMF 30%
Provision for NAC @ 0.10%
Provision for GST @ 18%
Provision for TPQA @ 0.739 %
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document 1.doc
TENDER_DOCUMENT • 0.19 MB
436555.xlsx
TENDER_DOCUMENT • 0.02 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
Notice Inviting Tender .docx
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid