Tender Value
₹4.1 L
EMD Value
₹4,200
Closing Date
18 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat (R&B) Division, Dang - Ahwa
Construction of Smashanbhumi shed at Village pipalpada Ta. Ahwa Dist. Dangs.
300509
54 (2nd Attempt) OF 2025 - 26
Open
Civil Works - Buildings
Dang
6 documents required · 6 mandatory
₹600
Executive Engineer, Panchayat (R & B) Division, Ahwa
₹4,200
2 May 2026
2 May 2026
2 May 2026
18 May 2026
2 May 2026
It. Rate In
Specification and reference to book of Quantity Unit Amount
No. Figures
specifications)
1 Excavation for foundation upto 1.5 m depth 7.13 Cum. 275.33
including sorting out and stacking of useful
materials and disposing off the excavated
stuff upto 50 Meter lead.(B) Dense or Hard
2 Filling available excavated earth (excluding 3.57 Cum. 137.47
rock in trenches plinth, slides of foundations
etc. in layers not exceeding 20 cm in depth
consolidating each deposited layer by
ramming and watering)
3 Filling in foundation and plinth with murrum or 15.86 Cum. 304.60
including watering ramming and consolidating
etc. complete
4 Providing and laying cement concrete 1:2:4 6.72 Cum. 3824.11
(1- Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork in
(A) Foundation and Plinth (more than 10 ton)
5 Providing and laying controlled cement 1.40 Cum. 4807.71
concrete M.200 and curing complete the cost
of formwork but excluding reinforcement for
reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass
concrete. (more than 10 ton)
6 Providing and laying controlled cement 0.29 Cum. 9124.10
concrete M-200 and curing complete
including the cost of form work but excluding
cost of reinforcement for reinforced concrete
work for Column upto plinth level.
7 Providing and laying controlled cement 2.05 Cum. 6507.63
concrete M.200 and curing complete the cost
of formwork but excluding reinforcement for
reinforced concrete work in (D) Columns,
Pillars posts and struts, upto floor two level.
(more than 10 ton
8 Brick work using common burnt clay building 0.68 Cum. 4279.99
brick having crushing strength not less than
35 kg/sq. cm. in foundation and plinth in
cement mortar 1:6 ( 1 Cement: 6 fine sand)
(B) Convention
9 Providng TMT bars renforcement of FE 500 / 730.06 kg 77.29
500D for R.C.C. work including bending
binding and placing in position complete for
all floor.
10 Providing and laying controlled cement 0.32 Cum. 9124.13
concrete M.200 and curing complete the cost
of formwork but excluding reinforcement for
reinforced concrete work in (D) Columns,
Pillars posts and struts, upto floor two level.
(more than 10 ton)
11 Brick work using common burnt clay building 6.04 Cum. 4575.58
brick having crushing strength not less than
35 kg/sq. cm. in super structure above plinth
level up to floor two level in cement mortar 1:6
( 1 Cement: 6 fine sand) (B) Convention for
12 Steel work, welded in built up sections 13.50 Qui 9108.49
framed work including cutting, hoisting, fixing
in position and applying a priming coat of red
lead paint. (D) In trussses and trussed purlins,
upto 25 M. span and 15 M. ovarall height.
13 Providing corrugated G.I. sheet of class-3 82.03 Cum. 734.19
roofing fixed with glavanished iron J or L
Hooks, Bolts and nuts 8mm diameter with
bitumen and G.I. limpet washer or G.I. limpet
washer. filled with white lead complete
excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
14 Providing 15mm thick cement plaster in 26.60 sqmt 239.93
single coat on Rough (Similar)side of single or
half brick walls for interior plastering upto floor
two level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand)
15 20 mm thick sand faced cement plaster with 37.86 sqmt 365.96
on wall upto all height above ground level
consisting 12 mm thick backing coat of c.m.
1:3 (1 cement : 3 sand ) and 8 mm thick
finishing coat of cm 1:1 (1 cement : 1 sand)
etc. complete.all height etc. complete
16 Providing and laying polished Kota stone 57.27 sqmt 1019.40
slab flooring over 20mm (Average) thick base
of cement mortar 1:6 (1-cement : 6-coarse
sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse
sand) laid over and jointed with grey cement
slurry mixed with pigment to match the shade
of slab including rubbing and polishing etc.
complete. (A) 25mm thick
17 Finishing wall with water proofing cement 37.86 sqmt 122.14
paint of on wall surface ( Two coats) to give
an approved brand manufacture and of
requred shape even shade after throughtly
brushing of loose powered materials.
18 Wall painting (two coats) with plastic 26.60 sqmt 91.17
emulsion paint of approved brand and
manufacture with on undecorated wall surface
to give an even shade including throughly
brushing the surface free from mortar
droppings and other foreign matter and sand
papered smooth along ceilings and sloping
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be
written in figures and words) of the estimated rate mentioned above Amount of my / our tender works
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
Net Rs. …………………….… Total Rs. ………….…….................
In words ………………….……………………………. In words ………………….……………………….
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by
the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt
G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where the reisa change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B) Sub Division Panchayat (R & B) Division
Ahwa Dang
Signature of the contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2 Side Print building booklet.pdf
BOQ Shed Pipalvada Smashan.pdf
GR-compressed.pdf
SBD Shed Pipalvada Smashan.pdf
Download all tender documents and submit your bid