Loading…
Loading…
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Jun 2026, 6:00 pm
Executive Engineer
Labour work for providing 1PH/3PH New Service Connection, meter & service replacement, meter rectification work Under ALL scheme at Dhasa S/dn under Gadhada Division.
310484
GDN/Tech-3/Store/1042-05 DT 28.04.2026
Open
Electrical
Botad
15 documents required · 13 mandatory · 2 optional
₹590
PGVCL GADHADA
₹5,000
3 Jun 2026
3 Jun 2026
3 Jun 2026
23 Jun 2026
3 Jun 2026
2 Estimated cost in Rs. 500000/-
3 Tender Fee in Rs. ( non-refundable)
4 Payment of tender fees at GADHADA Division online RTGS/NEFT
Only from Dt.03/06/2026@ 11:00 Hrs. to DT.23/06/2026@ 16:00Hrs. - NA
Online tender will be issued from this office only, during the time limit
mention here, after payment of Tender fees.
Earnest Money Deposit amount in Rs.
5 (Payment through online
(1 % of Tender Amount)
RTGS/NEFT Only)
6 On line ( e-tendering ) tender / offer 03/06/2026 TO 23/06/2026
submission last Date 23/06/2026up to 18:00 hours only up to 18:00 hrs.
(This is mandatory )
7 Date & Time for pre bid meeting ( If Required) -NA -
8 Date of opening of Technical Bid at Date 24/06/2026 @ 11:10 hours 24/06/2026 on 11.10 hrs. if
(if possible) Possible
09 Date of on line opening of Price bid, Date 25/06/2026 @ 11:00 hours 25/06/2026 On 11:00 hrs. if
(if possible) Possible
10 Validity of Bid 90 Day
PG. 2 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Superintending /Executive Engineer
Name of Circle/Division__Gadhada__
GENERAL INFORMATIOS FOR BIDDERS
1.1 The "PGVCL" shall mean the Superintending/Executive Engineer __Gadhada__
Circle/Division, PASCHIM GUJARAT VIJ COMPANY LTD., having its corporate office at
Nanamava Main Road, Laxminagar, and Rajkot. With expression shall unless repugnant to
the context include its permitted assigns or successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been
accepted by the PGVCL for award of the contract and shall include his authorized
representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as Engineer-
in-Charge to supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with Performa,
schedules and drawings.
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the bidder that his
tender has been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL with the
contractor and shall include the commercial technical and general conditions, schedules,
drawings and any other conditions specifically agreed between the parties forming a part of
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per
order placed by the PGVCL and calculated from the quantities indicated in the tender.
1.9 The "Completion Period" shall mean the period starting from the date of issue of "Order" and
required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time to inspect the
works under the contract and/or duly authorized representative of the PGVCL “Letter of
Award” shall mean the official notice issued by the PGVCL notifying the contractor that his
bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been issued.
1.13 “Month” shall mean the calendar month day or days unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension
1.16 Electricity Rules: - All the works shall be carried out in accordance with latest rules under
Electricity Act-
1.17 Testing: - After completion of work execution required Tests are to be taken in presence of
Engineer in Charge whenever required.
PG. 3 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
2. PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.1.1 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and having
experience of erection & maintenance of overhead HT/LT lines, Transformers,
underground cable work, along with satisfactory work completion certificate regarding
execution of work, including work order outward number along with its value, from order
issuing authority, for last 3 (three Years) _ ending last day of month previous to the one
in which tenders are invited., of any DISCOM of GUVNL or any Govt. / Private DISCOM
of any state of India. The work executed through open / advertised tender shall only be
considered for experience of work. The work done through limited tender shall not
be considered for experience.
These bidders will be considered as an experience bidder.
2.1.2 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. And not
possessing any experience of erection & maintenance of overhead HT/LT lines,
Transformers, underground cable work can also participate in tender for erection &
maintenance of overhead HT/LT lines, Transformers, underground cable work.
These bidders will be considered as an NEW bidder.
2.2 Following documents are mandatory for the Bidders.
Work Completion certificate (by Order Issuing Authority only) with copies of Work
Orders for the similar works executed.
Memorandum of Association or partnership deed.
Document showing P.F. Number obtained by the bidder.
Power of attorney if any for signing the bid documents.
Latest solvency certificate issued by Nationalized or scheduled bank for a sum of
Minimum 20% of Tender cost
PF code number allotted by concern PF authority
E. P. F. Registration in the name of bidder.
GST Registration Certificate in the name of bidder
PAN card in the name of bidder
Latest bank solvency certificate from any Nationalized/Scheduled bank
Adhar Card (Optional) (In case of Bidding is done on Individual name)
Electrical Contractor license with valid period
PG. 4 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
3.0 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS.
3.1 Bidders willing to participate in tender will have to get themselves registered on website
www.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate / Digital Signature as
per Information technology Act 2000 using which they can sign their electronic bids. Bidders
can also procure the same from (n) code solutions, a division of GNFC Ltd., who are licensed
certifying authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown in
The tender document.
3.3 For details regarding digital certificate and related training the below mentioned address may be
(n) Code Solution a division of GNFC, 403, GNFC Info Tower, Bodakdev, and Ahmedabad
Toll Free No: 1-800-233-1010 Mob. 9327084190; 9898589652, E-mail: [email protected]
3.4 Bidders who already possess valid Digital certificate need not procure a new digital certificate.
3.5 Bidders can prepare and edit their offers number of times before tender submission date and
time as mentioned in this tender details table no1. After tender submission date and time,
bidder cannot edit their offer submitted in any case. No written or online request in this regard
shall be granted.
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic format on
website www.nprocure.com before the validity period mentioned in tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Offers only in physical form will not be accepted in any case
4. UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND SPECIFICATIONS.
4.1 All interested parties are requested to understand this Tender Document in detail in
order to comply with PGVCL’s requirements including but not limited to the Tender
fees, EMD and deadlines, selection criteria, selection methodology, scope of work, and
minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and documents and fully
inform himself as to all the conditions and matters which may in any way affect the
Work or the cost thereof. If any Bidder finds discrepancies or omissions in the
specifications and documents or is in doubt as to the true meaning of any part, he shall
at once request in writing in advance before filling in the tender, within the time limit as
per Table no 1, for an interpretation / clarification by the PGVCL Gadhada Circle /
Division office.
Then The PGVCL_Gadhada_ Circle / Division office will issue interpretation and
clarifications as he may think fit of such interpretations and clarifications, the Bidder
may submit his bid but within the time and date as specified in the Table no1. All such
interpretations and clarifications shall form a part of the specifications and documents,
and accompany the bidder's proposal. In case of difference of opinion about
interpretation of specification etc. the decision of Superintending/Executive Engineer,
_Gadhada_ Circle/Division will be final and shall be binding to the contractor.
PG. 5 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
4.3 Verbal clarifications and information given by the PGVCL or his employee(s) or his
representative(s) shall not in any way be binding on the PGVCL.
4.4 All interested parties requested to strictly abide by all terms prescribed in this RFP
Document and provide accurate information to the best of their knowledge without
misleading PGVCL to be considered for participation in this Project.
4.5 Bidders should be in touch with websites https://.nprocure.com &www.pgvcl.com
for information regarding revision / corrigendum / Amendment in the Tender
Document till due date of online submission and thereafter. No separate information
shall be sent in this regards and also not publish in newspaper.
5. TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules in force
during this Tender Period.
5.1 Payment of tender fee and EMD can be accepted through online RTGS/NEFT “The details of
bank account is SBI, Account No: 31089523121, IFSC code: SBIN0060019 Account Holder
Name: Paschim Gujarat Vij Company Limited, Branch Name: Gadhada
Tender Fees in Present rate of
Sr.No Tender Amount
5.2 The tender fees once paid for tender document will not be refunded under any circumstances or
not transferred to other bidder.
5.3 The Tender Fees is Non-refundable under Normal Circumstances. However, if purchaser
Company decides to scrap/cancel the Tender, by one or another reason, in which Bidders are not
responsible for cancellation/scarp of Tender fee without GST amount may be refunded to
bidder(s), at sole discretion of the Purchaser Company
6. EARNEST MONEY DEPOSIT (EMD)
6.1 The EMD payable, between the dates mentioned in Table no 1, by online RTGS/NEFT Only
in favour of the Paschim Gujarat Vij Company Limited payable at Gadhada on any
Nationalized /Scheduled banks or by Bank guarantee from any Nationalized/Scheduled
nationalized bank decided by Government of Gujarat time to time only. The EMD Amount is
1 % of the Tender Estimated Cost.
PG. 6 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
6.2 The EMD of all unsuccessful bidders except that of the successful bidder will
Be returned after the award of the contract.
6.3 EMD of the successful bidder to whom a contract is awarded will be returned
After the said bidder pays the security deposit and signs the contract agreement.
6.4 If the successful bidder fails to submit a Security Deposit within 15 days from the date of
LOA of the contract or fails to sign the contract agreement then the EMD amount will be
forfeited in favour of PGVCL without any notice or and action for “Stop deal” will be initiated
as decided by tender inviting authority.
6.5 No interest will be payable by the PGVCL on the above Deposit.
6.6 EMD can be exempted as per Industries & Mines Department, GoG New Purchase
Policy Resolution No. SPO/1095/2636(97)/CH dated 23.09.1997 for Small and Micro Scale
6.7 In cases, where EMD need not to be paid, valid exemption Certificates duly notarized has to
be produced/attached in place of EMD documents as per the Tender Terms and Conditions.
6.8 The Micro and Small Scale Industrial (manufacturing) Units registered under Small Scale
Industries of Gujarat State and holding subsequent registration with NSIC/DGS&D,
Registration Certificates for the item under Tender will be eligible for exemption from
payment of EMD on submission of attested copies of their SSI (SSI/ MSME Part-II) &
NSIC/DGS&D Registration Certificates and Udhyog Adhar Certificate/Memorandum in EMD
Cover. The Certificates should indicate the manufacture/service/works of items/work offered.
This benefit of exemption will not be admissible if they take part in the tender indirectly either
through their dealers, agents, distributors or other intermediates.
6.9 Tenders submitted without Earnest Money Deposit by the firms, who are not
Eligible for any exemption, will be rejected without entering in to further
Correspondence in this regard and no reference will also be made.
7 In case of online Tenders
6.1 Technical & Commercial Bid cover:
7.11 Following documents are mandatory and to be in submitted through Online.
1. Attested Copy of successful work Completion certificate, as mentioned on page no
point no 2.11 of this document.
2. Attested copy of Memorandum of Association or partnership deed.
3. Attested copy of document showing P.F. Number obtained by the
4. Attested copy of power of attorney if any for signing the bid documents.
5. Attested copy of latest solvency certificate issued by Nationalized or scheduled bank.
6. Copy of PF Code Number allotted by concerned PF Authority
7. All Annexures of this tender documents , duly signed by the bidder, in chronological
8. Certificate – A
9. Copy of Tender Document duly signed and stamped on each page.
PG. 7 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
10. The contractor shall have a separate provident fund code of RPFC and the
Contractor who do not possess separate P.F. Code shall not be considered for acceptance of
11. Contractor has to submit such certificate showing separate P.F. Code along with
12. List of available safety gadgets, as per annexure XI, with the bidder.
13. Attested Copy of Electrical Contractor license with valid period
14. Copy of documents mentioned in section 1, clause No. 2.2 of this tender.
6.2 Commercial / Price Bid:
7.2.1The bidder must clearly quote their rates in Schedule – B of this tender, in percentage
above than, below than or equal to, the tender rate in figure as well as in words. The bidder
should specify whether the quoted rates are with or without prevailing taxes, if applicable, in
force at that time, The bidder must work out the total price of their tender offered
accordingly and the total amount should be clearly written in words & figure, in case of any
accordingly and the total amount should be clearly written in words & figure, in case of any
discrepancy whatever written in words shall prevail. Company shall at liberty to decide the
matter as it deem fit.
7.2.2 In case of non SOR rate, Item wise rate should be mentioned and item wise
Rate will be consider for the lowest party.
7.2.3 Further bidders, for “On line tenders”, are requested to submit price – bid on-line
only and not to submit the price bid in physical form. This is mandatory. If price bid is
submitted in physical form, same will not be opened and only on-line submitted price bid will
be considered for evaluation. In On Line price Bid, GST is to be mentioned in separate
PGVCL reserves the right to reject any OR all tenders without assigning any reasons
9. The works referred herein shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified for the bidding.
Hence bidders should ensure themselves of their credentials before submitting their offer.
11. Superintending/ Executive Engineer, PGVCL, _______________ Circle/Division reserves the
right to spread the order if required.
12. Does not anticipate change in the PGVCL ownership during the proposed period of work.
8. AMENDMENT TENDER
8.1 At any time prior to the deadline for submission of bids, as mentioned in Table1,PGVCL
may, for any reason, whether at its own initiative or in response to a clarification
requested by a respective bidder, modify the bidding documents by amendments.
PG. 8 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
8.2 The amendment will be notified, only on PGVCL Website & nprocure website in case
of on line tender, PGVCL will bear no responsibility or liability arising out of
noncompliance of the same in time or otherwise.
8.3 Such amendments, clarification etc. shall be binding on the bidders and will be given
due consideration by the bidders while they submit their bids and invariably enclose
such documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1Follow all the instructions narrated this tender document for submission and no
any further communication in the matter will be entertained.
The Bidders must ensure that all the Annexures are completely filled in their tenders
and the information called for is given in totality. A set of complete tender documents
is required to be submitted duly signed and stamped by authority competent to sign
on behalf of bidder on each page as a token of unconditional acceptance to the
conditions of various clauses of tender documents. The bidder's bid and the
documents attached there to shall be considered for forming part of the contract
14.2 For “On Line Tenders”
14.2.1 Tender Papers & Specifications may be down-loaded from Web site
https://pgvcl.nprocure.com (For view, download and on line submission) and
PGVCL web site www.pgvcl.com (For view & down load only).
Price bids to be submitted ON LINE only before time limit specified in “Tender
Details” Table no1 of this document.
15. REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions, schedules and
other details called for in this specification and keep himself fully informed about all
which may, in any way, affect the work, or cost thereof. The bidder should sign on
each page of tender documents , as mentioned in Section 1 point no. 2.15, filure to
furnish the required information or submission of tender not as per the specification will
be at the Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this tender.
15.3 If any bidders firm or/and partner or proprietary firm anywhere in companies (PGVCL,
UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under criminal
investigation for any kind of fraud for public and theft of material or/and with handlings
the material and any civil and/or criminal case pending at any stage than offer of such
bidder /firm will be out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set out in the
Table no1, shall be rejected.
PG. 9 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
15.5 Any deviation found in Data/Details/Documents between online offer (e-tendering) and
physically submitted documents of bidder, offer of the same shall be liable for rejection
at the discretion of PGVCL.
15.6 The Bidders shall specifically note that any over writing or corrections or manuscript in
the bid shall be ignored and will not be considered authentic unless same are signed
with Bidder's Stamp/Seal as mentioned in Section 1 point no.
15.7 Conditional bids shall not be accepted.
15.8 DELAYED AND LATE TENDERS:
No tender shall be accepted/opened, as mentioned in the Table no 1, in any case
which are received after due date and time of the receipt of tender irrespective of
delay due to postal services of any other reasons and company shall not assume any
responsibility for late receipt of tender. Any correspondence in the matter will not be
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be
accompanied by its translation in English. Failure to comply with this may disqualify a bid.
In the event of any discrepancy in meaning, the English language copy of all documents
17. SIGNATURE OF BIDDER
17.1 The bid must contain the name, residence, address and place of business of the
person or persons making the bid and must be signed and sealed by the bidder with
his usual signature. The name of all persons signing should also be typed or printed
below the signature.
17.2 Bids by corporation/ company must be signed with the legal name of the corporation/
company by the President, Managing Director or by the Secretary or other person or
persons authorized to bid on behalf of such corporation/ company in the matter.
17.3 A bid by a person who affixes to his signature the word 'President', 'Managing Director'
'Secretary', 'or other designation without disclosing his principal will be rejected.
17.4 Satisfactory evidence of authority of the person signing on behalf of the
Bidder shall be furnished with the bid.
17.5 The Bidder's name stated on the tender shall be exact legal name of the
17.6 Erasures or other changes in the bid documents shall be over the initials of the person
signing the bid.
17.7 The bidder should sign, as described above, on each page of tender documents & then
they have to submit this tender documents.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening of the
PG. 10 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted by each bidder
in his bid for the complete scope of works including all duties and Taxes ,.will be evaluated
by the PGVCL to ascertain the best and lowest evaluated bid in the interest of the PGVCL,
for the complete works covered under these specifications and documents.
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will prevail. If
there is discrepancy between the unit price and the total price which is obtained by
multiplying the unit price and quantity, or between sub-total and the total price, the unit or
sub-total price shall prevail, and the total price shall be corrected. In case of discrepancy
between sub-total price obtained by adding various prices in the schedule and the sub-total
price indicated for that particular schedule, the sub-total obtained by addition of various
arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the prices
arrived at from various schedules, identified for that purposes, in the bid proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will be rejected.
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful bidder by the
22.2 The contract will be awarded to the best qualified and responsive bidder offering the
lowest evaluated bid in conformity with requirements of these specifications and
documents and PGVCL shall be the sole judge in this regard and subject to the
provisions of these instructions to bidders and other terms and conditions detailed out
in these documents and specifications. A responsive bid is one which accepts all terms
and conditions of these specifications and documents without any modifications.
22.3 PGVCL Reserves the right to award separate contract to two or more parties in line with
the terms and conditions specified in the specification.
23. ADDITIONAL DOCUMENTS:
At the time of evaluation of tender PGVCL _______ Circle / Division office may ask bidder
to submit required documents other than mentioned in section I Point no 2.2, if required.
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this Tender
consist ________ Days. The commencement date of Order shall be Date of issue of the
PG. 11 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
1. Name of the Bidder
2 Postal Address
4 e-mail address & URL
Type of Company
Attach Proof of Company Registration
Proprietorship/ Partnership/ Private Limited/
5 along with a copy of the Partnership Deed/
Article of Association and Memorandum of
Name and designation of the
representative of the Bidder to whom all
reference shall be made to expedite
technical co-ordination.
7 Office Address
Stores Address where materials issued by
PGVCL will be stored
Store Documents to be submitted
10 Office Telephone/Fax no.
11 Office e-mail address
12 Permanent Account Number(PAN),
15 Labour License No.
Insurance Policy No. and for nos of labours
16 Nos of Labours Insured in this policy_______
in the name of bidder
17 Solvency Certificate No.
18 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge and belief. If any
information found to be concealed, suppressed or incorrect at later date, our tender shall be liable to
rejected and our company debarred from executing any business with PGVCL.
PG. 12 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful Bidders
indicating the quantity allocated to them and the security deposit amount to be deposited by
them with PGVCL. Short listed Bidders will be required to deposit the requisite security deposit
within 15 days from issuance of LOI / LOA.
2. Security Deposit:
2.1 Security deposit will be accepted in Cash if the amount is less than Rs.
and, if the amount is more than Rs. 10000.00 then will be payable by Demand Draft
(DD) from Nationalized / Scheduled Banks as per Govt. GR No. EMD / 10 / 2014 /
570 / DMO dated 01.04.15 will be acceptable. DD should be drawn on any
Nationalized /Scheduled banks in favour of Paschim Gujarat Vij Company Ltd.
payable at _Gadhada_ or by Bank guarantee from any Nationalized/Scheduled
nationalized bank decided by Government of Gujarat time to time only. Cheque will
not be acceptable
2.2 The successful Bidders will be required to deposit the requisite security deposit
within 15 days from the date of issuance of LOI / LOA of an amount equivalent to
5 % of the value of the work to be allotted to him and as mentioned in LOI / LOA.
2.3 In case, if the Bank Guarantee is furnished / submitted, it should have a
clear one time validity till the completion of awarded work of this work order.
Bank Guarantee for interim period will not be allowed. Security Deposit shall be suitably
extended time to time as per requirement.
2.4 If by any reasons the completion period of this work order is extended, then supplier
should undertake to renew the Bank Guarantee at least one month before the expiry of
the validity failing which PGVCL will be at liberty to encase the same. CORPORATE
GUARANTEES NOT ALLOWED.
2.5 No interest will be paid on the Security Deposit.
2.6 In the event of awarding the order of additional quantity, the successful Bidders will be
required to deposit additional Security Deposit on prorate basis within two weeks of the
issuance of LOA /LOI for the additional order quantity.
2.7 In the event of failure to carry out work offered by successful Bidders and as accepted by
them while receiving the order within given time period, will lead to forfeiture of the
Security Deposit up to 100% and will lead to disqualification of the bidder to transaction
business with PGVCL for at least TWO years or the time duration as may be decided by
the Managing Director, PGVCL.
2.8 Security deposit will be returned on after completion of awarded work.
PG. 13 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
2.9 If the successful Bidders fails to pay security deposit within given time limit then the letter of
intent will stand cancelled. EMD amount will be forfeited in favour of PGVCL without any
notice or and action for “Stop deal” will be initiated as decided by tender inviting authority.
3.0 SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt of
LOI/LOA, on Stamp Paper of Rs 300/-as per Company’s rules in the prescribed form of the
P.G.V.C.L. attached with this Tender. The cost Rs.300.00 of the Stamp Paper will have to be
borne by the successful Bidders.
4. For the Tendered work, other than turnkey work, entire material will be issued by PGVCL. Any
other related material required to carry out work mentioned in Schedule A is to be brought by
Bidder. No any extra cost will be paid towards such material.
5. Successful Bidder has to follow all the rules and Regulations of Work Safety. Required tools
and Tackles for Safety are to be arranged by Bidder only.
6. Bidder is responsible to any type theft/damages of Company’s material and also responsible
to any type damages to any property and any kind fatal/non-fatal accidents to anybody during
the execution of work. Insurance of all workers is compulsory, who are involved in Execution
of Tendered work. There will be no any financial liabilities of PGVCL for damage charges paid
such way. Copy of valid Labour Insurance Policy in the name of bidder is to be submitted with
Tender Documents.
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8. Work must be completed in in specified Schedule narrated in the Tender. If concerned
Engineer not satisfied with quality of work, no any Time limit extension will be granted and
Penalty with applicable GST and other taxes in force at that time will be levied on delayed
portion of work.
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA. Security
Deposit (In form of DD) and Insurance Policy is also to be submitted with Agreement within
this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a month after
completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 300/- Stamp Paper and cost of
stamp paper is to be borne by Bidder. Solvency Certificate is to be submitted as per PGVCL
rules and Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthig work, and work to
be done as per PGVCL rules and RE specification for this work.
14. Work is to be carried out in presence of PGVCL authorized representative and to be duly
certified also.
15. No idle labour charges will be paid by the PGVCL in case such occasion of idle labour arises,
due to want of any materials or any othersituations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
PG. 14 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
17. Bidder has to submit the Performance Certificates under whom the similar kind of
Tender work has been executed. Such Certificates must not older than 3 Years from
Date of submission of the Bid. Such Certificate must be duly signed by Cadre Executive
Engineers and above only.
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS:
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force in India,
including any such laws passed or made or coming into force during the period of the
2. Wages to be paid at the time of payment etc.by the contractor
2.1 The successful bidder shall pay minimum prevailing rates per day, as may be specified here
after, or rates fixed under the Minimum Wages Act, whichever is higher. The wages of every
contract labour employed by him under this contract shall be paid by him before the expiry of
7th day of the month irrespective of which the wages are payable i.e. wages of a last month
have to be paid by him in the first week of the next month). The contractor shall have to make
wages to his workers through bank only. The agency shall have to submit the copy of a letter
given to the Bank advising for crediting wages in individual account of the workmen along with
photocopy of the cheque showing total payment to be made to all such workmen whose
accounts are operated in that branch. (If there is more than one Branch, the agency will have
to submit separately for each branch.)
2.2 The successful bidder shall give his telephone number and address to the company so that
in case of labour trouble etc. the contractor can be contacted. The contractor shall arrange to
have his office outside the factory premises and the contractor shall keep himself present
through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5. Identity cards as prescribed under the factories Act/Shops and establishment Act (As the case
may be applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract labour
(regulation and abolition) Act for employing necessary manpower required by them. In
absence of such license, the contract shall be liable to be terminated without assigning any
reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and keep the
PGVCL indemnified in respect thereof. Some of the major liabilities under various labour and
industrial laws which the Contractor shall comply with below conditions.
7.1 Payment of contribution by way of employer's contribution towards provident fund,
administrative charges etc. at the rates made applicable from time to time by the
Government of India / Government of Gujarat or other statutory authority.
7.2 Payment of deposit in respect of each contract labour at the prevailing rate with the office of
the commissioner of labour as per the Contract Labour (Regulation and abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and abolition) Act rules
framed there under depending upon the number of workmen.
PG. 15 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
7.4 Paid leave facility and wages as per the provision of the Factories Act at the rate of one day
for every 20 days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as per industrial
Dispute Act. Any payment to the Contractor's employee arising out of any claim of disputes
under the Industrial Dispute Act 1947 or any other labour Laws.
7.6 Payment of compensation in case of accidental death or injury as per Employee's
compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed or
any government Contractor under any of the provisions of the Minimum wages act,
Payments of wages Act, Employee's compensation Act, Contract Labour regulation
abolition Act, Employee provident fund or any other law due to act of omission of the
Contractor, the PGVCL may make such payment and shall recover the same from the
successful bidder 's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such amount as may
be necessary to cause of observe, or for non-observance of the provisions stipulated in the
notifications/byelaws/Acts/Rules/Regulations/ including amendments. If any, on the part of
the Contractor, the PGVCL shall have the right to deduct any money due to the successful
bidder under this contract or any other contract with the PGVCL including his amount of
security deposit for adjusting the payment. The PGVCL shall also have right to recover from
the Contractor any sum required or estimated to be required for making good the loss or
damage suffered by the PGVCL.
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation fund and
under the liabilities insurance. The Contractor will arrange insurance policies for arranging
payment to his staff injured / met with accident (Fatal / nonfatal) on duty of sufficient amount as
per Labour laws. In case of any such happening Contractor will be liable for any other payment
to workers / staff engaged as per existing rules. Contractor will not make any such payment to
the Contractor's staff or any compensation etc. during the pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments engaged.
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and
conditions of service ) Act
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
PG. 16 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
The above are some of the major liabilities of the Contractor in addition to other
liabilities prescribed under the various labour laws, in force from time to time, from
statutory authorities like GOI-GOG, which the Contractor shall have to comply with.
10. It should be ensured that before commencing the said work, the successful bidder should
submit the details of their labourer such as a full name, address and age with proof and
subsequently changes of workers details are submitted accordingly.
11. The successful bidder shall employ adequate number of an experienced staff at site for daily
supervision and for maintenance of various register and records required under the law and
contract. No payment for supervision shall be admissible.
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act, Workmen’s
Compensation Act, Insurance Rules etc. or any other act, rules or regulations that have to be
observed by the contractor for carrying out the work.
13. The contract will be governed by the company as per works terms & conditions of the
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No female
worker shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
14.2 Contractor shall maintain a valid labour license under the Contract Labour (Regulation
and abolition) Act for employing necessary manpower required by him. In the absence of
such a license, the contract shall be liable to be terminated without assigning any reason
thereof. Contractor should also employ qualified and experiences persons as per
requirement of Electricity Act and rules for carrying out supply and erection work under this
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any Government
agency under any of the provisions of the Minimum Wages Act, Payment of Wages Act,
Employee Compensation Act, Contract Labour Regulation Abolition Act, Employee
Provident Fund or any other law due to act of omission of the Contractor, PGVCL may make
such payment and shall recover the same from the Contractor’s bills.
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of
each concerned employee The contractor's contribution and the workers’ contribution
towards Provident Fund and Family Pension Scheme shall be done at the rate made
applicable by the Government from time to time and deposited by the contractor with
Regional Provident Fund Commissioner, Rajkot.
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who are
members of the Provident Fund as the contribution to the Deposit Linked Insurance Scheme
with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Rajkot at the rates applicable.
PG. 17 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labour shall be provided by the Contractor to his, workers. He shall maintain Leave
Records, Leave Cards for individual labourer which shall be duly verified, approved and
certified by the Authorized Officer of PGVCL. Remuneration for such leave period shall be
fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the performance
of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates
fixed under the Minimum Wages Act. The wages of every Contract Labour employed by him
under this contract shall also be paid by him before the expiry of 7th day from the last day of
the month in respect of which the wages are payable (i.e. wages of a month have to be paid
by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the Contractor shall be
punishable to the extent of Rs. 100/- for each day of default.
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so that, in
case of labour trouble etc. the Contractor can be contacted. The Contractor shall arrange to
have his office within working area and the contractor keep himself present throughout the
20.4 The separate P.F. code issued from RPFC is required to be taken by the contractor and if it
is not taken, offer of the firm will not be considered. The attested documentary evidence to
be submitted along with the offer.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be ensured that
all the contract labourers are covered under the provident fund scheme and employees’
pension scheme and their contributions are remitted regularly to the concerned RPFC. The
photo copies of the Chelan in this regard should be collected from the concerned contractor
and kept in the file of the concern contractor.
21 CONTRACTOR TO INDEMNIFY THE COMPANY
The successful bidder shall indemnify the Company and every member officer and employees
of the Company, also engineer in charge and his staff against all actions, proceedings, claims
of demands, coasts and expenses, which may be made against the Company or Government
for or in respective of or performance of his obligation under the contract documents the
Company shall not liable for or in respective of or in consequence of any accident or inquiry to
any workman or other person in the employment of the contractor or his sub-contractor and
the contractor shall Indemnify and keep indemnified the Company against all such damage
and compensation and against all claims, demands, proceedings costs, charges and
expenses whatsoever in respective thereof in relation thereto.
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid price
shall include all the costs in fulfilling all the insurance liabilities under the Contract.
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may
be pertinent to the Works and obligatory in terms of law to protect his interest and interests
of the PGVCL against all perils detailed herein. The form and the limit of such insurance as
defined herein together with the under-writer in each case shall be acceptable to the
PGVCL. However, irrespective of such acceptance, the responsibility to maintain adequate
PG. 18 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
insurance coverage at all time during the period of Contract shall be of Contractor alone.
The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall
be in the name of the Contractor. The Contractor shall, however, be authorized to deal
directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely convertible
23. Any loss or damage to the equipment during handling, transportation, storage,
erection, putting in to satisfactory operation and all activities to be performed till the
successful completion of commissioning of the equipment shall be to the account of
the Contractor. The Contractor shall be responsible for preference of all claims and
make good the damages or loss by way of repairs and/or replacement of the
equipment, damaged or lost. The transfer of title shall not in any way relieve the
Contractor of the above responsibilities during the period of Contract. The
Contractor shall provide the PGVCL with copy of all insurance policies and
documents taken out by him in pursuance of the Contract. Such copies of
documents shall be submitted to the PGVCL immediately after such insurance
coverage. The Contractor shall also inform the PGVCL in writing at least sixty (60) days
in advance regarding the expiry/cancellation and/or change in any of such documents and
ensure revalidation, renewal etc., as may be necessary well in time.
24. The perils required to be covered under the insurance shall include, but not be limited to fire
and allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss
or damage in transit, theft, pilferage, earth quake, riot and strikes and malicious damages,
civil commotion, weather conditions, accidents of all kinds, etc. The scope of such
insurance shall be adequate to cover the replacement/reinstatement cost of the equipment
for all risks up to and including delivery of goods and other costs till the equipment is
delivered at Site. The insurance policies to be taken should be on replacement value basis
and/or incorporating escalation clause. Notwithstanding the extent of insurance cover and
the amount of claim available from the underwriters, the Contractor shall be liable to make
good the full replacement/rectification value of all equipment/materials and to ensure their
availability as per project requirements.
25. All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the PGVCL may from
time to time, during the pendency of the Contract, ask the Contractor in writing to limit the
insurance coverage, risks and in such a case, the parties to the Contract will agree for a
mutual settlement, for reduction in Contract price to the extent of reduced premium amount.
The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium which may be available for higher volume or for reason of financing arrangement
of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements for the portion
of the works to be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except in special case, if
28. The successful bidder has to engage required strength of skilled persons for execution of work
and proper supervisor to avoid complication and unnecessary delay to complete work timely.
PG. 19 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
The successful bidder will be solely responsible for labour claims arising out of the labour
employed for this job.
29. The successful bidder should furnish details of past experience of such job of similar nature
completed by him satisfactorily within the time limit in PGVCL will be preferable.
30. The successful bidder will be abide by and fulfil all the terms and provisions of the “Tender
and contract” for works as applicable and in case of any default there to the PGVCL
Company shall forfeit the S.D. or any other action as may be decided by
Superintending/Executive Engineer __Gadhada__ Circle/Division.
31. The successful bidder will certify that he has complied with the provisions of
Industrial & Labour Laws including PF Act, ESI Act etc. as may be applicable. Copy
of challans of PF related to be submitted along with bill.
32. The successful bidder will governed by the PGVCL general conditions of works contract.
The Booklet will be available in the concerned office in any working days. In the event of
placing order, the successful bidder will be bound to the terms & conditions of the booklet.
All the usual terms and conditions of the Company though the same might have not been
mentioned in this specification or contractor booklet will applicable to this contract, and the
decision of the Executive Engineer, _Gadhada__ Division shall be binding on the
PG. 20 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services. The amount and % of GST and Cess as applicable should
clearly be indicated separately. (GST/Cess means all applicable Tax/Cess under GST
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act,
CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
3. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of
GST and Cess is not mentioned clearly unless the bidder has opted for Composition
Scheme under GST Act, which should be clearly indicated in the price bid. COMPANY
may at its discretion consider such offer with presumption of highest applicable rate of
VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
4. If the Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will have
to be borne by the tenderer. In no case additional amount towards tax or otherwise will be
paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be
applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
5. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in acceptance
of tender only and any deviation in the same shall not be accepted. Further, any additional
liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account
of GST charged from the company; such refund shall have to be passed on to the
company, along with interest if any. Such refund along with interest needs to be passed on
suo-moto by the contractor.
6. Further, the Company has a right to recover the amount of GST along with penal interest
at the rate of 15% per annum if GST charged is not paid/short paid to the government or
fail to upload the details or uploads inaccurate particulars on GSTIN portal by the Supplier
/ Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
7. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to
inclusion of any other additional item of their inputs / input services under the ambit of the
Input Tax Credit provisions under the GST Act, subsequent to the date of submission of
the offer, the same should be passed on to COMPANY and you should inform such
changes to COMPANY from time to time. PGVCL’s GST Registration No.is
24AADCP1453C1ZZ
PG. 21 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
8. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed against
the PGVCL or the Contractor in pursuance of the Contract. In addition the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance with the
provision of Income-Tax Laws and to that effect a certificate will be issued to the contractor,
however added as contractor has to submit separate invoice for supply parts item as well as
works part item separately, otherwise TDS will be deducted on entire invoice value.”
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay the same
to the respective Govt. Department. Tax will be deducted as per applicable statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS, welfare
cess or any other taxes applicable time to time etc. All other statutory liabilities towards this
contract will be on your part.
11. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within the
contract period will not be considered except GST. No statutory variation will be given for
this work except GST.
12. The Contractor shall be fully responsible for deducting the P.F. of the employees/labour
Working under him as per statutory regulations and depositing the same with the
concerned authorities.
13. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses,
expenses or claims arising in connection with the death of or injury to any person employed
of the Contractor or his subcontractors for the purposes of the Works.
PG. 22 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the papers, drawings,
etc. attached & if has any doubt as to the meaning of any portion of any condition /
specification, etc. he shall before signing the contract submit the particulars thereof to PGVCL
in order that such doubts are removed.
1.2 The successful bidder shall not, without the consent in writing of PGVCL, transfer, assign or
sublet the work under this contract or any substantial part thereof to any other party.
1.3 . The execution of work should be commenced as per the instruction of the Engineer In
Charge as per actual requirement and should be completed within the time limit thereafter.
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop the work
altogether or reduce or cut it down. If the work is stopped altogether, the Bidder shall only
be paid for work done. If the work is cut down the Bidder shall not be paid for the work as
so cut down, but in neither case shall be paid any compensation what so ever for the loss
or profit which he might have made if he had been allowed to complete all the work
included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through registered post or
telegram or telex or any other way of communication to the successful bidder at his
specified address shall be deemed to have been delivered to the successful Bidder.
11. The work shall be carried out by the successful bidder with prior approval of PGVCL.
Work carried out without PGVCL’s approval shall not be accepted and the PGVCL shall
have right to reject it and to recover the cost from the successful bidder. He will be liable
against all losses, expenses or claims arising in connection with the death of or injury to any
person employed by the successful bidder or his subcontractors for the purposes of the
1.6 The successful bidder shall be responsible for any damage to the equipment during transit
due to improper or inadequate packing, handling, loading and unloading. The cases
containing easily damageable material shall be very carefully handled. Adequate protection
must be provided for outdoor storage at site in tropical humid climate, wherever necessary.
The successful bidder without any extra cost shall supply any material found short inside
intact store area.
1.7 If the successful bidder neglects to execute the work with due diligence and expedition or
refuses or neglect to comply with any reasonable orders within two days’ notice given in
writing to the successful bidder and if he fails to comply with the notice, then in such a case
PGVCL shall be at liberty to get the work or any part of it, executed through any other
agency/Bidder in the manner and on the terms it thinks proper. If the cost of executing the
work as aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to make
good the deficiency, PGVCL may recover it from the Bidder in any lawful manner.
1.8 PGVCL shall have at all reasonable time access to the works being carried out by the Bidder
under this contract and stores where material issued by PGVCL is stored. All the works shall be
carried out by the Bidder to the satisfaction of PGVCL.
PG. 23 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
1.9 The quantities mentioned in the accompanying schedule B are only approximate same may
decrease or increase. The PGVCL reserves the right for revising or omitting any of the
quantities. The actual work executed by the successful bidder will be calculated at the rate
given in the contract schedule of the rates binding to the successful bidder.
1.10No higher rate or revised rate will be application for the work, if work is held-up/closed due to
whatever so reasons.
1.11 Price shall not be changed subject to any upward/downward revision on any account whatsoever
through the period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be applicable to this
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge and
for execution of the works.
1.14 Either successful bidder or successful bidder’s authorized person should contact our
Engineer In Charge as well as Division Office, ____________ daily for the availability of
materials required for this work, failing to which this work order shall be terminated without
giving any notice.
1.15The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of Engineer In
1.16 In case of any dispute doubt, the decision of Superintending/Executive
Engineer_____________ Circle/Division shall be unchallengeable and final, which will be
binding to the contractor.
1.17Security Deposit (without any Interest) will be refunded after completion of guaranteed period
1.18 All legal complication of disputes is subject to Botad District (Gadhada)_ jurisdiction only.
1.19A fresh and valid solvency certificate to the extent of 20% of the ordered value will have to be
produced by the contractor and party has to submit attested copy of solvency certificate to
the company before commencing of work.
1.20 The successful bidder will be solely responsible for any accident/damage either to equipment
or any human being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the work.
1.22 The successful bidder will have to make his own arrangement for required all kinds of tools,
tackles, required for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s bill. The
assessment of which will be done by Engineer In Charge in consultation with division office,
and his sole discretion and his decision shall be binding to the successful bidder and shall
be considered as final and unchallengeable.
1.24 The successful bidder will have to give indemnity bond to PGVCL against any possible claim
of compensation for damage to Contractor’s equipment or staff or any of third parties during
the execution of work as per attached format.
1.25 The successful bidder will have to complete entire work, as mentioned in Schedule-B of
contract awarded to him, as per directive and instruction of Engineer In Charge. If he fails to
do so entire work will be carried out at the risk and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the clock, exclusively for
execution of work.
PG. 24 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
1.27 Specification in any items mentioned in tender are subject to change without any prior notice
and binding to the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all
relevant Govt. Authorities from the bill.
1.29 If the work is required to be carried out during fix outage then the successful bidder has to
deploy adequate man power, material, tools etc. well in advance and has to complete the
entire work during this specific outage period only, failing to which Company shall be at liable
to deduct the amount of revenue loss due to prolong outage.
1.30 The tender include all minor accessories and items of work which may not have been
specifically mentioned in the specification / Schedule etc. but are essential for completion of
work. The contractor will not be eligible for any extra payment in respect of such minor
accessories and item of work.
1.31 The successful bidder shall not refuse to execute the work order at any time and it will be his
sole responsibility to execute and complete this work as per the instruction of Engineer In
1.32 For shortage of any materials issued by the PGVCL for the work, recovery shall be made from
you, on the basis of prices of the materials (prevailing on the date of settlement of materials
account) plus 15% supervision charges.
1.33 The successful bidder has to carry out all the works in accordance with revised and latest
provision under I.E. Rule Act made there under and as per instruction of Engineer In Charge.
1.34 All the materials issued by PGVCL shall be transported to the work site on same day and to
be preserved in safe custody failing to which PGVCL shall initiate Police action. Similarly as
per instruction of Engineer In Charge, you have to credit the material at PGVCL store without
any loss of time failing to which PGVCL shall initiate Police action.
1.35 Any delay causing extension of outages shall be successful bidder’s responsibility and
appropriate amount (in term of Rupees) as decided by Superintending/Executive Engineer,
__Gadhada_ Circle/Division shall be recovered from successful bidder’s bill as a penalty with
applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
1.37 The contractor has to follow all labour laws, safety rules and regulations. The PGVCL does
not take any responsibility in case of accident or injury to the workers. The safety, security of
men, materials and equipment shall be sole responsibility of the contractor.
1.38 The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and that of
local body is a must condition for the successful bidder.
1.39 The successful bidder shall specifically note that PGVCL will not pay any extra amount
towards any type of claim except for the description indicated in Schedule –A. The party has
to carry out all other additional required activities / work as directed by Engineer In Charge
which is not mentioned in Schedule but required to be completed as per the site condition
and for this work no extra payment shall be made by PGVCL.
1.40 The contractor should employ as a Supervisor with sufficient qualification and experience
who could supervise the execution of work throughout. He should always be present on the
1.41 The contractor shall be responsible for breakages, losses and a theft of material during
transit or erection after the materials issued from the stores till the completion of work and
is taken over by the PGVCL.
PG. 25 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
1.42 As regard damages to the materials, equipment, successful bidder himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN”
Compensation Act or any other statutory provisions, the same will be paid by contractor
directly. If he thinks fit, he may take necessary insurance covering at his cost.
1.43 The successful bidder shall co-operate with the PGVCL for taking measurement etc. as early
as possible and he shall fulfil the entire requirement which is necessary to finalize the
1.44 The competent authority can delete any item in schedule of the tender if he feels that the rate
quoted by the contractor for the item is abnormally high when compared to the estimated
1.45 The successful bidder shall not refuse to execute this work order at any time and it will be his
sole responsibility to execute and complete this work as per the instruction of Engineer In
1.46 The erection work should be carried out according to the specification as per instructions
and programmed laid out by the Engineer in charge. Contractor has to ensure safe
shifting and erection of all accessories / equipment as per standard norms.
1.47 The Bidder shall not display the photograph of the work and shall not take advantage through
publicity of the work without written permission of PGVCL.
1.48 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s
representative shall not relieve the successful bidder from full responsibility of completing
the work confirming to the requirement of this contract.
1.49 Under the Contract, the Contractor shall be responsible for loss or damage to the line and
Electrical Equipment until the successful completion as defined elsewhere in the Bid
1.50 All demurrage, wharf age and other expenses incurred due to delayed clearance of the
material or any other reason shall be to the account of the Contractor.
1.51 The law applicable to the contract shall be the laws in force in India. The courts of Rajkot shall
have exclusive jurisdiction in all matters arising under the contract.
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm price basis
(Inclusive of all Taxes) and lowest evaluated bid in the interest of the PGVCL, for the
complete works covered under these specifications and documents.
If more than one party is to be considered for placement of order, they willhave to match their end
cost with end cost of L-1 technically acceptable bidder. PGVCL (tender Inviting Authority)
may go to the L-2, L-3 and so on depending upon the requirement. If PGVCL (tender
Inviting Authority) feels that there is lack of serious competition or any other reasons,
PGVCL (tender Inviting Authority) may negotiate with the L-1 party. PGVCL’s (tender
Inviting Authority) decision shall be final and binding on all the parties.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each concerned
Divisions under above locations. The planning for each location has to be prepared in
consultation of the Deputy Engineer of the concerned Sub Division under whose control the
work is allocated. The work must be carried out under Supervision of concerned S/dn Head or
Authorized Staff appointed by SDO.
PG. 26 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be alloted from any store Centres of
PGVCL jurisdiction and successful bidder has to take delivery from these stores at his own
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued
Fourth Sub Work Order only after the submission of Inventory sheet with sketch and
material account statement for any of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to the respective sites and
will be fully responsible for any damage to or loss of all materials at any stage during
transportation or erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe custody of all
the stored materials at his own cost. Material which is to be allotted by PGVCL is to be carted,
loaded and unloaded at Bidder’s cost and risk from PGVCL’s respective Stores. PGVCL must
have access to such Store/s at any time of Day thought the contractual period and Contractor
will cooperate for verification of such store/s and Inventory accounting. Failing to which actions
may be initiated after issuance of required Notice to the Contractor. Store address/s is to be
mentioned in the “General information about the Bidder” under Section I of this Tender.
7.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment and
works from theft, fire pilferage and any other damages and loss. It shall be the responsibility of
the contractor to arrange for security till the works are finally taken over by the PGVCL
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent
of 100 % cost of materials, which are required to complete the work. Contractor shall have to
take comprehensive insurance policy equivalent to the Order Value against any loss, damage,
theft, pilferage, fire etc. for the complete period of storage, erection and commissioning up to
the time of taking over by PGVCL. The Contractor shall deal directly and pursue the claim with
the Insurance Company and shall be responsible in regard to maintenance of all insurance
coverage as well as for settlement of claim. The proof of insurance policy taken by the
successful Contractor shall be furnished to Engineer-In-Charge. In absence of the above
insurance policy, R.A. Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items, materials and
the PGVCL shall be kept informed about it. Contractor shall replace the lost / damaged
materials / items promptly irrespective of the settlement of the claims by underwriter and
ensure that the work progress is as per agreed schedule. The loss, if any, such replacement
will have to be borne by the Contractor and PGVCL will not entertain any claim / representation
in this regard. However it will be contractor's responsibility to insure the entire project is taken
over by the PGVCL.
8. Account of material issued
8.1 The successful bidder shall have to maintain accurate day to day item wise account of use
of issued materials which shall be got checked from time to time by the Engineer In
Charge of the Company. The contractor will be responsible for custody and preserving the
issued materials till the work is hand over by the contractor after completion.
8.2 The successful bidder has to maintain site register, covering all the daily details of material
receipt and utilization, progress of work etc. This register shall be checked and signed by
PG. 27 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Engineer In Charge/Deputy /Executive Engineer,___________ Sdn/Division during the site
visit as per requirement and exigency of work if deem fit.
8.3 After completion of the work against each Sub Work Order, all the surplus materials issued
by the PGVCL shall be returned by you to the respective divisional /Regional stores only at
contractor’s cost. Do not credit this material in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to complete the
ordered work within __365__ Days from the Date of issue of Work Order.
9.2 Time limit of each sub work order should not be maximum up to 60 Days.
9.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due to heavy
rains or other reasonable causes, such facts should be immediately brought to notice of
the Engineer in Charge. If the reasons for stopping the work are genuine the Engineer in
Charge may ask the successful bidder to start the work again as per condition. The period
of such stoppage will not be considered as a part of working days moreover the successful
bidder cannot claim compensation for such stoppage.
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to Engineer In
Charge and Executive Engineer__GAdhada_. If found that the work is unsatisfactory or not
progressing as per schedule then any action would be taken by the PGVCL as may
deemed fit to see that work is completed at the risk and cost of contractor. The completion
time allowed for each Sub work Order shall be strictly observed.
10 Time limit extension will be given, as per Clause No. 12 of this section, if material is
not supplied in time and in any case of objection not cleared in time. But if materials
given in time and there is no any objection, then no time limit extension will be
granted and penalty with applicable GST will be imposed as per rules.
11 CHANGE OF QUANTITY
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or decrease
the quantities of items under the Contract but without any change in unit price or other
terms & conditions. Such variations unless otherwise specified in the accompanying GCC
and/or Technical Specifications, shall not be subjected to any limitation for the individual
items but the total variations in all such items under the Contract shall be limited to the
extent of 30% (Thirty Percent) of the contract price by way of suitable amendment to the
11.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above. The base unit rates, as identified in the
Contract shall however remain constant during the currency of the Contract, In case the unit
rates are not available for the change in quantity, the same shall be subjected to mutual
11.3 As this is an EPC contract, engineering work will be done by the Contractor. Responsibility
of material will be that of the contractor.
12 Penalty with GST:
12.1 Penalty with GST is levied on the time limit of Sub Work Orders. If the work is not
completed within the scheduled period as prescribed in Sub Work Order, penalty + GST at
the rate of 0.5 % per week or part thereof on delayed portion subject to maximum up to
% of the sub work order Value with GST as per applicable rate. This will be deducted
PG. 28 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
from the bills payable either against this contract or any bank guarantee or any other
amount payable under any other contract with the PGVCL. For Penalty calculations or Time
limit Extension, following points are to be observed.
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on which the
first material is issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by Store In-
charge/Store Keeper must be taken against the particular item by the contractor.
12.4 In Case of non-availability of Material, contractor must visit the respective store every
fortnight and no stock material details are to be submitted to respective Executive
Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such documents produced by
12.6 Time limit Extension must be given as per F & a Letter No. PGVCL/F&A/5083/14-06-2017
and PGVCL/F&A/745/11-06-2018.
12.7 At the time of submission of Bill against SWO, all such Documents are to be submitted by
contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
12.9 During the execution of Work, if Contractor/Labour are found violating OR Braking the
Safety rules and Regulations, then Engineer-in-Charge will serve the warning Notice on first
Instance. On second Instance the amount of Fine will be Rs. 500.00 or 0.1 % of amount of
SWO (Whichever is high). Even If after above two instances, still Contractor found breaking
of Safety Rules and Regulations then Procedures for Stop dealing must be initiated against
him as per rules and regulations.
13 Pyment terms shall be as follows:
13.1 Payment will be made against Invoice value and shall be paid against actual execution. The
bills should be submitted in Duplicate to respective Superintending/Executive Engineer,
Circle/Division Office along with following documents:
• Measurement Report of each site by PGVCL authorized inspection Officer (not below the
rank of Deputy Engineer)
• Material accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
• Copy of Insurance Policy against the Material equivalent to the Order Value as per
Tender Condition No. No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from the
actual date of completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
13.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise only final
bill shall be paid.
13.3 The time limit for the work may be reduced and contractor should make all his efforts to
complete the work within stipulated time limit as may be given by the Engineer In Charge
depending upon emergency of work
PG. 29 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
14 FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties including:
14.1 War and other hostilities, (whether war be declared or not), invasion, act of foreign enemies,
mobilization, requisition or embargo;
14.2 Rebellion, revolution, insurrection, military or usurped power and civil war;
14.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel or from any nuclear
waste from the combustion of nuclear fuel, radioactive toxic explosive, or other hazardous
properties of any explosive nuclear assembly or nuclear components thereof;
14.4 Riot, commotion or disorder, except where solely restricted to employees of the Contractor.
14.5 Neither party shall be considered to be in default or in breach of his obligations under the
Contract to the extent is that performance of such obligations prevented by any circumstances
of Force Majeure that arise after the date of the Notification of Award.
14.6 If either party considers that any circumstances of Force Majeure have occurred which may
affect performance of his obligations he shall promptly notify the other party.
14.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor shall
endeavour to continue to perform his obligations under the Contract so far as reasonably
practicable. The Contractor shall notify the Engineer-in-Charge of the steps he proposes to
take including any reasonable alternative means for performance, which are not prevented
by Force Majeure. The Contractor shall not take any such steps unless directed so to do by
the Engineer-in-Charge.
14.8 If circumstances of Force Majeure have occurred and shall continue for a period of
days, notwithstanding, the Contractor may by reason thereof, having been granted an
extension of Time for Completion of the Works, either party shall be entitled to serve upon
the other, 30 days’ notice to terminate the Contract. If at the expiry of the period of 30 days
Force Majeure shall continue, the Contract shall terminate.
15 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works
connected with line having been completed correctly as per Indian Electricity Rules &
procedure. Any extra cost involved due to incompleteness of work or bad workmanship
found out subsequently shall be set right with and by you at your own cost.
16 HANDING OVER OF ASSET
16.1 After successful completion of the lines and Transformers or any other electrical equipment
the entire newly created network is to be handed over to the concern Deputy Engineer of
PGVCL. The handing over note covering the details of all the materials used and total work
executed must be signed jointly by the bidder and PGVCL Engineer. Copy of handing over
note must be attached along with bill.
16.2 The contractor shall arrange to hand over the complete work immediately on completion of
If some material/Item is not installed/fixed for allotted work and as per SOR by contractor
due to non-availability of particular item/material for long period of time and TLE cannot be
approved for that work beyond certain time limit Or such item if not required to be installed
at particular location, then Recovery is to be made as mentioned below for not carrying out
that work from SWO issued for that work.
PG. 30 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No any other
Recovery should be made other than above Work.
18. CONTRACT QUALITY ASSURANCE:
18.1 The Bidder shall include in his proposal the Quality Assurance Program containing the
overall quality management and procedures which he proposes to follow in the performance
of the Works during various phases as detailed in relevant clause of the General Technical
18.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for
the execution of the Contract. PGVCL reserve the right to inspect the work at any stage of
contract i.e. during the execution and after the execution of work.
18.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items (if
any) are being supplied. Such details shall be accompanied by their list of previous supplies made
performance reports etc. However, in case of orders are placed, specific approval shall be
obtained from the PGVCL for the vendor supplied materials. The quality assurance program shall
be furnished for each material separately for approval.
19. TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
19.1 In case of any type of misappropriations, cheating or intention of cheating, frauds,
irregularities, malpractice, etc. the Managing Director PGVCL reserves the right to cancel
the order without giving reasons thereof and forfeit the security deposit.
19.2 The PGVCL reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the Contractor of his
decision to do so.
19.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall discontinue
the work on the date and to the extent specified in the notice, make all reasonable efforts to
obtain cancellation of all orders and Contracts to the extent they are related to the work
terminated and terms satisfactory to the PGVCL, stop all further sub-contracting or
purchasing activity related to the work terminated, and assist PGVCL in maintenance,
protection, and disposition of the works acquired under the Contract by the PGVCL. In the
event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
19.4 If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless
the PGVCL is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract the PGVCL shall be entitled to cancel
the Contract as to its in completed part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the
PGVCL that the legal representatives of the deceased Contractor or surviving partners of
the Contractor’s firm cannot carry out and complete the Contract shall be final and binding
on the parties. In the event of such cancellation the PGVCL shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
PG. 31 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
and/or the surviving partners of the Contractor’s firm liable to damages for not completing
20. ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder, in
connection with this agreement except as to matters, the decision for which has been
specifically provided, either party may forthwith give to the other notice in writing of
existence of such questions, dispute, difference and the same shall be referred to the sole
arbitration of a person nominated by Managing Director, PGVCL. This reference shall be
governed by Indian Arbitration Act prevailing at the time of dispute and the rules made there
under. The award in such arbitration shall be final and binding on all the parties. Work
under the agreement shall continue during the arbitration proceedings unless the PGVCL or
the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents forming
part of the enquiry or Contract are property of PGVCL and shall not be used for any other
purpose, except for the execution of the contract. All rights related to the technical
specifications, drawings and records are reserved by PGVCL only and no part or partial
should be reproduced, copied or alter without prior permission to PGVCL in writing. In the
event of the breach of this provision, PGVCL can claim the damages caused by such
22. Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
22.1 Has submitted fake, false or forged documents/certificates
22.2 Has revised/withdrawn price bid after opening of Techno: commercial bid, until and unless it
22.3 Has refused to accept Letter of Acceptance/Purchase Order/Work Order after the same is
issued by the Company within the validity period and as per agreed terms and conditions
22.4 Has committed breach of contract or has failed to perform a contract or has abandoned the
22.5 Has failed to provide suitable expertise for the work as per prescheduled program
22.6 Has failed to submit all the necessary Test reports/documents within time schedule / as per
Company's time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is placed
subject to submission of type reports / documents to the firm.
22.7 Has indulged in construction and erection of defective works.
22.8 Has substituted materials In lieu of materials supplied by the Company or has not returned
or has short returned or has unauthorised disposed of materials/ documents/ drawings/
tools or plants or equipment supplied by the Company
22.9 Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage
22.10 Has unauthorised obtained official company information or copies of documents, in relation
to the Tender/Contract
22.11 Has failed to follow the stipulated mode of communication, if specified by the tendering
authority/ purchaser.
22.12 Any other ground for which in the opinion of the Company makes it undesirable to deal with
22.13 In case the State Government directs the Company to place a firm in stop dealing/ banned
for business dealing/ blacklisting
PG. 32 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
23.14 The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or any
subsidiary Companies of GUVNL shall be considered as a stop deal and/ or banned for
business dealing and/ or blacklisting for all Companies.
23. Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing are as
23.1 The proprietor/all the partners/directors of the stop deal/ banned for business dealing/
blacklisting firm shall also be considered for stop deal/ banned for business dealing.
23.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in the list
of Stop dealing / Banned for business dealing in any Company of GUVNL and its Subsidiary
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid submitted by the Firm
shall be returned.
23.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put on Stop
dealing/ Banned for business dealing by GUVNL or any of its subsidiary Companies, during
tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected Bid” at the time of scrutiny of
Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price bid, the price bid of the Firm
should not be opened and the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected Bid” at the time of scrutiny of
(iii) After opening of price bid, the offer of the Firm should be ignored and will not be
further evaluated. The Firm will not be considered for issue of order even if its price is
the lowest. In this situation, the next lowest bidder shall be considered as L1.
(iv) The EMD submitted by the Firm with tender should be returned after obtaining
confirmation from GUVNL and its other subsidiary Companies that there are no
outstanding dues recoverable from the firm.
23.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and is
already executing work and/ or Letter of Acceptance/ purchase order awarded to them by
another Company, then the firm should be allowed to complete such awarded work / supply.
23.5 The amount of EMD/SD/ any payment against supply withheld at the instance of GUVNL or
any of its subsidiary Companies shall be appropriated against the dues recoverable from
the firm by GUVNL or any of its subsidiary Companies. EMD/ SD/ PG in the form of bank
Guarantee shall be encashed and appropriated.
23.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm is
put on Stop dealing/ Banned for business dealing, all the manufacturing works of the Firm
shall be on Stop dealing/ Banned for business dealing for GUVNL and its Subsidiary
Companies & for all Services of the Firm.
23.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary Concern,
then all the Concerns of the same Proprietor shall also be considered to be on Stop
Dealing/ Banned for business dealing.
23.8 The Board of Directors of the concerned Company may however, if he considers it to be in
the interest of the Company, remove the ban in respect of any specific Service from any
Contractor for that Company only.
PG. 33 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
24. Every bidder should, at the time of submission of bid, give a declaration as per Annexure
VI attached with this Tender, that bidder and/or proprietor/ partner/ director of the firm has
not been placed on Stop dealing / Banned for business dealing / blacklisting by GUVNL and
it’s any Subsidiary Companies.
25. Jurisdiction:
All questions, Disputes Or differences arising under out of or in connection with tender / contract if
concluded shall subject to the exclusive jurisdiction of the court under whose jurisdiction the
place from which tender /Acceptance if Tender is issued, is situated, i.e. respective
location’s court.
26 .PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
26.1 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and having experience
of required work for this tender along with satisfactory work completion certificate regarding
execution of work, including work order outward number along with its value, from order
issuing authority, for last 3 (three Years) _ ending last day of month previous to the one in
which tenders are invited., of any DISCOM of GUVNL or any Govt. / Private DISCOM of any
state of India. The work executed through open / advertised tender shall only be considered
for experience of work. The work done through limited tender shall not be considered for
These bidders will be considered as an experience bidder.
26.2 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. And not possessing
any experience of work can also participate in this tender. These bidders will be considered
as an NEW bidder.
26.3 The Contractors whether non-experienced / New or experienced / Regular who have
confirmed /fulfilled pre eligibility criteria , as mentioned in Section 1 sr No 2 , will only be
considered for price evaluation. PGVCL will not consider the, price bid of any contractor who
does not confirm / fulfil the eligibility criteria as mentioned in Section 1 sr No
26.4 While placing the order, the quantity distribution to each new contractors / new firms shall be
restricted up to 30 % of the tender amount/Qty. for all such new bidders provided the price of
new contractor is lower than the regular/experienced contractor. New contractor / new firm will
be considered as a regular contractor only after full filing experience criteria as mentioned in
Bidders qualifying criteria as per point no. 2 in Section I.
26.5 The new contractor will be asked to match the L-1 prices of the new contractor only and the
Regular contractor has to match the L-1 price of the Regular/experienced contractor only.
26.6 But if there are no Regular contractor OR if the rate of Regular contractor is very high, the
above condition no. 2.11 shall be suitably relaxed by PGVCL. L-1 regular contractor however
will get heavy weight age in order placement.
PG. 34 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
PASCHIM GUJARAT VIJ CO. LTD.
Regd. & Corporate Office,
‘’Paschim Gujarat Vij Seva Sadan ‘’Opp Nana Mava Main Road Laxminagar Rajkot-360004.
CIN U40102GJ2003SGC042908
Circle Office, Old Power House Compound, Botad-364710
PH:- (02849) 256002 Fax:- (02849) 256001 E-Mail: [email protected]
Subject:-Amendment for the Launch of the "Call Before You Dig" (CBuD) Mobile Application in Line
with the Work of HT/LT Line, TC, LT ABC & HT ABC & U/G SCH (All Schemes) under All SDNs of
_______________ Division
Reference: (1) PGVCL/1189/03/2023 Dated: 20-03-2023
The amendment regarding the launch of the “Call before You Dig” (CBuD) Mobile Application is made in line with
The work of HT/LT Line, TC, LT ABC, and HT ABC (under all schemes) for all SDNs under _____________Division.
The Department of Telecommunications (DoT) has developed the “Call
before You Dig” (CBuD) mobile application to prevent damage to
underground utility infrastructure during excavation. The app is being
launched by the Hon’ble Prime Minister on 22.03.2023, and immediate action
is required at all levels for successful implementation.
Applicability to PGVCL:
To include additional terms and conditions while preparing forthcoming tenders, contractors must be
instructed to obtain permission letters generated online/offline through the “Call before You Dig” (CBuD)
mobile application for any work involving excavation activity.
Similarly, for existing mobile applications or ongoing work orders, it is now
mandatory to instruct all contractors to register in the CBuD app and obtain
PG. 35 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
the required excavation permissions, either online or offline, before
beginning work.
Executive Engineer
Division Office, _____________
1. Deputy Engineer (Tech-1 & Tech-2), PGVCL, DO, _______________
PG. 36 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Details of work experience in last three years
(To be completely filled by the Bidder)
Company with full Ref. & date Work
Sr. Details of order
address, phone, fax Work Description of the Order
and name of contact order Value
• Copies of MAJOR Work orders along with Work completion certificates should be attached with this
• If necessary, separate sheet may be used to submit the information
PG. 37 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Company with full Ref. & date Work
Sr. completion with
address, phone, fax Work Description of the Order
No. Certification of Order
and name of contact order Value
issuing Authority
• Copies of Resumes and appropriate certifications should be attached with this information.
• If necessary, separate sheet may be used to submit the information.
PG. 38 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________, employee of PGVCL at
_______________________ (designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent Department i.e. Energy &
Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
PG. 39 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in signed and stamped for each
quoted item of the tender along with the Technical Bid.
M/s_________________________________________________ is not stop deal/black listed by GUVNL
and or any subsidiary companies viz. PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered
PG. 40 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
List of Performance Certificate:
Name of the Authority by whom
Sr. No. Reference No. & Date Details of items
certificate is issued
PG. 41 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five Years
Sr. Type Of Accident Nos. of Affected Brief Reason for the
No. (Electrical/Mechanical) Labour/s Accident
PG. 42 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR MISHANDALING
M/s_____________________________________________ hereby declare we will provide ______
nos of labours to carry out this tenders scope of work. We are having Labour Insurance Policy
No.____________________ for ________ nos of our labours. We declare that, as mention below
table, we are having following safety gadgets of our own and they all are in good condition.
PG. 43 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
List of safety Gadgets owned by Bidder
List of Safety Gadget Unit owned by
1 Hand Gloves for LT Pair
2 Earthing Rod No
4 Other safety items
NOTE: SAFETY FIRST – The bidder will follow the company’s safety norms and compulsory use the
safety gadgets mentioned above. Failure to use safety gadgets by the bidder will result in action as
per the company norms and will be penalized.
PG. 44 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
PG. 45 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having their
registered office at _____________________________________ (Address of the firms Registered office)
(hereinafter called the ‘Tenderer’) wish to participate in the tender No.
Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
_________________________ Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank Guarantee for
(hereinafter called the “Beneficiary”) Rs._____________ (Amount of EMD) valid till _________ (Mention
here date of validity of this Guarantee which will be 5 (FIVE) months beyond initial validity of Tender’s
offer) which is required to be submitted by the tenderer along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank Guarantee)
having our registered office at ______________________ (Address of Bank’s registered office) hereby give
this Bank Guarantee No.________________ dated _________ and hereby agree unequivocally and
Unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij Company Ltd. or
any officer authorized by it in this behalf any amount not exceeding Rs. ______________ (Amount of
E.M.D.), (Rupees _________________________________ (In words) to the said Paschim Gujarat Vij
Company Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender or part
thereof by the Tenderer within its validity or Non submission of Security Deposit by the Tenderer within
one month from the date tender or a part thereof has been accepted by the Paschim Gujarat Vij Company
Ltd. would constitute a default on the part of the Tenderer and that this Bank Guarantee is liable to be
invoked and encashed within its validity by the Beneficiary in case of any occurrence of a default on the
part of the Tenderer and that the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of ____________________
(Mention here the date of validity of Bank) and shall not be terminable by notice or by Guarantor change
in the constitution of the Bank or the firm of Tenderer Or by any reason whatsoever and our liability
hereunder shall not be impaired or discharged by any extension of time or variations or alternations made,
given, conceded with or without our knowledge or consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking practice,
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or Subsidiaries). Notice
or invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by
the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is restricted to Rs.
Guarantee shall remain in force till _________ (Date of validity of the Guarantee). Unless demands or
claims under this Bank Guarantee are made to us in writing on or before_______ (Date of Validity of the
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released
and discharged from all liabilities there under:
Please Mention here Complete Postal Address
Signature of the Bank’s Authorized Signatory with
of the Bank with Branch Code, Telephone and
Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis
Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat (GoG)
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of
Gujarat (GoG) from time to time.
PG. 46 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
This agreement is made at ___________the ___ day of ______month _______Year between the Paschim
Gujarat Vij Company Ltd. & __________________________ (hereinafter referred to as “the Contractor
“which expression shall unless excluded by or repugnant to the context included its successors or permit
assigns) of the one part and the Paschim Gujarat Vij Company Ltd. Having its Regd. and Corporate Office at
Laxminagar, Off Nanamava Road, Rajkot, 360004 (hereinafter called “The Company” which expression
shall unless excluded by or repugnant of the context include its successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work of
____________________, Dated ___________, hereinafter called “The works and more particularly
desorbed enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer, , Circle/Division, PGVCL on behalf of the
Company, a list where of is made out in the schedule here under written and all of which said documents
are deemed to form part of this contract and include in the expression “The works “wherever herein used,
upon the terms and subject to the conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance & Erection of
HT / LT Line & T/C and Underground cable up on the terms and subject to the conditions herein
1.) The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable necessary for
the completion of the works as mentioned and at the time in the manner and subject to the terms
conditions and stipulation contained in this contract and in consideration of the due provision,
executions, construction and completion of the works agreed to by the contractors as aforesaid
the company both hereby covenant with the contractor to pay all the claims of money as and
when they become due and payable to the contractor under the provisions of the contract such
payment to be made at such times in such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to and without
prejudice to the right of the company to enforce for delay and or any other rights whatever
including the right to reject and cancel on default or breach by the contract of the conditions and
the covenant as stipulated in the general conditions specifications form Or tender schedule
drawing etc. attached with the Company LOA No. ____________________________, Dated
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his Supervisors and
labours to execute the work mentioned in Tender. On violating or breaking the Safety Rules and
Regulations, and if Supervisors/Labours are found without Safety Gadgets, “The Company”
reserves the right to take actions as per the terms and conditions mentioned in Tender without
4.) The Company reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default’. The PGVCL shall in such
an event give fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and to the
extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders and
Contracts to the extent they are related to the work terminated and terms satisfactory to the
Company, stop all further sub-contracting or purchasing activity related to the work terminated,
and assist “The Company” in maintenance, protection, and disposition of the works acquired
under the Contract by the Company. In the event of such a termination the Contractor shall be
paid compensation, equitable and reasonable, dictated by the circumstances prevalent at the time
of termination.
PG. 47 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
6.) If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies
and if the Contractor is a partnership concern and one of the partners dies then unless “the
Company” is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract “the Company” shall be entitled to cancel the
Contract as to its in completed part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the Company
that the legal representatives of the deceased Contractor or surviving partners of the Contractor’s
firm cannot carry out and complete the Contract shall be final and binding on the parties. In the
event of such cancellation the Company shall not hold the estate of the deceased Contractor
and/or the surviving partners of the estate of the deceased Contractor and/or the surviving
partners of the Contractor’s firm liable to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may be altered
by mutual agreement and if so altered shall not be deemed or constructed to mean and to effect or alter
other terms and conditions of the contract and the contract so altered or revised shall be and shall always
be deemed to have been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first above
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
PG. 48 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the COMPANY
having given contract for the work of _________________________________
__________________________, dated _______________ and all future contract that may be awarded to
me in the next one year and in terms of the condition in clause 33 of the COMPANY’s tender and contract
I residing at by this Bond bind myself responsible for and shall pay
compensation to my workmen payable under the workmen’s compensation ACT – 1923 (viii of 1923)
hereinafter called the said Act for death or injuries caused to the workmen engaged by this presents, if
such compensation is paid by the COMPANY as principal under such sub-section (1) of section 12 of the
said Act on behalf of me, to pay such amount of compensation on demand within 48 hours to the
COMPANY that it might have to spend as legal and other incidental charges in defending any suit or action
arising out of the death of injuries in regard to compensation paid to the workmen or heirs of the
deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death or
injuries to the workmen engaged by me. During the execution of work of said contract and all future
contracts that may be awarded to me in the next one year is filed by the worker against the COMPANY, I
shall imbrues to the COMPANY such sum that the COMPANY is required to spend as legal and other
incidental charges in defending such suit or action and also the amount that may be ordered to be paid to
the worker / or his heirs as compensation and that the above written bind shall remain in full force and
virtue till the COMPANY is required to defend such suit or action filed by the workers and or heirs against
the COMPANY. Further it is applicable on death of contractor himself also. No any compensation will be
claimed by legal heirs of contractor.
Signature of the Executant
PG. 49 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
SECTION VIII: SCHEDULE B
LABOUR RATES FOR CAPITAL WORKS (Excluding GST)
DETAILS OF WORKS UNIT Rate for
PROVIDING SINGLE PHASE SERVICE CONNECTION WITH PVC2.5/4.0 MM2 TWIN CORE
CABLE FROM TERMINAL POLE TOMETERING POINT INCLUDING FIXING OF METER &
COMPLETE WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING COST OF
PROVIDING THREE PHASE 4 WIRE SERVICE CONNECTION WITHPVC 4MM2/10MM2 FOUR
CORE CABLE FROM TERMINAL POLETO METERING POINT INCLUDING FIXING OF METER &
COMPLETE WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING COST OF
PROVIDING SINGLE PHASE SERVICE CONNECTION (FOR SOLAR GENERATION METER,HIGH
RISE BUILDING,COMPLEX ETC) WITH PVC 2.5/4 MM2 TWIN WIRE CORE CABLE FROM
COMMON BUS BAR TO METERING POINT INCLUDING FIXING OF METER & COMPLETE
WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING COST OF MATERIALS
PROVIDING THREE PHASE SERVICE CONNECTION (FOR SOLAR GENERATION METER,HIGH
RISE BUILDING,COMPLEX ETC) WITH PVC 2.5/4 MM2 TWIN WIRE CORE CABLE FROM
COMMON BUS BAR TO METERING POINT INCLUDING FIXING OF METER & COMPLETE
WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING COST OF MATERIALS
Labour Rates for maintenance work of Service Line etc. (Excluding of GST)
(All Rates are with transportation charges /all material including - M.S. Nut-Bolts of all size will be
supplied by PGVCL / Paints & Colour to be purchased by the contractors.)
(A) LT-LINE AND SERVICE CONNECTION MAINTENANCE WORK (Excluding GST)
Item Unit Rate for
5 Replacement of service lines with MMB & meters with all accessories as under:
1 Phase Connection
Replacement of service lines with Meter Box & meters by using
6A G.I. Wire No. 8/10, Real insulator at the distance of 1.0 Mtr., two No.
nos. of egg insulator, wall fast, service angle, PVC Service pipe etc.
at equal vertical distance with giving connections of service.
6AA -do-without meter box and meter No.
3 Phase Connection
Replacement of service lines with Meter Box & meters by using
7A G.I. Wire No. 8/10, Real insulator at the distance of 1.0 Mtr. two No.
nos. of egg insulator, wall fast, service angle, PVC Service pipe etc.
at equal vertical distance with giving connections of service.
7AA --do-- without meter box and meter No.
8 Labour charge for replacement of Meter Box without meter.
PG. 50 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
8.a 1 Phase Conn. No.
8.b 3 Phase Conn. No.
9 Labour charge for replacement / providing of meter and Meter Box
9.a 1 Phase Conn. No.
9.b 3 Phase Conn. No.
10 Replacement of meter / providing only
10.a 1 Phase Conn. No.
10.b 3 Phase Conn. No.
11 Labour charge for installation of 3 phase Meter Box & 3 phase Meter on T.C. complete in
all respect including carting of materials from respective store as per instruction of
engineer in-charge.
11.a In City Area Set
11.b In Rural Area Set
12 Providing leads of service wires on L.T. Line with 8 to 10 turns with insulation and 8 to
turns of bare wire with L.T. Line conductor and providing insulated PVC tape on it.
12.a Per 1 Phase S/C. No.
12.b Per 3 Phase S/C. No.
13 Stringing of Twin wire No.
14 Single Phase Meter, SMC & Service Shifting Work No.
15 Providing Pole SMC BUS-BAR No.
(Providing leads of service wires on on BUS BAR per service)
Executive Engineer
Division Office, Gadhada.
PG. 51 Tender Notice No.: GDN/Tech-3/Store/1042-05 DT 28.04.2026
Sign & Stamp of the Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GDN Tender for 1 ph 3 ph Meter 1042-05.pdf
Download all tender documents and submit your bid