Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.5 L
Closing Date
29 Sept 2026, 5:00 pm2d left
General Manager
Main Administrative Building Sector-6 Noida
Maintenance of Drain (Covering of RCC Drain from Sector-117, 116 Crossing to Electric Sub Station Sector-116), Noida
2026_NOIDA_1183365_1
45/GM/SM-WC-6/2026-27
Open Tender
Civil Works
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹2.5 L
29 Sept 2026
8 Sept 2026
30 Sept 2026
8 Sept 2026
29 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | 2.5 | Cum | 1,347.16 | ₹3,367.9 |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 2.5 | Cum | 120.55 | ₹301.38 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 4,169 | Kg | 82.81 | ₹3,45,234.89 |
| 4 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. | 21 | Cum | 7,912.32 | ₹1,66,158.72 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 196 | Sqm | 320.65 | ₹62,847.4 |
| 6 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 3,926 | Sqm | 176.77 | ₹6,93,999.02 |
| 7 | Neat cement punning | 3,926 | Sqm | 39.13 | ₹1,53,624.38 |
| 8 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done | 5,089 | Cum | 151.57 | ₹7,71,339.73 |
| 9 | Fabrication & Manufacturing of Prestressed Hollow Core slab (Hollow area 25 to 30%) of different thickness & modular width 1200 mm in Controlled Factory Environment with approved methodology informing to IS 10297- 1982 conforming to IS : 10297- 1982 by using long line casting method having arrangement of proper steel bed. Concreting should be done by batch mixing plant capable of producing zero slump concrete, transported through automatic shuttels of standard make & layed on bed with the help of extruder/Slipformer, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in slab element after achieving required strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of strands should be paid separately). Note : Excess/ less cement over the specified cement content used as per design mix is payable / recoverable separately 200 mm thick hollow core slab | 2,473 | Sqm | 3,091 | ₹76,44,043 |
| 10 | Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor. Prestressed hollow core Slab up to 200 mm thickness | 2,473 | Sqm | 119.97 | ₹2,96,685.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2225573.xls
BOQ • 0.92 MB
Capability.xls
Additional Documents • 0.05 MB
TD.pdf
Tender Documents • 5.31 MB
45.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .