| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.0 LAdmitted-Finance | -19.19% | ₹40.0 L | L1 | Admitted-Finance |
| 2 | L2₹41.6 L+₹1.6 L (3.95%)Admitted-Finance | -16.00% | ₹41.6 L+₹1.6 L (3.95%) | L2 | Admitted-Finance |
| 3 | L3₹44.0 L+₹4.0 L (10.00%)Admitted-Finance | -11.11% | ₹44.0 L+₹4.0 L (10.00%) | L3 | Admitted-Finance |
| 4 | L4₹48.6 L+₹8.6 L (21.6%)Admitted-Finance | -1.77% | ₹48.6 L+₹8.6 L (21.6%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹49.5 L
EMD Value
₹98,980
Closing Date
24 Jun 2026, 6:00 pmClosed
Executive Officer Dei
NAGAR PALIKA DEI
AS PER TENDER DOCUMENTS
2026_DLB_568009_1
Civil 551
Open Tender
Civil Works
Percentage
180 days
DEI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Tendar fee payble EO Dei
₹98,980
Yes
3 Jul 2026
15 Jun 2026
25 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, ncluding getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 660 | Cum | 229.5 | ₹1,51,470 |
| 3 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 440 | Cum | 2,955 | ₹13,00,200 |
| 4 | Providing and fixing of 60mm thick precast cement concrete interlocking paver block casted with rubber moulds in approved reflective colour and design having minimum compressive strength of 300 kg/ sq cm. The CC paving blocks be laid on average 50mm thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer in-charge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications. | 4,400 | sqm | 795 | ₹34,98,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_1010461.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .