| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical MAIN ROAD PRAGATI VIHAR RISHIKESH DEHRADUN 249201 | DEHRADUN | UTTARAKHAND | 249201 | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
| 5 | Rejected-Technical U 10 20 DLF PHASE III GURGAON GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | Rejected-Technical Non-Responsive |
Tender Value
₹8.8 Cr
EMD Value
₹17.7 L
Closing Date
2 Jun 2026, 5:00 pmClosed
DGM(CnP)
Uri-II Power Station,Nowpora,Uri,Baramulla,JK
Lining work by steel ribs and reinforced cement concrete in the main access tunnel (MAT) of the power house of Uri -II Power Station, Baramulla, JK
2026_NHPC_908345_1
NH/Uri-II/CnP/26-27/174
Open Tender
Miscellaneous Works
Works
334 days
Uri-II Power Station, Nowpora, Uri, JK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
NHPC Limited
₹17.7 L
Yes
16 Sept 2026
13 May 2026
11 Jun 2026
13 May 2026
2 Jun 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Hard Rock (Blasting Prohibited). | 10.7 | Cum | 1,226.57 | ₹13,124.27 |
| 2 | Dismantling steel work manually/by mechanical means in built up sections without dismembering and stacking within 50 meters lead as per direction of Engineer-in-charge. | 100 | Kg | 3.04 | ₹304.26 |
| 3 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead. (a) G.S. Sheet. | 252.11 | Sqm | 136.21 | ₹34,340.99 |
| 4 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded. | 1,980.94 | Kg | 151.06 | ₹2,99,244.5 |
| 5 | Providing and fixing grouted bar 25mm dia upto 3m long. | 3,032 | Metre | 1,175.46 | ₹35,63,987.24 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 79,195.28 | Kg | 134.68 | ₹1,06,66,329.86 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Arches, domes, vaults upto 6 m span. | 5,818.04 | Sqm | 2,478.89 | ₹1,44,22,279.06 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Extra for arches, domes, vaults exceeding 6 m span. | 5,681.39 | Sqm | 1,215.81 | ₹69,07,479.36 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 2,064.27 | Sqm | 683.45 | ₹14,10,831.13 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 216.4 | Sqm | 627.6 | ₹1,35,812.68 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tender_Document.pdf
Tender Documents • 3.51 MB
BOQ_954690.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .