| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance | ₹16.1 L | L1 | Admitted-Finance |
| 2 | L2₹16.1 L+₹617.54 (0.04%)Admitted-Finance | ₹16.1 L+₹617.54 (0.04%) | L2 | Admitted-Finance |
| 3 | L3₹16.1 L+₹1,490.18 (0.09%)Admitted-Finance | ₹16.1 L+₹1,490.18 (0.09%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AAYKAYCONSTRUCTIONS L2 | NIHAS EM L3 | BUILD OWN ASSOCIATES L1 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORK | ||||||
| 1.01 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 2.51 | Cum | 365 ₹915.42 | 360 ₹902.88 Lowest | 360 ₹902.88 Lowest |
| 1.02 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.25 | cum | 7,930 ₹9,944.22 Lowest | 7,930 ₹9,944.22 Lowest | 8,000 ₹10,032 |
| 1.03 | 15.2.1 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.05 | cum | 2,510 ₹2,643.03 Lowest | 2,510 ₹2,643.03 Lowest | 2,510 ₹2,643.03 Lowest |
| 1.04 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 25.08 | Sqm | 385 ₹9,655.8 Lowest | 388 ₹9,731.04 | 400 ₹10,032 |
| 1.05 | 5.9.2
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 10.53 | Sqm | 840 ₹8,845.2 | 830 ₹8,739.9 Lowest | 850 ₹8,950.5 |
| 1.06 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 117.91 | Kg | 122 ₹14,384.9 | 110 ₹12,969.99 Lowest | 112 ₹13,205.81 |
| 1.07 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.93 | Cum | 10,485 ₹30,762.99 | 10,482 ₹30,754.19 Lowest | 10,500 ₹30,807 |
| 1.08 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 35.04 | Cum | 722 ₹25,298.88 | 721 ₹25,263.84 Lowest | 800 ₹28,032 |
| 1.09 | 16.79 Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. | 17.2 | Cum | 3,505 ₹60,293.01 | 3,500 ₹60,207 Lowest | 3,500 ₹60,207 Lowest |
Tender Value
₹19.8 L
Closing Date
19 Jun 2026, 5:00 pmClosed
Baiju T.P
Forest Industries Travancore Limited
Construction of Open Gymnasium
2026_FITL_855527_1
FIT/CP-20/2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
Kalamassery Municipality
Refer Tender Document
8 documents required · 8 mandatory
₹2,950
Exempted
Forest Industries Travancore Limited
23 Jun 2026
11 Jun 2026
20 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
11 Jun 2026 - 13 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK | |||||
| 1.01 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 2.51 | Cum | - | - |
| 1.02 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.03 | 15.2.1 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.04 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | Sqm | - | - |
| 1.05 | 5.9.2
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | Sqm | - | - |
| 1.06 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.6 | Kg | - | - |
| 1.07 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.93 | Cum | - | - |
| 1.08 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | Cum | - | - |
| 1.09 | 16.79 Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. | 17.2 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1445901.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .