S.E Nayagada
SE, NAYAGADA IRRIGATION DIVISION, Nayagada
Protection to left bank service road of river Duanto from Badagorada to Bilagorada for the year 2026-27.
2026_CELBB_140656_9
BID IDENTIFICATION NO.SE_02_NGR_OF 2026-27
National Competitive Bid
Civil Works - Others
Percentage
NAYAGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹33,700
Yes
11 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area with all labour charges, T & P etc. required for the work including labour welfare cess etc. complete as per direction of the Engineer-in-charge | 18,000 | sqm | 2.9 | ₹52,200 |
| 2 | Earth work in suitable type of soil in approved borrow area, loading into transport vehicle manually or mechanically and transportation of earth by mechanical means and unloading the same over the approved surface of the embankment in proper profiles with all leads of 1 km, lifts,delifts including rough dressing and breaking the clods in to 5 cm to 7 cm size including removal of all roots, bushes from transported earth with all cost, carriage, royality, labour welfare cess and laying in layers not exceeding 22.50cm in depth including watering and oridinary compaction by sheep foot roller with hire and running charges of all labour, T & P, cost of fuel, lubricant, cost of labour, carriage, royality EMF, DMF, additional charges, cess, taxes, etc. all complete as per specification and direction of the Engineer-in-Charge. (Measurement will be taken on finished level section only and earth to be arrange by the contractor at his own cost and responsibility) | 9,044.5 | cum | 181.2 | ₹16,38,863.4 |
| 3 | Providing laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing and rolling with 3-wheeled steel roller 8-10 tonnes in stage to proper grade and camber applying and broming requisite type of screening / binding materials to fill up the interstices of cparse aggregate, watering and compacting to the required density and thickness of 100mm as per clause 404 of MOSRT & H.specification for Road and Bridge works (4th revision) etc. complete with cost, carriage, royality, taxes of all materials required for the work with all labour, T & P EMF,DMF and additional charge hire and running charges of all other machinaries etc. complete with labour welfare cess etc. complete as per the specification and direction of the Engineer-in-charge | 371.25 | cum | 3,750.9 | ₹13,92,521.63 |
| 4 | Collecting, supplying and stacking at worksite good quality moorum from approved quarry for pre-measurement in regular box heaps of 1.50m x 1.50m x 0.44m to be measured as one cum at a regular intervals and conveying from premeasured stacks spreading over the approved prepared surface road including cost, conveyance, royality, EMF,DMF, Addl. charges of materials watering in consolidation with PRR etc. complete with all labour T & P required for the work with labour welfare cess complete as per specification and direction of the Engineer-in-charge | 225 | cum | 1,246.8 | ₹2,80,530 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
Tendernotice_2.pdf
PDF • 4.08 MB
BOQ_608957.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .