| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC Agreement executed |
| 2 | 2₹1.2 Cr+₹1.4 L (1.20%)Rejected-AOC | ₹1.2 Cr+₹1.4 L (1.20%) | 2 | Rejected-AOC Work awarded to L1 |
| Sl No | Description | Qty | Unit | A V BALAKRISHNAN L1 | T.M CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Building | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 9.94 | cum | 3,149.5 ₹31,293.43 Lowest | 3,187.2 ₹31,668.02 |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 91.04 | sqm | 146.27 ₹13,317.01 Lowest | 148.02 ₹13,476.33 |
| 1.00 | OD3780/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Excess or less cement used as per design mix is not payable or recoverable .All work above plinth level up to floor V level | 201.09 | cum | 11,085.39 ₹22,29,127.82 Lowest | 11,218.08 ₹22,55,810.05 |
| 1.00 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 26,601.51 | kg | 96.43 ₹25,65,183.61 Lowest | 97.58 ₹25,95,775.35 |
| 1.00 | OD3778/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cmor nearest size in cement mortar 1:6 for superstructute above floor two level up to floor five level including all cost of materils,labour charges etc. | 148.21 | cum | 8,057.41 ₹11,94,148.45 Lowest | 8,153.85 ₹12,08,441.34 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 560.59 | sqm | 824.49 ₹4,62,196.73 Lowest | 834.36 ₹4,67,729.7 |
| 1.01 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 31.16 | cum | 7,840.37 ₹2,44,313.77 Lowest | 7,934.21 ₹2,47,237.92 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 472.52 | sqm | 654.35 ₹3,09,192.15 Lowest | 662.18 ₹3,12,891.97 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 140.8 | sqm | 876.55 ₹1,23,418.24 Lowest | 887.04 ₹1,24,895.23 |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
2 Mar 2026, 3:00 pmClosed
Superintending Engineer, Buildings North Circl
Superintending Engineer, Buildings North Circle
construction of additional floors with a total built-up area of 718.74 m2 comprising 10 classrooms, two staircases, and two toilet blocks on the second floor
2026_PWD_839771_1
PWD/BLDG/TR/7193/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
450 days
prapoyil
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,515
Yes
₹50,000
Yes
3 Jul 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 0.6 | sqm | - | - |
| 1.003 | OD3780/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Excess or less cement used as per design mix is not payable or recoverable .All work above plinth level up to floor V level | 0.8 | cum | - | - |
| 1.004 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
| 1.005 | OD3778/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cmor nearest size in cement mortar 1:6 for superstructute above floor two level up to floor five level including all cost of materils,labour charges etc. | - | cum | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.007 | 50.6.1.9:Solid block masonry using pre cast solid blocks( Factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.2 | sqm | - | - |
| 1.009 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1415294.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1415294.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .