Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹3.9 Cr+₹7.1 L (1.83%)Rejected-Finance | L2 | Rejected-Finance As per financial evaluation |
| Sl No | Description | Qty | Unit | VINAY KUMAR SINGH L1 | Radheshyam Dubey L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of old V.R.B. and proper disposal including all cost of materials,T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 650.97 | Cum | 499 ₹3,24,834.03 | 400.7 ₹2,60,843.68 Lowest |
| 2.00 | Dismantling of old & damage Reinforced cement concrete work and its proper disposal including all cost of materials, T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 131.84 | Cum | 690 ₹90,969.6 | 527.25 ₹69,512.64 Lowest |
| 3.00 | Earth work in filling for making diversion with all lead & lift including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 12,020.3 | Cum | 95 ₹11,41,928.5 Lowest | 110.7 ₹13,30,647.21 |
| 4.00 | Earth work in excavation of foundation of culvert & tail wall including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 3,922.33 | Cum | 49 ₹1,92,194.17 Lowest | 59.75 ₹2,34,359.22 |
| 5.00 | Laying C.C. 1:2:4 (M15) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20mm to 40mm) including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications. | 202.51 | Cum | 8,800 ₹17,82,088 | 8,595.8 ₹17,40,735.46 Lowest |
| 6.00 | Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (4.75mm to 20mm.) for Slab, pier cap & parapet including all cost of materials,T&P and labours and other accessories required for proper completion of work as per direction of direction of Engineer in Charge. | 2,429.72 | Cum | 8,700 ₹2,11,38,564 Lowest | 9,417 ₹2,28,80,673.24 |
| 7.00 | Centering and shuttering for Plain Cement Concrete work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 314.31 | Sqm | 149 ₹46,832.19 | 147.6 ₹46,392.16 Lowest |
| 8.00 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 4,766.06 | Sqm | 850 ₹40,51,151 Lowest | 913.9 ₹43,55,702.23 |
| 9.00 | Providing and laying Steel as Reinforcement (TATA,SAIL or JINDAL) including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 100.36 | MT. | 69,000 ₹69,24,840 | 57,618.5 ₹57,82,592.66 Lowest |
| 10.00 | Earth work in removing diversion including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 4,528.65 | Cum | 49 ₹2,21,903.85 Lowest | 59.75 ₹2,70,586.84 |
Tender Value
Refer Docs
EMD Value
₹11.2 L
Closing Date
16 Sept 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
reconstruction of 26 damaged culverts on fulwariya Minor, Sahroja Minor, Sonadih Minor, Salempur Minor, Hathauj Minor, Jigirsar Minor, Badsari Minor, Badagaon Minor, and Mahli Minor in Ballia District.
2026_UPIDC_1168611_13
05/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Ballia
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹11.2 L
Yes
4 Nov 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old V.R.B. and proper disposal including all cost of materials,T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 650.97 | Cum | - | - |
| 2 | Dismantling of old & damage Reinforced cement concrete work and its proper disposal including all cost of materials, T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 131.84 | Cum | - | - |
| 3 | Earth work in filling for making diversion with all lead & lift including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 12,020.3 | Cum | - | - |
| 4 | Earth work in excavation of foundation of culvert & tail wall including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 3,922.33 | Cum | - | - |
| 5 | Laying C.C. 1:2:4 (M15) in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20mm to 40mm) including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications. | 202.51 | Cum | - | - |
| 6 | Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (4.75mm to 20mm.) for Slab, pier cap & parapet including all cost of materials,T&P and labours and other accessories required for proper completion of work as per direction of direction of Engineer in Charge. | 2,429.72 | Cum | - | - |
| 7 | Centering and shuttering for Plain Cement Concrete work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 314.31 | Sqm | - | - |
| 8 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 4,766.06 | Sqm | - | - |
| 9 | Providing and laying Steel as Reinforcement (TATA,SAIL or JINDAL) including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 100.36 | MT. | - | - |
| 10 | Earth work in removing diversion including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 4,528.65 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.73 MB
BID05_merged.pdf
Tender Documents • 1.92 MB
BOQ_2227351.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .