| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 CrAccepted-AOC 4B TOWN SQUARE CHINAR PARK RAJARHAT KOLKATA 700 136 | ₹33.3 Cr | L1 | Accepted-AOC Work Awarded |
| 2 | L2₹33.4 Cr+₹17.5 L (0.53%)Rejected-Finance | ₹33.4 Cr+₹17.5 L (0.53%) | L2 | Rejected-Finance As per recommendation of the committee also as per approval from the competent authority. |
| 3 | L3₹33.5 Cr+₹22.7 L (0.68%)Rejected-Finance | ₹33.5 Cr+₹22.7 L (0.68%) | L3 | Rejected-Finance As per recommendation of the committee also as per approval from the competent authority. |
| 4 | L4₹33.5 Cr+₹27.7 L (0.83%)Rejected-Finance 4863 DUKLI AGARTALA WEST TRIPURA PIN 799004 | WEST TRIPURA | TRIPURA | 799004 | ₹33.5 Cr+₹27.7 L (0.83%) | L4 | Rejected-Finance As per recommendation of the committee also as per approval from the competent authority. |
| 5 | L5₹33.5 Cr+₹28.3 L (0.85%)Rejected-Finance | ₹33.5 Cr+₹28.3 L (0.85%) | L5 | Rejected-Finance As per recommendation of the committee also as per approval from the competent authority. |
| Sl No | Description | Qty | Unit | M/S SHREE BAJRANG BALI CONTRACT COMPANY L4 | TRIBENI CONSTRUCTIONS LIMITED L1 | Balaji Industrial and Agricultural Castings Pvt Ltd L5 | TAJ CONSTRUCTION L2 | SSB CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Land Development | ||||||||
| 1.00 | Excavation in soil by manual means
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300. | 4,182.18 | cum | 229 ₹9,57,719.22 Lowest | 260 ₹10,87,366.8 | 350 ₹14,63,763 | 232.23 ₹9,71,227.66 | 264 ₹11,04,095.52 |
| 1.00 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300. | 12,546.53 | cum | 46 ₹5,77,140.38 Lowest | 58.1 ₹7,28,953.39 | 250 ₹31,36,632.5 | 51.13 ₹6,41,504.08 | 59 ₹7,40,245.27 |
| 1.00 | Construction of Embankment with Material deposited from Roadway Cutting
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300.2 and as per MoRT&H Technical Specification clauses of section 300. | 3,641.56 | cum | 128 ₹4,66,119.68 | 130 ₹4,73,402.8 | 650 ₹23,67,014 | 125.4 ₹4,56,651.62 Lowest | 142.5 ₹5,18,922.3 |
| 1.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.-All kinds of soil | 11,104.96 | sqm | 14 ₹1,55,469.44 | 4.8 ₹53,303.81 Lowest | 25 ₹2,77,624 | 15.93 ₹1,76,902.01 | 20 ₹2,22,099.2 |
| 2.00Landscaping | ||||||||
| 2.00 | Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRT&H Technical Specification Clause 201. | 0.1 | hectare | 25,654 ₹2,565.4 Lowest | 28,638.7 ₹2,863.87 | 1,70,000 ₹17,000 | 35,241.62 ₹3,524.16 | 30,000 ₹3,000 |
| 2.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.
-All kinds of soil | 950 | Sqm | 14 ₹13,300 Lowest | 18.1 ₹17,195 | 25 ₹23,750 | 15.93 ₹15,133.5 | 20 ₹19,000 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | 213 | cum | 165 ₹35,145 | 231.6 ₹49,330.8 | 225 ₹47,925 | 158.31 ₹33,720.03 Lowest | 180 ₹38,340 |
| 2.00 | Extra rates for quantities of works, executed:
In or under water and/ or liquid mud, including pumping out water as required.20% per meter | 177 | metre depth | 224 ₹39,648 | 35.98 ₹6,368.46 | 150 ₹26,550 | 31.68 ₹5,607.36 Lowest | 40 ₹7,080 |
Tender Value
Refer Docs
EMD Value
₹37.6 L
Closing Date
18 Oct 2025, 3:00 pmClosed
Project Director(ADB Project)
Office of the Managing Director, TIDC Ltd., Shilpa Nigam Bhawan, Khejurbagan, Agartala, West Tripura.
Construction and Maintenance of Land Development Landscaping Road and Stormwater Drainage Water Supply Common Infrastructure Industrial Safety and Security etc at Kumarghat and Dharmanagar Industrial Estates PACKAGE 10
2025_TIADB_65116_1
20/TIDC/ENGG/PNIeT/2025-26,
Open Tender
Civil Works - Others
Item Rate
3106 days
Kumarghat and Dharmanagar IEs
Please refer tender documents
8 documents required · 8 mandatory
₹10,000
₹37.6 L
TIDC Conference Hall
30 Mar 2026
30 Aug 2025
18 Oct 2025
30 Aug 2025
18 Oct 2025
8 Sept 2025
30 Aug 2025 - 8 Sept 2025
6 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Land Development | - | - | - | - |
| - | Excavation in soil by manual means
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300. | - | cum | - | - |
| - | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300. | - | cum | - | - |
| - | Construction of Embankment with Material deposited from Roadway Cutting
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300.2 and as per MoRT&H Technical Specification clauses of section 300. | 1 | cum | - | - |
| - | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.-All kinds of soil | 1 | sqm | - | - |
| 2 | Landscaping | - | - | - | - |
| - | Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRT&H Technical Specification Clause 201. | 1 | hectare | - | - |
| - | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.
-All kinds of soil | - | Sqm | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | - | cum | - | - |
| - | Extra rates for quantities of works, executed:
In or under water and/ or liquid mud, including pumping out water as required.20% per meter | - | metre depth | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 8.79 MB
AnnexureCombinedPkg10FINAL.pdf
Additional Documents • 12.73 MB
DRAWINGPKG10DMR.pdf
Additional Documents • 5.56 MB
DRAWINGPKG10KGTpt1.pdf
Additional Documents • 18.21 MB
DRAWINGPKG10KGTpt2.pdf
Additional Documents • 18.93 MB
BOQ_66275.xls
BOQ • 0.92 MB
FinalSBDPkg10.pdf
Tender Documents • 3.52 MB
Corrigendum3PKG10.pdf
PDF • 0.26 MB
TimelineCorrigendumPkg081020.pdf
PDF • 0.28 MB
Corrigendum2Pnit20ADB081020.pdf
PDF • 0.92 MB
Package81020corrigendum.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .