Executive Engineer, panchayat, R & B Division, Surat.
Package No.6/BAR/MMGSY/RES/2-RD/25-26 (1) Bardoli Asthan Kharvas Road. (0/00 To 1/650 KM)(2)Vadoli Babla road (Babla Approach Road) (0/00 To 2/400 KM)Total Lentgh:4/050 km Ta. Bardoli Di. Surat.
337642
07 of 2026-27
Open
Civil Works - Roads
Works
Surat
5 documents required · 5 mandatory
₹3,600
Executive Engineer, panchayat R & B Division, surat
₹1.5 L
21 Aug 2026
21 Aug 2026
21 Aug 2026
5 Sept 2026
21 Aug 2026
Name of work: Package No.6/BAR/MMGSY/RES/2-RD/25-26 (1) Bardoli Asthan Kharvas
Road. (0/00 To 1/650 KM) (2)Vadoli Babla road (Babla Approach Road)
(0/00 To 2/400 KM) Ta. Bardoli Di. Surat.
Memorandum showing items of works to be carried out
It. No. Quantities Item of work Estimated Total Amount
It. No. Quantities Item of work Estimated Total Amount
estimated but may In figures according to
be more or less Rs. Ps. estimated
1 Clearing and grubbing road land, including
uprooting rank vegetation, grass bushes, shrubs,
saplings, and trees girths up to 300 mm, removal
0.36 Hect. of stumps of trees cut earlier, and disposal of 34889.38
unserviceable materials(D) By mechanical
means in area of thorny jungle
2 Scarifying gravelled macadam or bitumen
macadam surface 6 cm to 10 cm.depth including
12188.00 Sq.mt. stacking useful materials on road side and 42.76
disposing off remaining stuff.
3 Earthwork in cutting in all sorts of soil and soft
murrum including conveying and putting the
1465.00 Cu.mt. stuff in spoil bank maintaining minimum 109.41
distance of five meter between top edge and
cutting and toe of spoil bank.
4 Supplying Stacking and Spreading the Hard
533.25 Cu.mt. Murrum including rolling and watering etc. 591.06
5 Construction of granular sub-base by providing
coarse graded material grading-II, spreading in
uniform layers with motor grader on prepared
488.25 Cu.mt. surface, mixing by mix in place method with 765.15
rotavator at OMC, and compacting with
vibratory roller to achieve the desired density,
complete as per clause 401.B
6 Construction of granular sub-base 150 mm thick
layer by providing machine crushed B.T.
material satisfying MORT&H specification
(Fifth revision) of Grading I including spreading
478.95 Cu.mt. in uniform layer with motor grader on prepared 817.05
surface, mixing by mix in place method with
rotavator at OMC and compacting with vibratory
roller to achieve the desired density etc.
7 Providing and laying 150mm thick W.B.M of
Grading-II in two layer each of 75mm using
B.T.M.C. metal of size 45mm to 63mm in layers
including 13% sone screening 13.2mm size and
425.25 cu.mt. 7% stone dust as filler, including spreading, 1189.37
watering and cosolidation by vibratory roller as
per MoRTH specifications etc complete as
directed by engineer in charge.
8 Providing and laying bituminous base course
37.5mm thick compacted in one layer with tack
coat of asphalt Emulsion RS-1 at the rate of
Kg / 10 Sqmt. and using B.T. stone aggregate or
required gradation and asphalt (VG-30) grade
for mixing @ 1.99 % by weight of total mix for
mixing including heating the aggregate and
asphalt by drum mix plant and spreading the
same by paver finisher and consolidation with
vibratory roller including providing all meterials,
equipments, tools and plants, oil, kerosene, fire
wood, labour chrges etc. complete.
9 Providing & laying 25 mm. thick SDBC using
B.T. stone chips as per MORTH gradation and
specification with asphalt VG-30 at the rate of
50.00 kg. / M.Tone of total wt. for mix i.e. (5.00
% ) by weight of total mix of bitumen including
mixing aggregates & asphalt by continuous
852.00 M.Ton batching drum mix plant & spreading the same 4804.77
by paver finisher including rolling &
consolidation with 10 - 12 tonnes vibratory roller
& providing tools 7 plants, fire wood, oil,
kerosene, labour charges using contractor's own
machineries etc. complete. (As per
10 Providing & laying 37.50mm. thick compacted
Bituminous Macadam with using VG-30 asphalt
for tack coat at 2.50 Kg / 10 Sq.Mt. using stone
aggregate as per gradation and aspahlt grade VG-
30 at 3.40 % by weight of total mix hot laid
process with drum mix plant including
consolidation with vibrating roller including
operating plant and machinery cost of asphalt,
fuel, oil, lubricant and labour charges etc.
11 Providing and laying asphalt painting on B.T.
surface with bitumen VG-30 at rate 5.00Kg /
14813.00 Sq.mt. 10Sq.mt. including spreading stone dust for 46.65
painting surface at rate of 0.03 cu.mt. / 10 sq.mt.
12 Providing and fixing ordinary kilometer stone of
precast C.C. 1:2:4 including necessary
4.00 No.s reinforcement as per I.R.C. type design in C.C. 757.16
1:4:8 including lettering and painting etc.
complete. (For OD.R. & V.R.)
13 Providing and fixing Hectometer as per I.R.C.
17.00 No.s type design including lettering and painting etc. 356.50
complete. (ii) Fixing in C.C. 1:5:10
14 Informatory sings: Providing and fixing sing
boards made out of 2mm aluminium sheet; size
80 x 60cms. rectangle as per the design of IRC-
67-1977 pre treated with phospheting process &
acid teching; coated with one coat of
epoxyprimer and two coats of best qualityepoxy
paint; reflectorised with retro refiective sheeting
as per latest M.O.S.T. Specifications; 3.1m long
stand postand frame fabricated from suitable
2.00 No.s sizeiron angle of 35 x 35 x 3mm75x75x6mm as 3856.90
required; painted with best qualityepoxy
coatings in black and whitebends. the details of
symbol for eachboard shall details of symbol for
eachboard shall be as per the instruction
ofengineer in charge. The fixing at site shall be
in 1:2:4 CC block of size 45 x45 x 60cms. for
each leg. including excavation curing tec.
complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)..
15 Village name/ Bump Ahed sign :-Providing and
fixing sing boards made out of 2mm aluminium
sheet; size 90 x 60cms. rectangle as as per the
design of IRC-67-1977 pre treated with
phospheting process & acid etching; coated with
one coat of epoxy primer and
two coats of best quality epoxy paint;
reflectorised with retro refiective sheeting as per
latest M.O.S.T. Specifications; Letters and
numerals should be as per IRC-30-1968, 3.1m
4.00 No.s long (2 nos) stand post and frame fabricated 5045.36
from suitable size iron angle of 50 x 50 x 5mm
painted with best quality epoxy coatings in black
and white bends. the details of symbol or
inscription / numerals for each board shall be as
per the instruction of engineer in charge. The
fixing at site shall be in 1:2:4 CC block of size
45 x 45 x 60cms. for each leg. including
excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer
16 Direction sign (Junction board):-Providing and
fixing sing boards made out of 2mm aluminium
sheet; size 244 x 122cms. rectangle as as per the
design of IRC-67-1977 pre treated with
phospheting process & acid etching; coated with
one coat of epoxy primer and
two coats of best quality epoxy paint;
reflectorised with retro refiective sheeting as per
latest M.O.S.T. Specifications; Letters and
numerals should be as per IRC-30-1968, 3.1m
3.00 No.s long (2 nos) stand post and frame fabricated 14831.71
from suitable size iron angle of 50 x 50 x5mm
75x75x6mm as required; painted with best
quality epoxy coatings in black and white bends.
the details of symbol or inscription / numerals
for each board shall be as per the instruction
of engineer in charge. The fixing at site shall be
in 1:2:4 CC block of size 45 x 45 x 60cms. for
each leg. including excavation curing etc.
complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
17 Chevron sign :-Providing and fixing sign boards
made out of1.5mm aluminium sheet / 3mm ACP
(Aluminum compositePanel); size 60x50cm
rectangular as per design ofIRC-67-2012. Pre
treated with phospheting process & acidetching;
coated with one coat of epoxy primer and two
coats ofbest quality epoxy paint ; reflectorised
with High IntensityPrismatic Grade retro
refiectivesheeting of Type-4 as perASTM D-
4956 and latest M.O.S.T.Specifications; 3.3 mtr
longstand post of Iron Angle 75 x 75 x 6mm /
65NB Circular MSPipe as required and frame
9.00 No.s fabricated from suitable size ironngle 3711.75
of35x35x3mm; painted with bestquality epoxy
coatingsin black and white bends. the details of
symbol or inscription /numerals for each board
shall be as per the instruction ofengineer in
charge. The fixing at site shall be in 1:2:4
CCblockof size 45 x 45 x 60 Cms. for each leg
includingexcavation, curing etc.complete under
the supervision ofengineer in charge. A warranty
for 7 years for the Retroreflective sheeting from
original manufacturer & a
18 Excavation for foundation up to 1.5m depth
including sorting out and stacking of useful
279.00 Cu.Mt material and disposing off the excavated stuff as 260.57
directed by Engineer in charge with all lead and
lift in (2) Dense or hard Soil.
19 Providing and filling in foundation with
ordinary Cement concrete M-100 mix and
37.20 Cu.Mt providing necessary vertical pin headers 3325.30
including formwork, vibrating, ramming and
20 curing complete.
Providing & filling in foundation with ordinary
cement concrete M 150 mix and providing
60.20 Cu.Mt necessary vertical pin headers including 3695.35
formwork vibrating ramming & curing complete.
21 Supplying and fixing reinforced concrete heavy
duty non-pressure pipes with collars for culverts
carrying heavy traffic as per IS 458-1991
15.00 Rmt specifications including setting the pipes in C.M. 3469.26
1:2 watering and laying (to level or slopes) of
class NP3 of following internal daimeters.(v)
22 Providing and fixing Guard stone as per I.R.C.
20.00 No. type design including white washing etc. 350.80
complete (II) Fixing in C.C. 1:5:10
23 Providing and fixing 20cm x 15cm x 2.5cm thick
year plate of marble stone set in C.M. 1:4
including Finishing and engraving letters, etc.
24 White washing with lime on wall surface (two
coats) to give an even shade including
thoroughly booming the surface to remove all
dirt, dust; mortar drops and other foreign matter.
25 Providing and laying - Fitter Media 600mm
266.00 Sq.mt. thick directed at the back of abutments, returns 1311.18
and wing walls as per detailed specifications
26 Providing and fixing in position ISI mark TMT
(Fe-500) bar for temperature reinforcement for
mass concrete pier/abutment returns including
cutting bending and tying as required complete
27 Providing weep holes in abutment, returns using
100 mm. dia A.C. pipe with C.I. grating
266.00 No including cutting, placing the pipe in required 89.20
slope and position as directed etc. complete. (As
per detailed specification)
28 Earth work for embankment including breaking
clods dressing with all lead & lifts and including
watering rolling and consolidation of sub grade
in layers of O.M.C. to required dry density
including filling in depressions which occure
during the process using vibratory roller 80 to
100 KN (A) From Borrow Pits Within Land
Width Having C.B.R. More than 5.00%
29 Providing and casting in situ ordinary cement
concrete M-150 mix and providing necessary
444.20 Cum. pin headers including shuttering, scafolding, 3988.04
laying, vibrating, curing and finishing complete
without V-groves. (A) Height from 0.0 M to
Rs. One Corer Fifty Two Lack Seventy One Thousand Six Hundred Eighty Eight and Paise Twelve Only.
I/We am/are willing to carry out the work at ________________ % above/below ( percent should be
written in figures and in words ) of the estimated rates mentioned above. Amount of my/our tender works out as
*Estimated amount *Estimated amount
put to tender Rs. 15271688.12 put to tender Rs.
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note : Credit Amount of Rs.41070 of Serviceable Material shall be deducted from 1st Running Bill.
Note 1:- The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
Note 2 :- The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3:- GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4:- In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
Signature of Bidder
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs - SBD with Index_11zon (5).pdf
5. GR Performance Bond and Bitumen date.pdf
4. Final GR and Special Attention To Tender.pdf
3. SOM and Monitoring Formats (Uploading attachment).pdf
2. ESMP Table and Protection Clause.pdf
1. Clauses-Terms and Conditions of Contract-B1-04.09.2017 (1).pdf
6. GR.pdf
Road Testing.pdf
Environment GR_11zon.pdf
Performance Bond and Bitumen date.pdf
05-GR.pdf
WhatsApp Image 2026-08-21 at 1.09.32 PM.pdf
00-FRONT PAGE.pdf
04- SPECIFICATION.pdf
SBD.pdf
Schedule-BOQ PKG-6.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].