Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
30 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive enginner, Savarkundla Divison, PGVCL
Labour Charges For Erection & maintenance work for HT,LT & TC Work under VIJAPDI SDN(HVDS SCHEME FY- 2026-27) for savarkundla Divison.
288683
66/AMCO-03/2026 SKD 26/97
Open
Electrical
Amreli
15 documents required · 14 mandatory · 1 optional
₹1,475
Yes
PGVCL SAVARKUNDLA
₹30,000
Yes
23 Mar 2026
23 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
1.8 The "Contract Value" shall mean the total amount indicated in the contract
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in
Electronic format on website www.nprocure.com before the validity period
mentioned in tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Offers only in physical form will not be accepted in any case.
4 UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS
ANDSPECIFICATIONS
4.1 All interested parties are requested to understand this Tender Document
in detail in order to comply with PGVCL’s requirements including but not
limited to the Tender fees, EMD and deadlines, selection criteria,
selection methodology, scope of work, and minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and
documents and fully inform himself as to all the conditions and matters
which may in any way affect the Work or the cost thereof. If any Bidder
finds discrepancies or omissions in the specifications and documents or is
in doubt as to the true meaning of any part, he shall at once request in
writing in advance before filling in the tender, within the time limit as per
Table no 1, for an interpretation / clarification by the PGVCL
SavarkundlaDivision office& Amreli Circle Office.
Sign & Stamp of the Bidder
Then The PGVCL SavarkundlaDivision office or Amreli Circle Office will
issue interpretation and clarifications as he may think fit of such
interpretations and clarifications, the Bidder may submit his bid but
within the time and date as specified in the Table no1. All such
interpretations and clarifications shall form a part of the specifications
and documents, and accompany the bidder's proposal. In case of
difference of opinion about interpretation of specification etc. the
decision of Superintending/Executive Engineer, SavarkundlaDivision will
be final and shall be binding to the contractor.
4.3 Verbal clarifications and information given by the PGVCL or his
employee(s) or his representative(s) shall not in any way be binding on the
4.4 All interested parties requested to strictly abide by all terms prescribed in
this RFP Document and provide accurate information to the best of their
knowledge without misleading PGVCL to be considered for participation in
4.5 Bidders should be in touch with websites https://pgvcl.nprocure.com
&www.pgvcl.com for information regarding revision / corrigendum /
Amendment in the Tender Document till due date of online / off line
submission and thereafter. No separate information shall be sent in this
regards and also not publish in newspaper.
5 TENDER FEES (Non Refundable&Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules
in force during this Tender Period.
5.1 The Tender fees is payable, as per following Table,between the dates
mentioned in Table no 1 ,by cash& DDor Banker’s Cheque if total amount of
mentioned in Table no 1 ,by cash& DDor Banker’s Cheque if total amount of
Tender fees plus applicable GST is less than Rs 10,000/- or only by Demand
Draft (DD), if the said amount is more than Rs 10,000/, in favour of the
Paschim Gujarat Vij Company Limited payable at ___________ on any
Nationalized /Scheduled banks
Tender Fees Present rate Total Tender
Sr. No. Tender Amount
in Rs. of GST Fee
Above Rs 5,00,000/-
5.2 The tender fees once paid for tender document will not be refunded under
any circumstances or not transferred to other bidder.
Sign & Stamp of the Bidder
5.3 The Tender Fees is Non-refundable under Normal Circumstances. However,
if purchaser Company decides to scrap/cancel the Tender, by one or
another reason, in which Bidders are not responsible for cancellation/scarp
of Tender fee without GST amount may be refunded to bidder(s), at sole
discretion of the Purchaser Company
6 EARNEST MONEY DEPOSIT (EMD)
6.1The EMD payable, between the dates mentioned in Table no 1, by cash if total
amount of EMD is less than Rs 10,000/- or by Demand Draft (DD) or Banker’s
Cheque, if the said amount is more than Rs 10,000/-, in favour of the Paschim
Gujarat Vij Company Limited payable at SAVARKUNDLA on any Nationalized
/Scheduled banks or by Bank guarantee from any Nationalized/Scheduled
nationalized bank decided by Government of Gujarat time to time only. The
EMD Amount is 1 % of the Tender Estimated Cost.
6.2 The payment of Tender fees and EMD or DD or BG for tender fees & EMD should
be submitted in sealed cover & this cover shall be clearly marked “Tender fees
& EMD Cover for Tender no. __” along with the name and stamp of bidder.
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will be
returned after the award of the contract.
6.4 EMD of the successful bidder to whom a contract is awarded will be
returnedafter the said bidder pays the security deposit and signsthe contract
6.5If the successful bidder fails to submit a Security Deposit within 15days from the
date of LOA of the contract or fails to sign the contract agreement then the EMD
amount will be forfeited in favour of PGVCL without any notice or and action for
“Stop deal” will be initiated as decided by tender inviting authority
6.6 No interest will be payable by the PGVCL on the above Deposit.
6.7 EMD can be exempted as per Industries & Mines Department, GoG New Purchase
Policy Resolution No. SPO/1095/2636(97)/CH dated 23.09.1997 for Small and
Micro Scale Industries.
6.8 In cases, where EMD need not to be paid, valid exemption Certificates duly
notarized has to be produced/attached in place of EMD documents as per the
Tender Terms and Conditions.
6.9 The Micro and Small Scale Industrial (manufacturing) Units registered under
Small Scale Industries of Gujarat State and holding subsequent registration with
NSIC/DGS&D, Registration Certificates for the item under Tender will be eligible
for exemption from payment of EMD on submission of attested copies of their
SSI (SSI/ MSME Part-II) & NSIC/DGS&D Registration Certificates and Udhyog
Adhar Certificate/Memorandum in EMD Cover. The Certificates should indicate
the manufacture/service/works of items/work offered. This benefit of
exemption will not be admissible if they take part in the tender indirectly either
through their dealers, agents, distributors or other intermediates.
6.10 Tenders submitted without Earnest Money Deposit by the firms, who are not
eligible for any exemption, will be rejected without entering in to further
correspondence in this regard and no reference will also be made.
Sign & Stamp of the Bidder
7 In case of On line Tenders
7.1 Technical & Commercial Bid cover:
7.1.1 Following documents are mandatory and to be in submitted through
Online Only along with the name and stamp of bidder
1 Attested Copy of successful work Completion certificate, as mentioned
on page no 5 point no 2.11 of this document.
2 Attested copy of Memorandum of Association or partnership deed.
3 Attested copy of document showing P.F. Number obtained by thebidder.
4 Attested copy of power of attorney if any for signing the bid documents.
5 Attested copy of latest solvency certificate issued by Nationalized or
scheduled bank.
6 Attested Copy of registration Number under Shop and Estt. Act (If as case
may be applicable)
7 Copy of PF Code Number allotted by concerned PF Authority
8 Copy of Labour License (If as case may be applicable)
9 Copy of Registration under ESIC (If as case may be applicable)
10 All Annexuresof this tender documents , duly signed bythe bidder,in
chronological order only
11 Certificate – A
12 Copy of Tender Document duly signed and stamped on each page.
13 Type test certificates for Cable Box, Straight through Joints(In Case of
UG Work Involved).
14 The contractor shall have a separate provident fund code of RPFC and
the Contractor who do not possess separate P.F. Code shall not be
considered for acceptance of tender.
15 Contractor has to submit such certificate showing separate P.F. Code
along with tender.
16 List of available safety gadgets, as per annexure XI, with the bidder.
17 Copy of documents mentioned in Section 1, Clause No. no 2.2 of this
7.2 Commercial / Price Bid:
7.2.1 The bidder must clearly quote their rates in Schedule – B of this tender,
in percentage above than, below than or equal to, the tender rate in
figure as well as in words. The bidder should specify whether the quoted
rates are with or without prevailing taxes, if applicable, in force at that
time, The bidder must work out the total price of their tender offered
accordingly and the total amount should be clearly written in words &
accordingly and the total amount should be clearly written in words &
figure, in case of any discrepancy whatever written in words shall
prevail. Company shall at liberty to decide the matter as it deem fit.
7.2.2 In case of non SOR rate, Item wise rate should be mentioned and item
wiserate will be consider for the lowest party.
Sign & Stamp of the Bidder
7.2.3 Further bidders, for “On line tenders”, are requested to submit price
– bid on-line only and not to submit the price bid in physical form.
This is mandatory. If price bid is submitted in physical form, same will
not be opened and only on-line submitted price bid will be considered
for evaluation. In On Line price Bid, GST is to be mentioned in
separate raw/Column.
PGVCL reserves the right to reject any OR all tenders without assigning any
reasons thereof.
8 In case of Off line Tenders
8.1 Technical Bid cover
8.1.1All the documents as specified in Section I Sr. no. 7.1 are mandatory and
to be in submitted through sealed cover. This cover should be clearly
marked “Technical Bid Cover for Tender no. __________” along with
the name and stamp of bidder
8.2Commercial / Price Bid cover:
8.2.1 All the documents as per Section 1 Sr.No.8.2.2&8.2.3 are mandatory
and should be submitted in sealed cover. This cover shall be clearly
marked “Commercial Bid Cover forTender no. ______” along with the
name and stamp of bidder
8.2.2 The bidder must clearly quote their rates in Schedule – B, attached with
this tender, in percentage above than, belowthan or equal to, the tender
rate in figure as well as in words. The bidder should specify whether the
quoted rates are with or without prevailing taxes, if applicable, in force
at that time, The bidder must work out the total price of their tender
offered accordingly and the total amount should be clearly written in
offered accordingly and the total amount should be clearly written in
words & figure, in case of any discrepancy whatever written in words
shall prevail. Company shall at liberty to decide the matter as it deem
8.2.3 In case of non SOR rate, Item wise rate should be mentioned and item
wise rate will be consider for the lowest party.
8.2.4 No deviation in terms & condition in Schedule-B and Technical
Specification will be entertained. All the documents related to this
Tender shall be final and binding to all the bidders. Any ignorance for
this shall not relieve the contractor from their contractual liability
arising as per Tender documents.
9. The works referred herein shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified for
the bidding. Hence bidders should ensure themselves of their credentials
before submitting their offer.
11. Superintending/Executive Engineer, PGVCL, _______________ Circle/Division
reserves the right to spread the order if required.
12. Does not anticipate change in the PGVCL ownership during the proposed period
Sign & Stamp of the Bidder
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned in
Table1,PGVCL may, for any reason, whether at its own initiative or in
response to a clarification requested by a respective bidder, modify the
bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & n-procure
website in case of on line tender,PGVCL will bear no responsibility or
liability arising out of noncompliance of the same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders and
will be given due consideration by the bidders while they submit their
bids and invariably enclose such documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for
submission and no any further communication in the matter will be
The Bidders must ensure that all the Annexures are completely filled in
their tenders and the information called for is given in totality. A set of
complete tender documents is required to be submitted duly signed and
stamped by authority competent to sign on behalf of bidder on each
page as a token of unconditional acceptance to the conditions of various
clauses of tender documents. The bidder's bid and the documents
attached there to shall be considered for forming part of the contract
14.2 For “On Line Tenders”
14.2.1 Tender Papers & Specifications may be down-loaded from Web site
https://pgvcl.nprocure.com (For view, download and on line
submission) and PGVCL web site www.pgvcl.com (For view & down load
14.2.2 The bidder has to follow instruction given in this section point no 4 to
7. Both these covers, as mentioned in this section point no 6.2, 7.11,
should be submitted in one main cover, this cover shall be clearly
marked “EMD Cover, Technical _Commercial bid covers for Tender
no. __________” along with the name of the Bidder and his address.
This main cover must be submitted physically, within time limit as
mentioned in table no 1 Sr. No. 8, by registered Post A.D. or Speed
Postonly, “NO COURIER SERVICE OR HAND DELIVERY” will be
allowed,to following address:
ExecutiveEngineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Savarkundla Division,
Address:PGVCL, Division Office, 220kv SS Compound Jesar Road,
Price bids to be submitted ON LINE only before time limit specified in
“Tender Details” Table no1 of this document.
Sign & Stamp of the Bidder
14.3 For “Off Line Tenders”
14.3.1 Tender Papers & Specifications may be down-loaded from PGVCL web
site www.pgvcl.com (For view & down load only).
14.3.2 The bidder has to follow instruction given in this section point no 4 to
All these three covers, as mentioned in this section point no 6.1, 7.11,
8.2 ,should be submitted in one main cover, this cover shall be clearly
marked “EMD Cover, Technical , Commercial bid covers for Tender
no. __________” along with the name of the Bidder and his address.
This main cover must be submitted physically, within time limit as
mentioned in table no1, by registered Post A.D. or Speed
Postonly, “NO COURIER SERVICE OR HAND DELIVERY” will be
allowed,to following address:
ExecutiveEngineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Amreli Division-1,
Address: Ground floor, power house compound, chital road, Amreli.
15.REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions,
schedules and other details called for in this specification and keep
himself fully informed about all which may, in any way, affect the work,
or cost thereof. The bidder should sign on each page of tender documents
, as mentioned in Section 1 point no. 2.15, failure to furnish the required
information or submission of tender not as per the specification will be at
the Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in
15.3 If any bidders firm or/and partner or proprietary firm anywhere in
companies (PGVCL, UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL
are under criminal investigation for any kind of fraud for public and theft
of material or/and with handlings the material and any civil and/or
criminal case pending at any stage than offer of such bidder /firm will be
out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set
out in the Table no1, shall be rejected.
15.5Any deviation found in Data/Details/Documents between online offer (e-
tendering) and physically submitted documents of bidder, offer of the
same shall be liable for rejection at the discretion of PGVCL.
15.6 The Bidders shall specifically note that any over writing or corrections or
manuscript in the bid shall be ignored and will not be considered
authentic unless same are signed with Bidder's Stamp/Seal as mentioned
in Section 1 point no.
15.7Conditional bids shall not be accepted.
Sign & Stamp of the Bidder
15.8 DELAYED AND LATE TENDERS:
No tender shall be accepted/opened, as mentioned in the Table no
in any case which are received after due date and time of the receipt
of tender irrespective of delay due to postal services of any other
reasons and company shall not assume any responsibility for late
receipt of tender. Any correspondence in the matter will not be
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language
shall be accompanied by its translation in English. Failure to comply with this
may disqualify a bid. In the event of any discrepancy in meaning, the English
language copy of all documents shall govern.
17. SIGNATURE OF BIDDER
17.1 The bid must contain the name, residence, address and place of business
of the person or persons making the bid and must be signed and sealed by
the bidder with his usual signature. The name of all persons signing should
also be typed or printed below the signature.
17.2 Bids by corporation/ company must be signed with the legal name of the
corporation/ company by the President, Managing Director or by the
Secretary or other person or persons authorized to bid on behalf of such
corporation/ company in the matter.
17.3A bid by a person who affixes to his signature the word 'President',
'Managing Director' 'Secretary', 'or other designation without disclosing his
principal will be rejected.
17.4 Satisfactory evidence of authority of the person signing on behalf of
theBidder shall be furnished with the bid.
17.5 The Bidder's name stated on the tender shall be exact legal name of the
17.6 Erasures or other changes in the bid documents shall be over the initials of
the person signing the bid.
17.7 The bidder should sign, as described above, on each page of tender
documents & then they have to submit this tender documents.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for
opening of the technical bid.
20. EVALUATION AND COMPARISION OF TENDERS
1. Generally the qualifying price bids, Bid price shall mean the bid price
quoted by each bidder in his bid for the complete scope of works including
all duties and Taxes,will be evaluated by the PGVCL to ascertain the best
and lowest evaluated bid in the interest of the PGVCL, for the complete
works covered under these specifications and documents.
Sign & Stamp of the Bidder
2. As per requirement of Company, Amt./Qty. of tender can split in more
than one bidder subject to price matching with lowest bid. In this
matter during splitting of tender Qty./Amt. in first stage proportionate
part of tender Qty./Amt. is to be allotted to L1 and L2,L3..etc. are
invited for price matching with L1. After completion of price matching
process, proportionate part of tender may issue to L2,L3….etc. Failing
in this matter rest proportionate part of tender Qty./Amt. may issue to
L1 after receiving performance from SDO
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will
prevail. If there is discrepancy between the unit price and the total price
which is obtained by multiplying the unit price and quantity, or between sub-
total and the total price, the unit or sub-total price shall prevail, and the total
price shall be corrected. In case of discrepancy between sub-total price
obtained by adding various prices in the schedule and the sub-total price
indicated for that particular schedule, the sub-total obtained by addition of
various arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of
the prices arrived at from various schedules, identified for that purposes, in
the bid proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the
successful bidder by the PGVCL.
22.2 The contract will be awarded to the best qualified and responsive
bidder offering the lowest evaluated bid in conformity with
requirements of these specifications and documents and PGVCL shall be
the sole judge in this regard and subject to the provisions of these
instructions to bidders and other terms and conditions detailed out in
these documents and specifications. A responsive bid is one which
accepts all terms and conditions of these specifications and documents
without any modifications.
22.3 PGVCL Reserves the right to award separate contract to two or more
parties in line with the terms and conditions specified in the
23. ADDITIONAL DOCUMENTS:
At the time of evaluation of tender PGVCL Savarkundla Division office may ask
bidder to submit required documents other than mentioned in section I Point
no 2.2, if required.
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this
Tender consist ________ Days. The commencement date of Order shall be Date
of issue of the Order.
Sign & Stamp of the Bidder
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
1. Name of the Bidder
2 Postal Address
4 e-mail address & URL
Type of Company
Attach Proof of Company Registration
Proprietorship/ Partnership/ Private
5 along with a copy of the Partnership
Limited/ Public Limited
Deed/ Article of Association and
Memorandum of Understanding
Name and designation of the
representative of the Bidder to whom
all reference shall be made to
expedite technical co-ordination.
7 Office Address
Stores Address where materials issued
by PGVCL will be stored
Store Documents to be submitted
10 Office Telephone/Fax no.
11 Office e-mail address
12 Permanent Account Number(PAN),
15 Labour License No.
Insurance Policy No. and for nos. of Nos. of Labours Insured in this
Labours in the name of bidder policy_______
17 Solvency Certificate No.
18 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge
and belief. If any information found to be concealed, suppressed or incorrect at later
date, our tender shall be liable to rejected and our company debarred from executing
any business with PGVCL.
Sign & Stamp of the Bidder
1.0 For Underground Cable
1. Bidder has to maintain the records of allotted Cable Drum with actual
Cable/Conductor length. Cable length must be measured before laying. Cable
joints are to be done as per requirement only and length of cable must be utilized
2. Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3. The trench excavation and filling–in shall be so executed that all walls, roads,
sewers, drains, pipes, cables, structures, places and things shall be reasonably
secured against risk of injury and shall be carried out to the satisfaction of the
authorities concerned. However, if any, damages to existing services made,
Contractor shall arrange and pay for any necessary repair, to make good the
4. When the excavation of the trenches has been accurately executed, the
contractor shall inform engineer in-charge for approval. Lying of cables shall not
be started until engineer in-charge approves the trench.
5. All the related material for laying the cable in trench i.e. Half round RCC Pipes
having _both sides smooth surfaces, 25.4 mm thick, 152.4 mm inner diameter,
1000 mm long and well cured and good quality; Sand from river bed, HDPE Pipes,
GI Pipes and sundries material if any (As per Schedule B) are to be supplied by
Bidder at his own Cost. All such material must be approved from concerned
Engineer-in-charge before utilization and it must be ISI marked where ever
6. Cable laying work must be executed as per prescribed in Schedule B. sand filling
in Trench must be done as mentioned in Schedule B. Megger test of Cable must be
taken in presence of Engineer-in-charge before laying and Bidder has to maintain
separate Records duly signed by Engineer-in-Charge for each results. After laying
the Cable in trench it is to be covered with half round pipe of RCC as prescribed
in Schedule B and approved sample. Each Half round Pipe must be marked with
“PGVCL” with solid Red Colour on Top.
7. Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay
Cable in the stretch on small pulleys kept in the Trench so that it can be
prevented from any scratches on Cable. Drum must be fixed on Drum Machine
while stretching and to be kept on one end of Trench for smooth laying.
8. After completion of laying as above, remaining trench must be filled with sand.
Leveling with Road is to be done after complete sand filling. No any stones or any
other debris are to be utilized in filling of Trench. The contractor shall dispose of
surplus material at his own cost.
9. A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall also
be laid. The warning tape shall be printed in RED letter (IN ENGLISH AS WELL AS
GUJARATI) as “CAUTION: 11000 VOLTS PGVCL CABLE” and to be placed at about
300 mm To 450 mm depth from ground level along the route of cable.
Sign & Stamp of the Bidder
10. Trench route is to be made as per instructions of concerned Engineer-in-Charge
and then laying of cable in this trench accordingly.
11. Cable Laying with Mechanical Boring across the Road without disturbing the
asphalt is to be done instructions of concerned Engineer-in-Charge with prior
approval and work is to be executed as per Specifications in Schedule B only.
12. For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab Type
test certificate not older than Seven years and as per relevant IS 13573:2011 with
latest amendment if any along with sample before installation of cable kit at
concern Division office. GTP is to be submitted with Technical Bid.
13. If any Hard Rock area is encountered during the digging of Trench, Bidder must
have all the modernized equipment i.e. Erath Cracker JCB etc. to execute the
required Trench. Such area must be certified by a formation of Committee at
Division Level headed by Executive Engineer and to be executed in presence of
Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14. Route Markers are to be installed at every 100 Meters length as per specifications
in Schedule B The marker should incorporate the following relevant information:
1) The name of the Company – PGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and
requirements) between two markers. It shall also be put at bends, curves, road
crossing, Cable Joints etc. of cable route as per requirement over and above
specified distance.
15. Empty Drums are to be credited at PGVCL respective stores at Bidders cost and
Risk after successful completion and Execution of work. Otherwise Recovery will
be proposed as per Section V Clause No.
16. After Laying of Cable in Trench and filling of all type Cable Box and Joints, testing
must be carried out with help of Voltage Surge Testing Kit as per IE Act by
applying 22 KV for continuous Five Minutes and Cable must hold the satisfactory
Results. Bidder must have such testing facility. Following Pre commissioned Tests
are also to be carried out.
a) Insulation Resistance of each cable drum length after laying and before
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltage of 10 KV
DC for one minute between each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the
e) Continuity & Phase confirmation
Sign & Stamp of the Bidder
17. During the Execution if any deficit found in allotted material OR in case of any
theft of PGVCL allotted material, then PGVCL will recover the cost of such
material from Bidder as per the prevailing Market Rates.
18. No any Advance Payment will be made after issuing of Order.
19. PGVCL will be not responsible and liable for the material supplied by the Bidder.
20. During Execution of work for Trench and Cable Laying authorized representative
of Bidder who is in knowledge of Engineer-in-Charge must remain present.
21. Bidder must have to submit the List of all related Equipment and Testing facility
necessary for the Tendered work while quoting the Bid.
22. PGVCL reserves the right to change/modify/alter/addition in condition in case of
any dispute and holds the power to decide the final verdict.
23. GST and cess as applicable as per prevailing rates are applicable to Bidder for this
24. In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
25. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26. Necessary shutdown for connection/jumper of UG cable with existing network will
be provided as per availability or convenience of the PGVCL which shall be
acceptable to the contractor & contractor shall try to complete the work in
27. All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at
Contractor’s cost.
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and
PGVCL/Tech/UG cable/02/14-15 are attached in Section XI.
2.0 For Overhead Line
1. Bidder has to maintain the records of allotted Conductor Drum with actual
Conductor length. Conductor length must be measured before Stringing.
2. E/o Poles must be according to RE Standards. Pole Pit, stringing installation of
Fabrication must be done as per standards and esthetically.
3. Earthing of Poles and Transformers must be as per Drawings and RE Standards.
The Coal and Salt composition must be followed as per rules. The Earth Pit must
be kept at a distance mentioned in Standard form the Pole. Earth Pit must be as
4. Concreting of Poles/Guys are to be carried out as per site situation and as per
instructions of Engineer –In-Charge.
5. Construction of Transformer Structure must be as per standard with all required
accessories like LA, Box and Fuse etc.
6. Delta Type Three Earthing are compulsory for each Transformer Centre.
Sign & Stamp of the Bidder
7. All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
8. Wherever required, Guarding as per standard must be done.
9. Pole Concreting: Whenever concreting of poles (PSC/RSJ) required, subdivision
officers has to submit the proposal to the division office with all justification
before commencement of work. Committee of Executive Engineer, DE Tech of
Division office has to verify the submitted proposal and decide whether
concreting is required or not. After the approval of committee work of concreting
should be process as per specification attached herewith.
10. Bidder must have records of each work carried out with every material inventory
and account thereof issued to him.
11. Bidder must have the well-drawn sketch of each work and to be submitted with
Inventory sheet within 15 Days of work completion.
12. All the fabricated material and Girder Poles must be painted with Coats of
Silver Oxide and without this work, work completion will not be accepted.
13. Pole Numbering must be completed within week time as per Engineer-in-Charge
14. Bidder must have proper pole accounting for the work carried out by him. He
must have the location details from where the poles are lifted and where these
poles are utilized for each work. A separate Register is to be maintained by him
and details are required to be submitted with Inventory and Sketch submission.
15. Necessary shutdown for connection/jumper of newly erected line with existing
network will be provided as per availability or convenience of the PGVCL which
shall be acceptable to the contractor & contractor shall try to complete the
work in minimum time.
16. Successful Bidder must have ensured for that the safety Gadgets are issued to his
Labour, by him, and required regulations of Safety will be followed while
carrying out the line erection work.
17. The Work for the erection of of Poles, Guys, Earthing, Transformer and
Concreting, Stringing and Guarding must be done as per attached Specifications
18. The material which is dismantled from site during the execution of work must be
credited to respective Divisional stores immediately after completion of work
with complete inventory and measurement details and length to weigh
conversion calculations.
19. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action
will be initiated against the Contractor
20. In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
Sign & Stamp of the Bidder
General Instructions tothe successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful
Bidders indicating the quantity allocated to them and the security deposit amount
to be deposited by them with PGVCL. Short listed Bidders will be required to
deposit the requisite security deposit within 15 days from issuance of LOI/LOA.
2. Security Deposit:
2.1 Security deposit will be accepted in Cash if the amount is less than Rs.
10000.00 and, if the amount is more than Rs. 10000.00 thenwill be payable by
Demand Draft (DD) OR Banker’s Cheque OR Bank Guarantee (BG)from
Nationalized / Scheduled Banks as per Govt. GR No. EMD / 10 / 2014 / 570 /
DMO dated 01.04.15 will be acceptable. DD should be drawn on any
Nationalized /Scheduled banks in favour of Paschim Gujarat Vij Company Ltd.
payable at Amreli or by Bank guarantee from any Nationalized/Scheduled
nationalized bank decided by Government of Gujarat time to time
only.Cheque will not be acceptable
2.2 The successful Bidders will be required to deposit the requisite security
deposit within 15 days from the date of issuance of LOA of an amount
equivalent to 5 % of the value of the work to be allotted to him and as
mentioned in LOA.
2.3 In case, if the Bank Guarantee is furnished / submitted, it should have a clear
one time validity till the completion of awarded work of this work order.Bank
Guarantee for interim period will not be allowed. Security Deposit shall be
suitably extended time to time as per requirement.
2.4 If by any reasons the completion period of this work order is extended, then
supplier should undertake to renew the Bank Guarantee at least one month
before the expiry of the validity failing which PGVCL will be at liberty to
encase the same. CORPORATE GUARANTEES NOT ALLOWED.
2.5 No interest will be paid on the Security Deposit.
2.6 In the event of awarding the order of additional quantity, the successful
Bidders will be required to deposit additional Security Deposit on prorate
basis within two weeks of the issuance of LOA for the additional order
2.7 In the event of failure to carry out work offered by successful Bidders and as
accepted by them while receiving the order within given time period, will
lead to forfeiture of the Security Deposit up to 100% and will lead to
disqualification of the bidder to transaction business with PGVCL for at least
TWO years or the time duration as may be decided by the Managing Director,
2.8 Security deposit will be returned on after completion of awarded work.
2.9 If the successful Bidders fails to pay security deposit within given time limit
then the letter of intent will stand cancelled. EMD amount will be forfeited in
favour of PGVCL without any notice or and action for “Stop deal” will be
initiated as decided by tender inviting authority.
Sign & Stamp of the Bidder
3. SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the
receipt of LOI/LOA, on Stamp Paper of Rs 100/-as per Company’s rules in the
prescribed form of the P.G.V.C.L. attached with this Tender. The cost Rs.100.00
of the Stamp Paper will have to be borne by the successful Bidders.
4. For the Tendered work, other than turnkey work,entire material will be issued by
PGVCL. Any other related material required to carry out work mentioned in
Schedule A is to be brought by Bidder. No any extra cost will be paid towards such
5. Successful Bidder has to follow all the rules and Regulations of Work Safety.
Required tools and Tackles for Safety are to be arranged by Bidder only.
6. Bidder is responsible to any type theft/damages of Company’s material and also
responsible to any type damages to any property and any kind fatal/non-fatal
accidents to anybody during the execution of work. Insurance of all workers is
compulsory, who are involved in Execution of Tendered work. There will be no
any financial liabilities of PGVCL for damage charges paid such way.Copy of valid
Labour Insurance Policy in the name of bidder is to be submitted with Tender
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8. Work must be completed in in specified Schedule narrated in the Tender. If
concerned Engineer not satisfied with quality of work, no any Time limit
extension will be granted and Penalty with applicable GST with cess as
applicableand other taxes in force at that timewill be levied on delayed portion
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of
LOA. Security Deposit (In form of DD/BG) and Insurance Policy is also to be
submitted with Agreement within this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a
month after completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 100/- Stamp Paper and
cost of stamp paper is to be borne by Bidder. Solvency Certificate is to be
submitted as per PGVCL rules and Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthing work,
and work to be done as per PGVCL rules and RE specification for this work.
14. Work is to be carried out in presence of PGVCL authorized representative and to
be duly certified also.
15. No idle Labour charges will be paid by the PGVCL in case such occasion of idle
Labour arises, due to want of any materials or any othersituations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
17. Bidder has to submit the Performance Certificatesunder whom the similar kind
of Tender work has been executed. Such Certificates must not older than
Years from Date of submission of the Bid. Such Certificate must be duly signed
by Cadre Executive Engineers and above only.
Sign & Stamp of the Bidder
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS:
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in
force in India, including any such laws passed or made or coming into force during
the period of the Contract.
2. Wages to be paid at the time of payment etc.by the contractor
2.1The successful bidder shall pay minimum prevailing rates per day, as may be
specified here after, or rates fixed under the Minimum Wages Act, whichever is
higher. The wages of every contract labour employed by him under this contract
shall be paid by him before the expiry of 7th day of the month irrespective of
which the wages are payable i.e. wages of a last month have to be paid by him in
the first week of the next month). The contractor shall have to make wages to
his workers through bank only. The agency shall have to submit the copy of a
letter given to the Bank advising for crediting wages in individual account of the
workmen along with photocopy of the cheque showing total payment to be made
to all such workmen whose accounts are operated in that branch. (If there is
more than one Branch, the agency will have to submit separately for each
2.2 The successful bidder shall give his telephone number and address to the
company so that in case of labour trouble etc. the contractor can be contacted.
The contractor shall arrange to have his office outside the factory premises and
the contractor shall keep himself present through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to
5. Identity cards as prescribed under the factories Act/Shops and establishment Act
(As the case may be applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract
labour (regulation and abolition) Act for employing necessary manpower required
by them. In absence of such license, the contract shall be liable to be terminated
without assigning any reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and
keep the PGVCL indemnified in respect thereof. Some of the major liabilities
under various labour and industrial laws which the Contractor shall comply with
below conditions.
7.1 Payment of contribution by way of employer's contribution towards
provident fund, administrative charges etc. at the rates made applicable
from time to time by the Government of India / Government of Gujarat or
other statutory authority.
7.2 Payment of deposit in respect of each contract labour at the prevailing rate
with the office of the commissioner of labour as per the Contract Labour
(Regulation and abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and
abolition) Act rules framed there under depending upon the number of
Sign & Stamp of the Bidder
7.4 Paid leave facility and wages as per the provision of the Factories Act at the
rate of one day for every 20 days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as per
industrial Dispute Act. Any payment to the Contractor's employee arising out of
any claim of disputes under the Industrial Dispute Act 1947 or any other labour
7.6 Payment of compensation in case of accidental death or injury as per Employee's
compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower
deployed or any government Contractor under any of the provisions of the
Minimum wages act, Payments of wages Act, Employee's compensation Act,
Contract Labour regulation abolition Act, Employee provident fund or any other
law due to act of omission of the Contractor, the PGVCL may make such
payment and shall recover the same from the successful bidder's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such
amount as may be necessary to cause of observe, or for non-observance of the
provisions stipulated in the notifications/byelaws/Acts/Rules/Regulations/
including amendments. If any, on the part of the Contractor, the PGVCL shall
have the right to deduct any money due to the successful bidder under this
contract or any other contract with the PGVCL including his amount of security
deposit for adjusting the payment. The PGVCL shall also have right to recover
from the Contractor any sum required or estimated to be required for making
good the loss or damage suffered by the PGVCL.
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation
fund and under the liabilities insurance. The Contractor will arrange insurance
policies for arranging payment to his staff injured / met with accident (Fatal /
nonfatal) on duty of sufficient amount as per Labour laws. In case of any such
happening Contractor will be liable for any other payment to workers / staff
engaged as per existing rules. Contractor will not make any such payment to the
Contractor's staff or any compensation etc. during the pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and
conditions of service ) Act
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
Sign & Stamp of the Bidder
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition
to other liabilities prescribed under the various labour laws, in force
from time to time, from statutory authorities like GOI-GOG, which the
Contractor shall have to comply with.
10. It should be ensured that before commencing the said work, the successful
bidder should submit the details of their labourer such as a full name, address
and age with proof and subsequently changes of workers details are submitted
11. The successful bidder shall employ adequate number of an experienced staff at
site for daily supervision and for maintenance of various register and records
required under the law and contract. No payment for supervision shall be
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act,
Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or
regulations that have to be observed by the contractor for carrying out the
13. The contract will be governed by the company as per works terms & conditions
of the company.
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No
female worker shall be employed in the night shift between 07.00 p.m. and
06.00 a.m. next day.
14.2 Contractor shall maintain a valid labour license under the Contract Labour
(Regulation and abolition) Act for employing necessary manpower required by
him. In the absence of such a license, the contract shall be liable to be
terminated without assigning any reason thereof. Contractor should also
employ qualified and experiences persons as per requirement of Electricity Act
and rules for carrying out supply and erection work under this contract.
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any
Government agency under any of the provisions of the Minimum Wages Act,
Payment of Wages Act, Employee Compensation Act, Contract Labour
Regulation Abolition Act, Employee Provident Fund or any other law due to act
of omission of the Contractor, PGVCL may make such payment and shall
recover the same from the Contractor’s bills.
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement
regarding deduction against employees Provident Fund and Family Pension
Scheme in respect of each concerned employee The contractor's contribution
and the workers’ contribution towards Provident Fund and Family Pension
Scheme shall be done at the rate made applicable by the Government from
time to time and deposited by the contractor with Regional Provident Fund
Commissioner, Rajkot.
Sign & Stamp of the Bidder
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees
who are members of the Provident Fund as the contribution to the Deposit
Linked Insurance Scheme with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be
deposited by the Contractor with Regional Provident Fund Commissioner,
Rajkot at the rates applicable.
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the
Contract Labour shall be provided by the Contractor to his, workers. He shall
maintain Leave Records, Leave Cards for individual labourer which shall be duly
verified, approved and certified by the Authorized Officer of PGVCL.
Remuneration for such leave period shall be fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the
performance of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as
per rates fixed under the Minimum Wages Act. The wages of every Contract
Labour employed by him under this contract shall also be paid by him before
the expiry of 7th day from the last day of the month in respect of which the
wages are payable (i.e. wages of a month have to be paid by him in the first
week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the
Contractor shall be punishable to the extent of Rs. 100/- for each day of
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL,
so that, in case of labour trouble etc. the Contractor can be contacted. The
Contractor shall arrange to have his office within working area and the
contractor keep himself present throughout the working hours.
20.4 The separate P.F. code issued from RPFC is required to be taken by the
contractor and if it is not taken, offer of the firm will not be considered. The
attested documentary evidence to be submitted along with the offer.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be
ensured that all the contract labourers are covered under the provident fund
scheme and employees’ pension scheme and their contributions are remitted
regularly to the concerned RPFC. The photo copies of the Chelan in this regard
should be collected from the concerned contractor and kept in the file of the
concern contractor.
Sign & Stamp of the Bidder
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed
out in Clauses titled Insurance Bidder’s attention is specifically invited to these
clauses. Bid price shall include all the costs in fulfilling all the insurance
liabilities under the Contract.
28.1 The Contractor at his cost shall arrange, secure and maintain all
insurance as may be pertinent to the Works and obligatory in terms of law to
protect his interest and interests of the PGVCL against all perils detailed herein.
The form and the limit of such insurance as defined herein together with the
under-writer in each case shall be acceptable to the PGVCL. However,
irrespective of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of
Contractor alone. The Contractor’s failure in this regard shall not relieve him of
any of his contractual responsibilities and obligations. The insurance covers to
be taken by the Contractor shall be in the name of the Contractor. The
Contractor shall, however, be authorized to deal directly with Insurance
Company or Companies and shall be responsible in regard to maintenance of all
insurance covers. Further the insurance should be in freely convertible currency.
23. Any loss or damage to the equipment during handling, transportation,
storage, erection, putting in to satisfactory operation and all activities to be
performed till the successful completion of commissioning of the equipment
shall be to the account of the Contractor. The Contractor shall be
responsible for preference of all claims and make good the damages or loss
by way of repairs and/or replacement of the equipment, damaged or lost.
The transfer of title shall not in any way relieve the Contractor of the above
responsibilities during the period of Contract. The Contractor shall provide
the PGVCL with copy of all insurance policies and documents taken out by
him in pursuance of the Contract. Such copies of documents shall be
submitted to the PGVCL immediately after such insurance coverage. The
Contractor shall also inform the PGVCL in writing at least sixty (60) days in
advance regarding the expiry/cancellation and/or change in any of such
documents and ensure revalidation, renewal etc., as may be necessary well in
24. The perils required to be covered under the insurance shall include, but not be
limited to fire and allied risks, miscellaneous accidents (erection risks) workman
compensation risks, loss or damage in transit, theft, pilferage, earth quake, riot
and strikes and malicious damages, civil commotion, weather conditions,
accidents of all kinds, etc. The scope of such insurance shall be adequate to
cover the replacement/reinstatement cost of the equipment for all risks up to
and including delivery of goods and other costs till the equipment is delivered at
Site. The insurance policies to be taken should be on replacement value basis
and/or incorporating escalation clause. Notwithstanding the extent of insurance
cover and the amount of claim available from the underwriters, the Contractor
shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project
Sign & Stamp of the Bidder
25. All costs on account of insurance liabilities covered under the Contract will be
on Contractor’s account and will be included in Contract Price, However, the
PGVCL may from time to time, during the pendency of the Contract, ask the
Contractor in writing to limit the insurance coverage, risks and in such a case,
the parties to the Contract will agree for a mutual settlement, for reduction in
Contract price to the extent of reduced premium amount. The Contractor,
while arranging the insurance shall ensure to obtain all discounts on premium
which may be available for higher volume or for reason of financing
arrangement of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements
for the portion of the works to be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except in
special case, if any.
28. The successful bidder has to engage required strength of skilled persons for
execution of work and proper supervisor to avoid complication and unnecessary
delay to complete work timely. The successful bidder will be solely responsible
for labour claims arising out of the labour employed for this job.
29. The successful bidder should furnish details of past experience of such job of
similar nature completed by him satisfactorily within the time limit in PGVCL
will be preferable.
30. The successful bidder will be abide by and fulfil all the terms and provisions of
the “Tender and contract” for works as applicable and in case of any default
there to the PGVCL Company shall forfeit the S.D. or any other action as may
be decided by Superintending/Executive Engineer _____________
Circle/Division.
31. The successful bidder will certify that he has complied with the provisions
of Industrial & Labour Laws including PF Act, ESI Act etc. as may be
applicable. Copy of challans of PF related to be submitted along with bill.
32. The successful bidder will governed by the PGVCL general conditions of works
contract. The Booklet will be available in the concerned office in any working
days. In the event of placing order, the successful bidder will be bound to the
terms & conditions of the booklet. All the usual terms and conditions of the
Company though the same might have not been mentioned in this specification
or contractor booklet will applicable to this contract, and the decision of the
Executive Engineer, _________ Division shall be binding on the Contractor.
Sign & Stamp of the Bidder
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on
a given taxable goods and/or services. The amount and % of GST and Cess as
applicable should clearly be indicated separately. (GST/Cess means all
applicable Tax/Cess under GST Laws.
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue)
Act, CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary
3. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the
rate of GST and Cess is not mentioned clearly unless the bidder has opted for
Composition Scheme under GST Act, which should be clearly indicated in the price
bid. COMPANY may at its discretion consider such offer with presumption of highest
applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of
4. If the Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the
event of withdrawal/cessation of the Supplier from Composition scheme during the
tenure of the contract, the rate mentioned in the price bid shall be final and any
additional GST will have to be borne by the tenderer. In no case additional amount
towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor
has opted for Composition Scheme under GST.
5. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in
acceptance of tender only and any deviation in the same shall not be accepted.
Further, any additional liability of GST (later on due to wrong mentioning of GST
rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in the
invoice shall be borne by the Supplier/Contractor. However, any refund received by
the supplier / contractor on account of GST charged from the company; such
refund shall have to be passed on to the company, along with interest if any. Such
refund along with interest needs to be passed on suo-moto by the contractor.
6. Further, the Company has a right to recover the amount of GST along with penal
interest at the rate of 15% per annum if GST charged is not paid/short paid to the
government or fail to upload the details or uploads inaccurate particulars on GSTIN
portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the
contract, the provision of GUVNL’s statutory variation clause shall apply.
Sign & Stamp of the Bidder
7. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due
to inclusion of any other additional item of their inputs / input services under the
ambit of the Input Tax Credit provisions under the GST Act, subsequent to the date
of submission of the offer, the same should be passed on to COMPANY and you
should inform such changes to COMPANY from time to time.PGVCL’s GST
Registration No.is 24AADCP1453C1ZZ
8. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully
assessed against the PGVCL or the Contractor in pursuance of the Contract. In
addition the Contractor shall be responsible for payment of all Indian duties, levies
and taxes lawfully assessed against the Contractor for his personal income &
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in
accordance with the provision of Income-Tax Laws and to that effect a certificate
will be issued to the contractor, however added as contractor has to submit
separate invoice for supply parts item as well as works part item separately,
otherwise TDS will be deducted on entire invoice value.”
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to
pay the same to the respective Govt. Department. Tax will be deducted as per
applicable statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST
TDS, welfare cess or any other taxes applicable time to time etc. All other
statutory liabilities towards this contract will be on your part.
11. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place
within the contract period will not be considered except GST. No statutory
variation will be given for this work except GST. However, if any decrease
takes place within/after the contractual delivery date, the advantage will have
to be passed on to PGVCL.
12. The Contractor shall be fully responsible for deducting the P.F. of the
employees/labour Working under him as per statutory regulations and
depositing the same with the concerned authorities.
13. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all
losses, expenses or claims arising in connection with the death of or injury to
any person employed of the Contractor or his subcontractors for the purposes
Sign & Stamp of the Bidder
GENERAL TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the
papers, drawings, etc. attached & if has any doubt as to the meaning of any
portion of any condition / specification, etc. he shall before signing the
contract submit the particulars thereof to PGVCL in order that such doubts are
1.2 The successful bidder shall not, without the consent in writing of PGVCL,
transfer, assign or sublet the work under this contract or any substantial part
thereof to any other party.
1.3 The execution of work should be commenced as per the instruction of the
Engineer In Charge as per actual requirement and should be completed within
the time limit thereafter.
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop
the work altogether or reduce or cut it down. If the work is stopped
altogether, the Bidder shall only be paid for work done. If the work is cut down
the Bidder shall not be paid for the work as so cut down, but in neither case
shall be paid any compensation what so ever for the loss or profit which he
might have made if he had been allowed to complete all the work included in
1.5 Notices, Statements and other communications sent by PGVCL through
registered post or telegram or telex or any other way of communication to the
successful bidder at his specified address shall be deemed to have been
delivered to the successful Bidder. The work shall be carried out by the
successful bidder with prior approval of PGVCL. Work carried out without
PGVCL’s approval shall not be accepted and the PGVCL shall have right to
reject it and to recover the cost from the successful bidder. He will be liable
against all losses, expenses or claims arising in connection with the death of or
injury to any person employed by the successful bidder or his subcontractors
for the purposes of the Works.
1.6 The successful bidder shall be responsible for any damage to the equipment
during transit due to improper or inadequate packing, handling, loading and
unloading. The cases containing easily damageable material shall be very
carefully handled. Adequate protection must be provided for outdoor storage
at site in tropical humid climate, wherever necessary. The successful bidder
without any extra cost shall supply any material found short inside intact store
1.7 If the successful bidder neglects to execute the work with due diligence and
expedition or refuses or neglect to comply with any reasonable orders within
two days’ notice given in writing to the successful bidder and if he fails to
comply with the notice, then in such a case PGVCL shall be at liberty to get the
work or any part of it, executed through any other agency/Bidder in the
manner and on the terms it thinks proper. If the cost of executing the work as
aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to
make good the deficiency, PGVCL may recover it from the Bidder in any lawful
Sign & Stamp of the Bidder
1.8 PGVCL shall have at all reasonable time access to the works being carried out
by the Bidder under this contract and stores where material issued by PGVCL is
stored. All the works shall be carried out by the Bidder to the satisfaction of
1.9 The quantities mentioned in the accompanying schedule B are only
approximate same may decrease or increase. The PGVCL reserves the right for
revising or omitting any of the quantities. The actual work executed by the
successful bidder will be calculated at the rate given in the contract schedule
of the rates binding to the successful bidder.
1.10 No higher rate or revised rate will be application for the work, if work is held-
up/closed due to whatever so reasons.
1.11 Price shall not be changed subject to any upward/downward revision on any
account whatsoever through the period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be
applicable to this work contract.
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer In
Charge and for execution of the works.
1.14 Either successful bidder or successful bidder’s authorized person should contact
our Engineer In Charge as well as Division Office, ____________ daily for the
availability of materials required for this work, failing to which this work order
shall be terminated without giving any notice.
1.15 The successful bidder has to maintain site register covering all aspects of
material received/utilized/dismantled for day to day work and has to obtain
signature of Engineer in Charge.
1.16 In case of any dispute doubt, the decision of Executive Engineer AmreliDivision-
1 shall be unchallengeable and final, which will be binding to the contractor.
1.17 Security Deposit (without any Interest) will be refunded after completion of
guaranteed period if any.
1.18 All legal complication of disputes is subject to Amreli jurisdiction only.
1.19 A fresh and valid solvency certificate to the extent of 20% of the ordered
value will have to be produced by the contractor and party has to submit
attested copy of solvency certificate to the company before commencing of
1.20 The successful bidder will be solely responsible for any accident/damage either
to equipment or any human being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the
1.22 The successful bidder will have to make his own arrangement for required all
kinds of tools, tackles, required for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s bill.
The assessment of which will be done by Engineer In Charge in consultation
with division office, and his sole discretion and his decision shall be binding to
the successful bidder and shall be considered as final and unchallengeable.
Sign & Stamp of the Bidder
1.24 The successful bidder will have to give indemnity bond to PGVCL against any
possible claim of compensation for damage to Contractor’s equipment or staff
or any of third parties during the execution of work as per attached format.
1.25 The successful bidder will have to complete entire work, as mentioned in
Schedule-B of contract awarded to him, as per directive and instruction of
Engineer In Charge. If he fails to do so entire work will be carried out at the risk
and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the clock,
exclusively for execution of work.
1.27 Specification in any items mentioned in tender are subject to change without
any prior notice and binding to the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules
of all relevant Govt. Authorities from the bill.
1.29 If the work is required to be carried out during fix outage then the successful
bidder has to deploy adequate man power, material, tools etc. well in advance
and has to complete the entire work during this specific outage period only,
failing to which Company shall be at liable to deduct the amount of revenue
loss due to prolong outage.
1.30 The tender include all minor accessories and items of work which may not have
been specifically mentioned in the specification / Schedule etc. but are
essential for completion of work. The contractor will not be eligible for any
extra payment in respect of such minor accessories and item of work.
1.31 The successful bidder shall not refuse to execute the work order at any time
and it will be his sole responsibility to execute and complete this work as per
the instruction of Engineer In Charge.
1.32 For shortage of any materials issued by the PGVCL for the work, recovery shall
be made from you, on the basis of prices of the materials (prevailing on the
date of settlement of materials account) plus 15% supervision charges.
1.33 The successful bidder has to carry out all the works in accordance with revised
and latest provision under I.E. Rule Act made there under and as per instruction
of Engineer In Charge.
1.34 All the materials issued by PGVCL shall be transported to the work site on same
day and to be preserved in safe custody failing to which PGVCL shall initiate
Police action. Similarly as per instruction of Engineer In Charge, you have to
credit the material at PGVCL store without any loss of time failing to which
PGVCL shall initiate Police action.
1.35 Any delay causing extension of outages shall be successful bidder’s
responsibility and appropriate amount (in term of Rupees) as decided by
Executive Engineer, Amreli Division-1shall be recovered from successful
bidder’s bill as a penalty with applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the
1.37 The contractor has to follow all labour laws, safety rules and regulations. The
PGVCL does not take any responsibility in case of accident or injury to the
workers. The safety, security of men, materials and equipment shall be sole
responsibility of the contractor.
Sign & Stamp of the Bidder
1.38 The compliances of all Central / State Govt. Rules, safety and insurance rules
etc. and that of local body is a must condition for the successful bidder.
1.39 The successful bidder shall specifically note that PGVCL will not pay any extra
amount towards any type of claim except for the description indicated in
Schedule –A. The party has to carry out all other additional required activities /
work as directed by Engineer In Charge which is not mentioned in Schedule but
required to be completed as per the site condition and for this work no extra
payment shall be made by PGVCL.
1.40 The contractor should employ as a Supervisor with sufficient qualification and
experience who could supervise the execution of work throughout. He should
always be present on the site.
1.41 The contractor shall be responsible for breakages, losses and a theft of
material during transit or erection after the materials issued from the stores
till the completion of work and is taken over by the PGVCL.
1.42 As regard damages to the materials, equipment, successful bidder himself will
be responsible. If there is any compensation to be paid in respect of
“WORKMAN” Compensation Act or any other statutory provisions, the same will
be paid by contractor directly. If he thinks fit, he may take necessary
insurance covering at his cost.
1.43 The successful bidder shall co-operate with the PGVCL for taking measurement
etc. as early as possible and he shall fulfil the entire requirement which is
necessary to finalize the accounts.
1.44 The competent authority can delete any item in schedule of the tender if he
feels that the rate quoted by the contractor for the item is abnormally high
when compared to the estimated rates.
1.45 The successful bidder shall not refuse to execute this work order at any time
and it will be his sole responsibility to execute and complete this work as per
the instruction of Engineer In Charge.
1.46 The erection work should be carried out according to the specification as per
instructions and programmed laid out by the Engineer in charge. Contractor
has to ensure safe shifting and erection of all accessories/equipment as per
standard norms.
1.47 The Bidder shall not display the photograph of the work and shall not take
advantage through publicity of the work without written permission of PGVCL.
1.48 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s
representative shall not relieve the successful bidder from full responsibility of
completing the work confirming to the requirement of this contract.
1.49 Under the Contract, the Contractor shall be responsible for loss or damage to
the line and Electrical Equipment until the successful completion as defined
elsewhere in the Bid document.
1.50 All demurrage, wharf age and other expenses incurred due to delayed
clearance of the material or any other reason shall be to the account of the
Sign & Stamp of the Bidder
1.51 The law applicable to the contract shall be the laws in force in India. The
courts of Rajkot shall have exclusive jurisdiction in all matters arising under the
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted
firm price basis (Inclusive of all Taxes) and lowest evaluated bid in the interest of
the PGVCL, for the complete works covered under these specifications and
If more than one party is to be considered for placement of order, they willhave to
match their end cost with end cost of L-1 technically acceptable bidder. PGVCL
(tender Inviting Authority) may go to the L-2, L-3 and so on depending upon the
requirement. If PGVCL (tender Inviting Authority) feels that there is lack of serious
competition or any other reasons, PGVCL (tender Inviting Authority) may negotiate
with the L-1 party. PGVCL’s (tender Inviting Authority) decision shall be final and
binding on all the parties.
3 QUANTITY DISTRIBUTION
3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular
who have confirmed /fulfilled pre eligibility criteria, as mentioned in Section
1 Sr. No. 2 , will only be considered for price evaluation. PGVCL will not
consider the, price bid of any contractor who does not confirm / fulfil the
eligibility criteria as mentioned in Section 1 Sr. No
3.1.1 While placing the order, the quantity distribution to each new
contractors / new firms shall be restricted up to 30 % of the tender
amount/Qty. for all such new bidders provided the price of New
contractor is lower than the regular/experienced contractor. New
contractor / new firm will be considered as a regular contractor only
after full filing experience criteria as mentioned in Bidders qualifying
criteria as per point no. 2 in Section I.
3.1.2 The new contractor will be asked to match the L-1 prices of the new
contractor only and the Regular contractor has to match the L-1 price
of the Regular/experienced contractor only.
But if there are no Regular contractor OR if the rate of Regular
contractor is very high, the above condition no. 2.11 shall be suitably
relaxed by PGVCL. L-1 regular contractor however will get heavy
weight age in order placement.
3.2 For laying of Under Ground Cable work:
3.2.1 While placing the order, the quantity distribution to each new
contractors / new firms, Section 1 Sr. No. 2, shall be restricted up to
% of the tender amount/Qty. for all such new bidders provided the
price of new contractor is lower than the regular/experienced
contractor. New contractor / new firm will be considered as a regular
contractor only after full filing experience criteria as mentioned in
Bidders qualifying criteria as per point no. 2 in Section I.
Sign & Stamp of the Bidder
3.2.2 The new contractor will be asked to match the L-1 prices of the new
contractor only and the Regular contractor has to match the L-1 price
of the Regular/experienced contractor only.But if there are no Regular
contractor OR if the rate of Regular contractor is very high, the above
condition no. 2.21 shall be suitably relaxed by PGVCL. L-1 regular
contractor however will get heavy weight age in order placement. The
Contractors who have confirmed /fulfilled pre eligibility criteria will
only be considered for price evaluation. PGVCL will not consider the
price bid of any contractor who does not confirm / fulfil the eligibility
criteria. L-1 regular contractor however will get heavy weight age in
order placement.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each
concerned Divisions under above locations. The planning for each location has to be
prepared in consultation of the Deputy Engineer of the concerned Sub Division under
whose control the work is allocated. The work must be carried out under Supervision of
concerned S/dn Head or Authorized Staff appointed by SDO.
5.ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any store
Centres of PGVCL jurisdiction and successful bidder has to take delivery from these
stores at his own only.
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued
Fourth Sub Work Order only after the submission of Inventory sheet with sketch and
material account statement for any of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to the
respective sites and will be fully responsible for any damage to or loss of all
materials at any stage during transportation or erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe
custody of all the stored materials at his own cost. Material which is to be allotted
by PGVCL is to be carted, loaded and unloaded at Bidder’s cost and risk from
PGVCL’s respective Stores. PGVCL must have access to such Store/s at any time of
Day thought the contractual period and Contractor will cooperate for verification of
such store/s and Inventory accounting. Failing to which actions may be initiated
after issuance of required Notice to the Contractor. Store address/s is to be
mentioned in the “General information about the Bidder” under Section I of this
7.3 The Contractor shall have total responsibility for the entire materials stored, loose,
semi assembled and/or erected by him at site in his custody. The Contractor shall
make suitable security arrangements at his own cost to ensure the protection of
all materials, equipment and works from theft, fire pilferage and any other
damages and loss. It shall be the responsibility of the contractor to arrange for
security till the works are finally taken over by the PGVCL
Sign & Stamp of the Bidder
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to
the extent of 100 % cost of materials, which are required to complete the work.
Contractor shall have to take comprehensive insurance policy equivalent to the Order
Value against any loss, damage, theft, pilferage, fire etc. for the complete period of
storage, erection and commissioning up to the time of taking over by PGVCL. The
Contractor shall deal directly and pursue the claim with the Insurance Company and
shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the successful Contractor
shall be furnished to Engineer-In-Charge. In absence of the above insurance policy, R.A.
Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be
responsible to lodge, pursue and settle all the claims with the Insurance Company for
all items, materials and the PGVCL shall be kept informed about it. Contractor shall
replace the lost / damaged materials / items promptly irrespective of the settlement
of the claims by underwriter and ensure that the work progress is as per agreed
schedule. The loss, if any, such replacement will have to be borne by the Contractor
and PGVCL will not entertain any claim / representation in this regard. However it will
be contractor's responsibility to insure the entire project is taken over by the PGVCL.
8. Account of material issued:
8.1 The successful bidder shall have to maintain accurate day to day item wise
account of use of issued materials which shall be got checked from time to
time by the Engineer In Charge of the Company. The contractor will be
responsible for custody and preserving the issued materials till the work is
hand over by the contractor after completion.
8.2 The successful bidder has to maintain site register, covering all the daily
details of material receipt and utilization, progress of work etc. This register
shall be checked and signed by Engineer In Charge/Deputy /Executive
Engineer,of respective Sdn/Division during the site visit as per requirement and
exigency of work if deem fit.
8.3 After completion of the work against each Sub Work Order, all the surplus
materials issued by the PGVCL shall be returned by you to the respective
divisional /Regional stores only at contractor’s cost.Such Material Shall not be
credited in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to
complete the ordered work within ____ Days from the Date of issue of
9.2Time limit of each sub work order should not be maximum up to 60 Days.
8.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either
due to heavy rains or other reasonable causes, such facts should be
immediately brought to notice of the Engineer In Charge. If the reasons for
stopping the work are genuine the Engineer In Charge may ask the successful
bidder to start the work again as per condition. The period of such stoppage
will not be considered as a part of working days moreover the successful
bidder cannot claim compensation for such stoppage.
Sign & Stamp of the Bidder
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to
Engineer In Charge and Executive Engineer____________. If found that the work
is unsatisfactory or not progressing as per schedule then any action would be
taken by the PGVCL as may deemed fit to see that work is completed at the
risk and cost of contractor. The completion time allowed for each Sub work
Order shall be strictly observed.
9. Time limit extension will be given, as per Clause No. 12of this section,if
material is not supplied in time and in any case of objection not cleared in
time. But if materials given in time and there is no any objection, then no time
limit extension will be granted and penalty with applicable GST with Cess will
be imposed as per rules.
11 CHANGE OF QUANTITY:
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or
decrease the quantities of items under the Contract but without any change in
unit price or other terms & conditions. Such variations unless otherwise specified
in the accompanying GCC and/or Technical Specifications, shall not be subjected
to any limitation for the individual items but the total variations in all such items
under the Contract shall be limited to the extent of 30% (Thirty Percent) of the
contract price by way of suitable amendment to the contract.
11.2 The Contract price shall accordingly be adjusted based on the unit rates available
in the Contract for the change in quantities as above. The base unit rates, as
identified in the Contract shall however remain constant during the currency of
the Contract, In case the unit rates are not available for the change in quantity,
the same shall be subjected to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the Contractor.
Responsibility of material will be that of the contractor.
12. Penalty with GST:
12.1 Penalty with GST is levied on thetime limit of Sub Work Orders. If the work
is not completed within the scheduled period as prescribed in Sub Work
Order, penalty with GST and cess as applicable at the rate of 0.5 % per week
or part thereof on delayed portion subject to maximum up to 10 % of the sub
work order Valuewith GST and cess as per applicable rate. This will be
deducted from the bills payable either against this contract or any bank
guarantee or any other amount payable under any other contract with the
PGVCL. For Penalty calculations or Time limit Extension, following points are
to be observed.
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on
which the first material is issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by
Store In-charge/Store Keeper must be taken against the particular item by
the contractor.
12.4 In Case of non-availability of Material, contractor must visit the respective
store every fortnight and no stock material details are to be submitted to
respective Executive Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such documents
produced by Contractor.
Sign & Stamp of the Bidder
12.6 Time limit Extension must be given as per F & A Letter No.
PGVCL/F&A/5083/14-06-2017 and PGVCL/F&A/745/11-06-2018.
12.7 At the time of submission of Bill against SWO, all such Documents are to be
submitted by contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
12.9 During the execution of Work, if Contractor/Labour are found violating OR
Braking the Safety rules and Regulations, then Engineer-in-Charge will serve
the warning Notice on first Instance. On second Instance the amount of
Fine will be Rs. 500.00 or 0.1 % of amount of SWO (Whichever is high) with
GST and cess. Even If after above two instances, still Contractor found
breaking of Safety Rules and Regulations then Procedures for Stop
dealingmust be initiated against him as per rules and regulations.
13. Payment terms shall be as follows:
13.1 Payment will be made against Invoice value and shall be paid against actual
execution. The bills should be submitted in Duplicate to respective
Superintending/Executive Engineer, Circle/Division Office along with following
• Measurement Report of each site by PGVCL authorized inspection Officer (not
below the rank of Deputy Engineer)
• Material Accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is
• Copy of Insurance Policy against the Material equivalent to the Order Value as
per Tender Condition No. No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from
the actual date of completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
13.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works
otherwise only final bill shall be paid.
13.3 The time limit for the work may be reduced and contractor should make all
his efforts to complete the work within stipulated time limit as may be given
by the Engineer In Charge depending upon emergency of work.
14 FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties
14.1 War and other hostilities, (whether war be declared or not), invasion, act
of foreign enemies, mobilization, requisition or embargo;
14.2 Rebellion, revolution, insurrection, military or usurped power and civil
14.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel
or from any nuclear waste from the combustion of nuclear fuel,
radioactive toxic explosive, or other hazardous properties of any explosive
nuclear assembly or nuclear components thereof;
14.4 Riot, commotion or disorder, except where solely restricted to employees
of the Contractor.
14.5 Neither party shall be considered to be in default or in breach of his
obligations under the Contract to the extent is that performance of such
obligations prevented by any circumstances of Force Majeure that arise
after the date of the Notification of Award.
Sign & Stamp of the Bidder
14.6 If either party considers that any circumstances of Force Majeure have
occurred which may affect performance of his obligations he shall
promptly notify the other party.
14.7 Upon the occurrence of any circumstances of Force Majeure, the
Contractor shall endeavour to continue to perform his obligations under
the Contract so far as reasonably practicable. The Contractor shall notify
the Engineer-in-Charge of the steps he proposes to take including any
reasonable alternative means for performance, which are not prevented
by Force Majeure. The Contractor shall not take any such steps unless
directed so to do by the Engineer-in-Charge.
14.8 If circumstances of Force Majeure have occurred and shall continue for a
period of 180 days, notwithstanding, the Contractor may by reason
thereof, having been granted an extension of Time for Completion of the
Works, either party shall be entitled to serve upon the other, 30 days’
notice to terminate the Contract. If at the expiry of the period of 30 days
Force Majeure shall continue, the Contract shall terminate.
15 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all
works connected with line having been completed correctly as per Indian
Electricity Rules & procedure. Any extra cost involved due to incompleteness of
work or bad workmanship found out subsequently shall be set right with and by
you at your own cost.
16 HANDING OVER OF ASSET
16.1 After successful completion of the lines and Transformers or any other
electrical equipment the entire newly created network is to be handed
over to the concern Deputy Engineer of PGVCL. The handing over note
covering the details of all the materials used and total work executed
must be signed jointly by the bidder and PGVCL Engineer. Copy of handing
over note must be attached along with bill.
16.2 The contractor shall arrange to hand over the complete work immediately
on completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by
contractor due to non-availability of particular item/material for long period of
time and TLE cannot be approved for that work beyond certain time limit Or such
item if not required to be installed at particular location, then Recovery is to be
made as mentioned below for not carrying out that work from SWO issued for
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No any other
Recovery should be made other than above Work.
Sign & Stamp of the Bidder
18 CONTRACT QUALITY ASSURANCE:
18.1 The Bidder shall include in his proposal the Quality Assurance Program
containing the overall quality management and procedures which he proposes
to follow in the performance of the Works during various phases as detailed in
relevant clause of the General Technical Conditions.
18.2 At the time of Award of Contract, the detailed Quality Assurance Program to be
followed for the execution of the Contract. PGVCL reserve the right to inspect
the work at any stage of contract i.e. during the execution and after the
execution of work.
18.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought
out items (if any) are being supplied. Such details shall be accompanied by
their list of previous supplies made performance reports etc. However, in case
of orders are placed, specific approval shall be obtained from the PGVCL for
the vendor supplied materials. The quality assurance program shall be
furnished for each material separately for approval.
19 TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
19.1 In case of any type of misappropriations, cheating or intention of cheating,
frauds, irregularities, malpractice, etc. the Managing Director PGVCL reserves
the right to cancel the order without giving reasons thereof and forfeit the
security deposit.
19.2 The PGVCL reserves the right to terminate the Contract either in part or in full
due to reasons other than those mentioned under clause entitled ‘Contractor’s
Default. The PGVCL shall in such an event give fifteen (15) days’ notice in
writing to the Contractor of his decision to do so.
19.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall
discontinue the work on the date and to the extent specified in the notice,
make all reasonable efforts to obtain cancellation of all orders and Contracts to
the extent they are related to the work terminated and terms satisfactory to
the PGVCL, stop all further sub-contracting or purchasing activity related to
the work terminated, and assist PGVCL in maintenance, protection, and
disposition of the works acquired under the Contract by the PGVCL. In the
event of such a termination the Contractor shall be paid compensation,
equitable and reasonable, dictated by the circumstances prevalent at the time
of termination.
19.4 If the Contractor is an individual or a proprietary concern and the individual or
the proprietor dies and if the Contractor is a partnership concern and one of
the partners dies then unless the PGVCL is satisfied that the legal
representatives of the individual Contractor or of the proprietor of the
propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract the PGVCL shall be
entitled to cancel the Contract as to its in completed part without being in any
way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on account
of the cancellation of the Contract. The decision of the PGVCL that the legal
representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the
Sign & Stamp of the Bidder
Contract shall be final and binding on the parties. In the event of such
cancellation the PGVCLshall not hold the estate of the deceased Contractor
and/or the surviving partners of the estate of the deceased Contractor and/or
the surviving partners of the Contractor’s firm liable to damages for not
completing the Contract.
20 ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and
Bidder, in connection with this agreement except as to matters, the decision
for which has been specifically provided, either party may forthwith give to
the other notice in writing of existence of such questions, dispute, difference
and the same shall be referred to the sole arbitration of a person nominated by
Managing Director, PGVCL. This reference shall be governed by Indian
Arbitration Act prevailing at the time of dispute and the rules made there
under. The award in such arbitration shall be final and binding on all the
parties. Work under the agreement shall continue during the arbitration
proceedings unless the PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents
forming part of the enquiry or Contract are property of PGVCL and shall not be
used for any other purpose, except for the execution of the contract. All rights
related to the technical specifications, drawings and records are reserved by
PGVCL only and no part or partial should be reproduced, copied or alter without
prior permission to PGVCL in writing. In the event of the breach of this provision,
PGVCL can claim the damages caused by such events.
22 Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
22.1 Has submitted fake, false or forged documents/certificates
22.2 Has revised/withdrawn price bid after opening of Techno:
commercial bid, until and unless it is sought for
22.3 Has refused to accept Letter of Acceptance/Purchase Order/Work
Order after the same is issued by the Company within the validity
period and as per agreed terms and conditions
22.4 Has committed breach of contract or has failed to perform a
contract or has abandoned the contract
22.5 Has failed to provide suitable expertise for the work as per
prescheduled program
22.6 Has failed to submit all the necessary Test reports/documents
within time schedule / as per Company's time limit, as mentioned
in the LOA, if the Letter of Acceptance (LOA) is placed subject to
submission of type reports / documents to the firm.
22.7 Has indulged in construction and erection of defective works.
22.8 Has substituted materials In lieu of materials supplied by the
Company or has not returned or has short returned or has
unauthorised disposed of materials/ documents/ drawings/ tools
or plants or equipment supplied by the Company
22.9 Has involved in malpractices such as bribery, corruption, fraud,
canvassing and pilferage
22.10 Has unauthorised obtained official company information or copies
of documents, in relation to the Tender/Contract
Sign & Stamp of the Bidder
22.11 Has failed to follow the stipulated mode of communication, if
specified by the tendering authority/ purchaser.
22.12 Any other ground for which in the opinion of the Company makes
it undesirable to deal with the Firm, and
22.13 In case the State Government directs the Company to place a firm
in stop dealing/ banned for business dealing/ blacklisting
22.14 The firm, stop deal and/or banned for business dealing and/ or
blacklist by GUVNL or any subsidiary Companies of GUVNL shall be
considered as a stop deal and/ or banned for business dealing
and/ or blacklisting for all Companies.
23. Effect of putting a proprietor/firm for Stop dealing/Banned
forbusiness dealing are as below:
23.1 The proprietor/all the partners/directors of the stop deal/ banned for
business dealing/ blacklisting firm shall also be considered for stop
deal/ banned for business dealing.
23.2 Once the name of the firm and/ or proprietor/ partner/ director of the
firm appears in the list of Stop dealing / Banned for business dealing in
any Company of GUVNL and its Subsidiary Companies,
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid
submitted by the Firm shall be returned.
23.3 Action to be taken, when a Firm and/or proprietor/ partner/ director
of the firm is put on Stop dealing/ Banned for business dealing by
GUVNL or any of its subsidiary Companies, during tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will
be treated as “Disqualified Bid” and automatically stand as
“Rejected Bid” at the time of scrutiny of Preliminary / Technical
(ii) After opening Technical bid but before opening the price bid, the
price bid of the Firm should not be opened and the bid submitted
by the Firm will be treated as “Disqualified Bid” and automatically
stand as “Rejected Bid” at the time of scrutiny of Technical Bid.
(iii) After opening of price bid, the offer of the Firm should be ignored
and will not be further evaluated. The Firm will not be considered
for issue of order even if its price is the lowest. In this situation,
the next lowest bidder shall be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should be
returned after obtaining confirmation from GUVNL and its other
subsidiary Companies that there are no outstanding dues
recoverable from the firm.
23.4 If a Firm is put on Stop dealing / Banned for business dealing in one
Company and is already executing work and/ or Letter of Acceptance/
purchase order awarded to them by another Company, then the firm
should be allowed to complete such awarded work / supply.
23.5 The amount of EMD/SD/ any payment against supply withheld at the
instance of GUVNL or any of its subsidiary Companies shall be
appropriated against the dues recoverable from the firm by GUVNL or
any of its subsidiary Companies. EMD/ SD/ PG in the form of bank
Guarantee shall be encashed and appropriated.
Sign & Stamp of the Bidder
23.6 The Stop dealing/ Banned for business dealing shall be Firm- specific
and when a Firm is put on Stop dealing/ Banned for business dealing,
all the manufacturing works of the Firm shall be on Stop dealing/
Banned for business dealing for GUVNL and its Subsidiary Companies &
for all Services of the Firm.
23.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a
Proprietary Concern, then all the Concerns of the same Proprietor shall
also be considered to be on Stop Dealing/ Banned for business dealing.
23.8 The Board of Directors of the concerned Company may however, if he
considers it to be in the interest of the Company, remove the ban in
respect of any specific Service from any Contractor for that Company
24. Every bidder should, at the time of submission of bid, give a declaration as per
Annexure VI attached with this Tender, that bidder and/or proprietor/
partner/ director of the firm has not been placed on Stop dealing / Banned for
business dealing / blacklisting by GUVNL and it’s any Subsidiary Companies.
25. JURISDICTION:
All questions, disputes, or differences arising under out of or in connection with
Tender/Contract if concluded shall subject to the exclusive jurisdiction of the
Court under whose jurisdiction the place from which Tender/Acceptance if
Tender is issued, is situated i.e. respective Location’s Court.
Sign & Stamp of the Bidder
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Item Time required for work Mentioned in Tender
1 Labour work for Laying of
Underground cable and E/o
HT LT Line and Transformers
and Maintenance
Sign & Stamp of the Bidder
Details of work experience in last three years
(To be completely filled by the Bidder)
Company with full Ref. & Work
Sr. Details of order
address, phone, Work Description date of Order
fax and name of the order Value
• Copies of MAJOR Work orders along with Work completion certificates should be attached
with this information.
• If necessary, separate sheet may be used to submit the information
Sign & Stamp of the Bidder
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Ref. & Work completion with
Sr. full address,
Work Description date of Order Certification of
No. phone, fax and
the order Value Order issuing
name of contact
• Copies of Resumes and appropriate certifications should be attached with this
• If necessary, separate sheet may be used to submit the information.
Sign & Stamp of the Bidder
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________, employee of PGVCL
_______________________ (designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent
Department i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified
below in this sheet. If there are no deviations offered, it should be clearly mentioned on this
Deviation offered to
Chapter No, Clause No. of Deviation offered
the tender document
Sign & Stamp of the Bidder
List of Onsite Testing Facility (For the work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr. Name of Date of purchase Date of calibration Utility
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in signed and stamped
for each quoted item of the tender along with the Technical Bid.
M/s_________________________________________________ is not stop deal/black listed
by GUVNL and or any subsidiary companies viz.
PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered item.
Seal & Signature of the Tenderer/Firm
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Type Test Tests Carried Rating & Type / Name of the Results
Sr. No Report No. & out at (Name Designation of test Of the
Date of Laboratory) Item / Equipment Conducted Tests.
Sign & Stamp of the Bidder
List of Performance Certificate:
Sr. Name of the Authority by Reference No. &
Details of items
No. whom certificate is issued Date
Sign & Stamp of the Bidder
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five
Sr. Type Of Accident Brief Reason for
Fatal/Nonfatal Affected
No. (Electrical/Mechanical) the Accident
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR
MISHANDALING OF MATERIAL
of M/s_____________________________________________ hereby declare we will
provide ______ nos of labours to carry out this tenders scope of work. We are having
Labour Insurance Policy No.____________________ for ________ nos. of our labours. We
declare that, as mention below table, we are having following safety gadgets of our own
and they all are in good condition.
Seal of the Firm Signature of the Tenderer with Designation
List of Safety Gadgets Owned by Bidder
List of Safety Gadget Unit owned by
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
Sign & Stamp of the Bidder
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm)
having their registered office at _____________________________________ (Address of the
firms Registered office) (hereinafter called the ‘Tenderer’) wish to participate in the tender
(Supply/ Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
_________________________ Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank
Guarantee for (hereinafter called the “Beneficiary”) Rs._____________ (Amount of EMD) valid
till _________ (Mention here date of validity of this Guarantee which will be 5 (FIVE) months
beyond initial validity of Tender’s offer) which is required to be submitted by the tenderer
along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank
Guarantee) having our registered office at ______________________ (Address of Bank’s
registered office) hereby give this Bank Guarantee No.________________ dated _________
and hereby agree unequivocally and Unconditionally to pay immediately on demand in writing
from the Paschim Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any
amount not exceeding Rs. ______________ (Amount of E.M.D.), (Rupees
_________________________________ (In words) to the said Paschim Gujarat Vij Company
Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the
tender or part thereof by the Tenderer within its validity or Non submission of Security
Deposit by the Tenderer within one month from the date tender or a part thereof has been
accepted by the Paschim Gujarat Vij Company Ltd. would constitute a default on the part of
the Tenderer and that this Bank Guarantee is liable to be invoked and encashed within its
validity by the Beneficiary in case of any occurrence of a default on the part of the Tenderer
and that the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
____________________ (Mention here the date of validity of Bank) and shall not be
terminable by notice or by Guarantor change in the constitution of the Bank or the firm of
Tenderer Or by any reason whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alternations made, given, conceded with
or without our knowledge or consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GUVNL or Subsidiaries). Notice or invocation by any person such as assignee, transferee or
agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee
can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is
restricted to Rs. __________ (Amt. of E.M.D.) (Rupees
____________________________________) (In words). Our Guarantee shall remain in force
till _________ (Date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before_______ (Date of Validity of the Guarantee),
all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released
and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code, with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business,
which are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij
Company Ltd. or any Officer authorized by it in this behalf any amount up to and not
exceeding _______ (in words) Rupees ___________________ to the said Paschim Gujarat Vij
Company Ltd. on behalf of M/s. _________________________________________________who
have entered into a contract for the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of ______________
and shall not be terminable by notice or by change in the constitution of the Bank or the firm
of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder
shall not be impaired or discharged by any extension of time or variations or alterations
made, given conceded or agreed, with or without our knowledge or consent, by or between
parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GUVNL or Subsidiaries). Notice or invocation by any person such as assignee, transferee or
agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee
can be made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs.___________ (Rupees ___________________________ only). Our guarantee
shall remain in force until ____________________ (Date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before_______
(Date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall
be forfeited and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s Authorized Signatory with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business,
which are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
This agreement is made at ___________the ___day of______month _______Year between the
Paschim Gujarat Vij Company Ltd. &__________________________ (hereinafter referred to
as “the Contractor “which expression shall unless excluded by or repugnant to the context
included its successors or permit assigns) of the one part and the Paschim Gujarat Vij
Company Ltd. Having its Regd. and Corporate Office at Laxminagar, Off Nanamava Road,
Rajkot, 360004 (hereinafter called “The Company” which expression shall unless excluded by
or repugnant of the context include its successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the
Company’s LOA No. ____________________, Dated ___________, hereinafter called “The
works and more particularly desorbed enumerated or referred to in the specifications, terms
other letters and schedule of price which for the purpose of identification have been signed
by The Superintending Engineer/Executive Engineer,, Circle/Division, PGVCL on behalf of
the Company, a list where of is made out in the schedule here under written and all of which
said documents are deemed to form part of this contract and include in the expression “The
works “wherever herein used, upon the terms and subject to the conditions hereinafter
And whereas the Company has accepted the tender of the contractors for the Maintenance &
Erection of HT / LT Line & T/C and Underground cable up on the terms and subject to the
conditions herein mentioned.
1.) The contractors shall do and perform all works and things in this contract mentioned
and described or which are implied therein of therefore respectively or are reasonable
necessary for the completion of the works as mentioned and at the time in the manner
and subject to the terms conditions and stipulation contained in this contract and in
consideration of the due provision, executions, construction and completion of the
works agreed to by the contractors as aforesaid the company both hereby covenant
with the contractor to pay all the claims of money as and when they become due and
payable to the contractor under the provisions of the contract such payment to be
made at such times in such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to
and without prejudice to the right of the company to enforce for delay and or any
other rights whatever including the right to reject and cancel on default or breach by
the contract of the conditions and the covenant as stipulated in the general conditions
specifications form Or tender schedule drawing etc. attached with the Company LOA
3.) The Contractor will strictly follow the safety Rules and Regulations during the
execution of aforesaid work. The Contractor will also provide all required Safety
Gadgets to his Supervisors and labours to execute the work mentioned in Tender. On
violating or breaking the Safety Rules and Regulations, and if Supervisors/Labours are
found without Safety Gadgets, “The Company” reserves the right to take actions as
per the terms and conditions mentioned in Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due
to reasons other than those mentioned under clause entitled ‘Contractor’s Default’.
The PGVCL shall in such an event give fifteen (15) days’ notice in writing to the
Contractor of his decision to do so.
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain
cancellation of all orders and Contracts to the extent they are related to the work
terminated and terms satisfactory to the Company, stop all further sub-contracting or
purchasing activity related to the work terminated, and assist “The Company” in
maintenance, protection, and disposition of the works acquired under the Contract by
the Company. In the event of such a termination the Contractor shall be paid
compensation, equitable and reasonable, dictated by the circumstances prevalent at
the time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners
dies then unless “the Company” is satisfied that the legal representatives of the
individual Contractor or of the proprietor of the propriety concern and in the case of
partnership, the surviving partners, are capable of carrying out and completing the
Contract “the Company” shall be entitled to cancel the Contract as to its in completed
part without being in any way liable to payment of any compensation to the estate of
deceased Contractor and/or to the surviving partners of the Contractor’s firm on
account of the cancellation of the Contract. The decision of the Company that the
legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and
binding on the parties. In the event of such cancellation the Company shall not hold
the estate of the deceased Contractor and/or the surviving partners of the estate of
the deceased Contractor and/or the surviving partners of the Contractor’s firm liable
to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters
may be altered by mutual agreement and if so altered shall not be deemed or constructed to
mean and to effect or alter other terms and conditions of the contract and the contract so
altered or revised shall be and shall always be deemed to have been subject without
prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year
first above written.
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the
COMPANY having given contract for the work of _________________________________
A/T No. __________________________, dated _______________ and all future contract
that may be awarded to me in the next one year and in terms of the condition in clause 33 of
the COMPANY’s tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay compensation to my
workmen payable under the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter
called the said Act for death or injuries caused to the workmen engaged by this presents, if
such compensation is paid by the COMPANY as principal under such sub-section (1) of section
12 of the said Act on behalf of me, to pay such amount of compensation on demand within
hours to the COMPANY that it might have to spend as legal and other incidental charges in
defending any suit or action arising out of the death of injuries in regard to compensation
paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the
death or injuries to the workmen engaged by me. During the execution of work of said
contract and all future contracts that may be awarded to me in the next one year is filed by
the worker against the COMPANY, I shall imbrues to the COMPANY such sum that the
COMPANY is required to spend as legal and other incidental charges in defending such suit or
action and also the amount that may be ordered to be paid to the worker / or his heirs as
compensation and that the above written bind shall remain in full force and virtue till the
COMPANY is required to defend such suit or action filed by the workers and or heirs against
the COMPANY. Further it is applicable on death of contractor himself also. No any
compensation will be claimed by legal heirs of contractor.
Signature of the Executant
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
26_97 VIJAPADI HVDS TENDER PAGE.pdf
LINE WORK SCHEDULE B.pdf
Technical Bid Conditions Capital work.pdf
Download all tender documents and submit your bid