Tender Value
₹35.1 L
EMD Value
₹40,000
Closing Date
5 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Addil Chief Engineer
“Construction Of Transformer Stacking Platform With Gantry Structure At Division Store Yard, Kalol.”(Reinvite)
365318
UGVCL/SBT CO/ CIVIL/ E-TENDER/ 23 /2026-27
Open
Civil Works
Works
Ahmedabad
13 documents required · 13 mandatory
₹1,180
Uttar Gujarat Vij Company Limited
₹40,000
5 Dec 2026
12 Nov 2026
7 Dec 2026
12 Nov 2026
25 Nov 2026
12 Nov 2026
180 days
Name Of Work : Construction Of Transformer Stacking Platform With Gantry Structure At Division Store Yard, Kalol
Description Qty. Unit Rate Amount
1 Demolition of Brick work and stone masonry including stacking of 66.00 CMT. 572.20
serviceable materilas and disposal of unserviceable materials with all lead
and lift.(ii) In Cement Mortar.
2 Demolition including stacking of serviceable materilas and disposal of 90.00 CMT. 1099.75
unserviceable materials with all lead and lift. (i) R.C.C. work
3 Dismentling steel work including distempering and stacking the materials 5500.00 Kg 3.81
with all lead and lift.
4 Excavation for foundation upto 1.5 m depth including sorting out and 139.00 CMT. 155.60
stacking of useful materials and disposing off the excavated stuff upto
Meter lead. (B) Dense or Hard soil
5 Providing and laying cement concrete 1:4:8 (1-Cement:4-coarse sand:8- 42.00 CMT. 2848.02
machine crushed stone aggregates 40 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and Plinth
6 Providing & Laying C.C. (1:1.5:3) for plain or R.C.C. work for Road 35.00 CMT. 4814.80
pavement, using 12mm. To 20mm. Size black trap machine crushed metal
including necessary centering for all sides as required , mixing the concrete
in mixer machine, ramming with Vibrator, including keeping the joints
between road panels & finishing the Honeycombed surface if any,
immediate finishing of Top layer of road with Trowel & spunch to create
anti skid hard surface with curing etc.. complete as per drawing &
specification, & as directed by E.I.C. with supply of cement by the
contractor. ( REINFORCEMENT IF ANY WILL BE PAID
7 Compaction and finishing of cement concrete road by trimix process 209.00 SMT. 51.87
providing extra labour charges for the trimix vaccume dewatering service
process on cement concrete road surface by using vacum dewatering pump
floater surface vibrator including making groves and rough finish to surface
including levelling etc complete as directed.
8 Providing TMT Bar FE 500D reinforcement for R.C.C. work including 3060.00 KG. 76.52
bending, binding and placing in position complete upto floor two level (upto
floor two level)
9 Filling available excavate dearth (excluding rock) in trenches. plinth, sides 139.00 CMT. 135.56
of foundation setc.in layers not exceeding 20 cm. in depth consolidating
each disposited layer by ramming and watering.
10 Filling in foundation & plinth with murrum or selected soil in layers of 65.00 CMT. 274.40
20cm. Thickness including watering, ramming and consolidating etc.
11 Providing & Laying ordinary cement concrete M-200 and curing complete 18.00 CMT. 4344.77
Excluding the cost of form work & reinforcement steel for reinforced
concrete work in (A) Foundations, footings of column & mass concrete.
Note: Cement consumption rate diff. added Rs.435.37 for ordinary concrete
12 Providing formwork of ordinary timber planking so as to give a rough finish 28.00 SMT. 180.26
including centering shuttering strutting and proping etc. Height of proping
and centering below supporting floor to ceiling not exceeding 4 M and
removal of the same for in situ reinforced concerete and plain concrete work
in (A) Foundation footing bases of columns etc and Mass concrete. (up to
13 Providing & Laying ordinary cement concrete M-200 and finishing smooth
with curing etc. complete including the cost of form work but excluding the
cost of reinforcement for R.C.C. work in (B) Columns. (up to floor two
level) Note: Cement consumption rate diff. added Rs.496.36 for ordinary
concrete to M-200.
iii) Column having cross sectional area more than 0.18 Sq.M (Up to floor 12.00 CMT. 8944.64
14 Brick work using common burnt clay building bricks having crushing 64.00 CMT. 4172.37
strength not less than 35kg./Sq.Cm. in foundation and plinth in Cement
Mortar1:6 (1-Cement: 6 -fine sand) (B) Conventional
15 20mm. Thick sand faced cement plaster (Tipani with Gutka) on ceiling, 115.00 SMT. 312.56
walls up to full height of structure above ground level consisting of
12mm.tThick backing coat of C.M. 1:3 ( 1 cement : 3 sand ) and 8 mm.
thick finishing coat of C.M. 1:1 ( ! Cement :1 sand) etc.. Complete.(for all
16 Steel work welded in built up sections,framed work including cutting, 126.00 Quintel 8750.00
histing, fixing in position and applying a priming coat of red lead paint :-
(A) In beams and joints channels angles, tees, flats with connecting cleats as
in main and cross beems, hip and jack reffers, purlins connected to common
raffers and the like.
17 Supply & fabrication of trolly for 5 MT capacity with wheels of 200 mm 4.00 NO. 15000.00
dia. Shafting & necessary bearing cover,bushing.gear wheel,hand wheel 12''
dia. With chain of required length including fixing of the same with trolly
frame of required size , incl. cost of all required materials etc. completed as
directed by EIC
18 Supply & Fabrication of pulley for 5.0 MT capacity @ 125mm dia and 2.00 NO. 4500.00
thickness to suit the movement on flange of gantry girder alongwith 25mm
dia. shafting & necessary bearing .bearing cover,bushing.incl.fixing of the
same with m.s.plate mounted assembly for movement of chain pully block
incl all required material etc. completed as directed by EIC
19 Painting two coats (including priming coat) on new steel and other metal 360.00 SMT. 127.35
surfaces with enamel paint, brushing interior to give an even shade including
cleaning the surface of all dirt, dust and othr foreign matter.
20 Wall painting two coats with weather proof acralic emulsion APEX type 115.00 SMT. 119.07
paint of approved brand & manufacture and of required shade on exterior
wall surface to give an even shade over and including a primery coat
with alkaly resistance primer of approved brand after throughly brushing
surface to remove all dirt and remains of loose powdered materials etc
comp. for all height.(R.A)
21 Design, supply & Manufacturing of Chain Hoist, having capapcity 5 Ton, 6 2.00 Nos. 85000.00
meter lifting height, 12mm, 80 Grade/2 Fall, 1 HP/1440 RPM hoist moter,
CT motor having 0.5 HP/110 RPM, 4-5 MPM hoisting speed, 12-14 MPM
CT Speed, SKF/FAG or equivalent make bearings, eletromagnetic disc type
hoist brake schneider make panel, push button operatiove mode with one
coat of red oxide and two coat of black mate-sky blue paint as directed by
22 Design, supply & Manufacturing of end carriage having wheel size 180/105 2.00 Nos. 75000.00
mm, open reduction type, 0.5 HP/1440 RPM, 2 no of gear motor, 12-14
MPM L.T Speed, 4 nos of rubber type buffers and pne coat of red-Oxide and
two coat of golden yellow colour paint as directed by EIC.
23 Erection & commissionong charges having span 7.5 mtr and for wiring LT- 2.00 Nos. 75000.00
30 mtr and CT-7.5 mtr.
Estimated Cost Rs.
B Bidder's offer (+/-) in %
C Grand Total [C = A + (A*B %)]
C Grand Total [C = A + (A*B %)]
D Add 1% Welfare cess on C
E Sub Total (Incl. Welfare Cess) E=C+D
F & Service Tax F = E x GST% i.e. 18%as applicable on the date of tender in amount Rs.
G Grand Total including GST------G=E+F
G Grand Total including GST------G=E+F
Final offer (in Rs.)
Final offer (Rs. in Words)
We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical specifications
put up by UGVCL on WEB site.
I/We hereby accept all the conditions and specifications of this tender document, and accordingly, I/We
am/are willing to carry out the work at quated rate as above.
Seal & Signature of Contractor Addl. Chief Engineer
UGVCL, CO, Sabarmati
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender notice.pdf
tech bid.pdf
Price bid.pdf
amendment kalol-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .