Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,720.63Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹99,730.60+₹9.97 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹99,700
EMD Value
₹1,994
Closing Date
31 Jul 2026, 6:00 pmClosed
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
C/O PCC PATH AT VARIOUS SPOTS WITH 2 NO. GATES AT CHOORA , PYT PUTKHA MUQAM, UNDER ADP(PRI) YEAR 2026-27 BLOCK, SANGRAMA
2026_RDPR_316110_3
115/Xen/Rew/Bla/2026-27 Dated 15/07/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹1,994
4 Aug 2026
15 Jul 2026
1 Aug 2026
15 Jul 2026
31 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of dry stone soling handpacked under floors or foundations, ramming including plum including carriage by MT complete | 1 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete. | 1 | Cum | - | - |
| 3 | Structural steel work in Built up section,fixed with or without connecting plate,including cutting ,hoisting,fixing in position and applying a priming coat of app steel primer, all complete | - | Kg | 1 | - |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work | 1 | Sqm | - | - |
| 5 | Carriage of Sand /Aggregate for an avg. lead of 20 Km by MT | - | Cum | 1 | - |
| 6 | Providing /Fixing CIB including Photographs of work before, during & after execution of work complete job | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1029200.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1029200.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .