Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC | ₹4.6 Cr | L1 | Accepted-AOC valid documents submitted L1 |
| 2 | L2₹4.7 Cr+₹6.0 L (1.30%)Rejected-AOC | ₹4.7 Cr+₹6.0 L (1.30%) | L2 | Rejected-AOC valid documents submitted L2 |
| 3 | L3₹5.0 Cr+₹38.6 L (8.36%)Rejected-AOC | ₹5.0 Cr+₹38.6 L (8.36%) | L3 | Rejected-AOC valid documents submitted L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical invalid documents submitted |
Tender Value
₹5.1 Cr
EMD Value
₹2 L
Closing Date
20 Jul 2024, 5:00 pmClosed
Sunil Raj D
O/o The Superintending Engineer, Irrigation South Circle, Opp. Lourde Church , Pattom Palace P.O., P.M.G.,Tvpm
GENERAL Desilting Side Stabilization Work Deepening formation of bund and stabilization by using Geotextile in Achenkovil river from Thuruthel bridge to Mundattinkara thodu of Veeyapuram panchayath in Kuttanad LAC General Civil Work
2024_Irrig_678644_1
IRR/IA/TR/8801/2022_5_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
270 days
Veeyapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹13,010
Yes
₹2 L
Yes
O/o The S.E., Irrigation South Circle Tvpm
13 Nov 2024
1 Jul 2024
23 Jul 2024
1 Jul 2024
20 Jul 2024
8 Jul 2024
1 Jul 2024 - 20 Jul 2024
8 Jul 2024
Amount
Deepening and formation of Bund using Coir geotextile
OD38212/2023-2024:Removing water weeds such as hyacinth,grass etc by rooting out small trees and all other debris using ambhibius excavator where ever necessary including conveying the debris from the site and disposing the same by conveying debris to contractors own place of choice with all charges of loading, unloading, transportation etc complete and disposing the same suitably without causing any harm to the environment etc complete as per the direction of deptl. officers at site.
OD28297/2022-2023:Earth work in excavation for removal of silt by mechanical means using sophisticated equipment like amphibious excavator or any equivalent mechanical equipment with necessary accessories like transport barges, mechanized boats etc as appropriate and as directed for desilting rivers, to the desired depth to ensure free flow in the river including getting out and formation of bund using the desilted material with proper compaction including necessary lead as directed by Engineer-in-charge. The rate shall include disposal of excavated earth/clay temporary storage of all materials on the banks or other suitable locations by means of loaders/tippers/mechanized boats etc as appropriate as directed, all the charges for labour, equipments, conveyance of materials, incidentals complete as per the directions of the Engineer in Charge.
OD38395/2023-2024:Supplying, stacking and laying coir geo-textiles type H2M5(unit weight-740g/sqm,mesh size 7.57mmX8.04 mm having a yarn diameter 3.5 mm and tensile strength of 4.2-1.3cN/tex) made from cocounut fibre extracted from the husk of cocunut , developed for specific civil engineering application like erosion control ,ground improvement filteration,drainage,river bank protection ,road pavements,slope stabilization etc. The standard of coir geo-textile shall confirm with IS 15868(part 6): 2008 and IS 15340:2003. The coirgeotextile shall be layed and fixed using appropriate J clip/bamboo stakes and plastering the sides with excavated mud, then planting anti erosion plants/grass as a mode of ecofriendly bank protection. The bamboo clip shall be made from smaller secondary branches with nail (eye bud)originating from the node having a minimum length of 20cm. The type of bamboo shall be of bambusa bamboos or similar spieces having good anchoroage with the ground. Bamboo clip shall be used max 1metre interval in both direction. The coir geotextile shall be firmly sticked to the soil in line and level as per direction of site officer incharge. In no case it shall be losened,additional strengthening of clamping shall be made at the edges of the coir geotextile as directed by Engineer -in -Charge.
Side Protection using Pile and slab
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5937/2024-2025:Providing and conveying Pre-cast reinforced cement concrete piles of specified size in M-30 cement concrete to carry safe working load not less than specified, including centering, shuttering, etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of the pile cap). 500 mm x 350 mm piles.
OD5939/2024-2025:Supplying and fixing CI pile shoe, MS clamp and bolts for fixing precast concrete piles including all cost of materials and labour charges etc complete. Shoe size 350 mm x 500 mm. Based on approved data number 206 new 22.
OD5941/2024-2025: Driving and installing Pre-cast reinforced cement concrete piles of any size and length in M-25 cement concrete , etc. complete ( Based on DSR 60.5.1 )
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD5944/2024-2025:Providing and laying in position machine batched and machine mixed design mix M- 30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions asper IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work up to plinth level.
OD5945/2024-2025:Protecting the filled earth from seepage through the joints of precast slab using Geo fabric filter GWF -26- 130 as per the direction from the departmental officers at site including all cost of material , labour , conveyance and all other incidentals charges involved etc complete.
Construction of Retaining wall on either side of bathing ghats
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
OD42431/2023-2024:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Construction of Bathing Ghat
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Survey and Demarcation
60.11.5:Providing BOUNDARY STONE .- 30*30*75 cm of hard stone 15cm chiseled dressed on all four sides including top including earthwork excavation and levelling course.
OD42434/2023-2024:Hiring a 4 seated fibre boat with outboard engine as and when directed by the Engineer- in-charge for inspection
PK CONSTRUCTIONS
TBAS Infrastructure Pvt Ltd.
Bidder Name
N.V.RAJU
TBAS Infrastructure Pvt Ltd.
PK CONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .