| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹38.9 L+₹1.9 L (5.04%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹39.2 L+₹2.2 L (5.88%)Rejected-Finance | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹39.7 L+₹2.7 L (7.23%)Rejected-Finance | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹40.1 L+₹3.1 L (8.28%)Rejected-Finance INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | M/s. Vimal Enterprise L2 | Sukhi Electricals L9 | M/s Jagdish Machinery Stores L10 | Jyoti Refrigeration L3 | JAMNAGAR ELECTRIC AND MACHINERY CO L1 | SIBS CONTRACTOR L8 | S t modi L4 | Hirachand Sunderji and co L6 | M/s Balaji Enterprise L7 | k s enterprises L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Notes for Water Supply Work related items of Schedule 'A' :- (i) The water supply line repair work to be carried out both in Defence Cantt as well as in Civil area in any description and in different locations in full / part. (ii) It is the responsibility of the Contractor to ensure that repair work is nowhere hampered during any stage i.e. currency of contract as such contractor shall prepare well in advance by liaisoning with concerned State / Central department authorities under whose jurisdiction it lies, in no case work to be stopped in half way for want of permission etc in case necessary fee if any shall be borne by the contractor for which no payment shall be reimbursed. (iii) Necessary barricade, diversion boards and necessary safety signs etc as per safety norms shall be made & arranged by Contractor without any extra cost to Govt. (iv) During execution damage occurred to any sort structure etc the same shall be made good to its original specification by the contractor without any extra cost to Govt. (v) In case of road cutting inside Defence Cantt is inevitable the same shall be cut to required size and shape only after obtaining written approval of Engineer-in Charge, in no case road cutting be done without written approval of EIC. Vice versa if road cutting in Civil area is inevitable in that case necessary prior permission to be obtained by the contractor from concerned Govt authorities. In case of any fees etc the same shall be borne by the contractor without any extra cost to Govt. The road cutting shall be measured and paid separately under relevant items. (vi) Work shall be commencement and completed within the time slots allotted by EIC to the contractor for the said work. Notes Cond/- | |||||||||||||
| 1.01Notes for Water Supply Work related items of Schedule 'A' Contd :- (vii) Engineer-in-Charge shall strictly ensure that the Work shall be carried out in batch wise portion of pipe line for replacement and span and ensure batch work shall be completed by contractor on the same day and pipe line shall be made ready for regular water supply in case the same is inescapable alternative / temporary arrangement shall be made by the contractor without any extra cost to Govt as directed by EIC so that regular water supply shall not be hampered. (viii) Excavation and earth work shall be measured and paid for separately unless specifically mentioned in respective item. (ix) Quoted rate for various items in BOQ shall deemed to be inclusive as said in above Notes, no extra payment what so ever shall be entertained by the department. | |||||||||||||
| 2.00 | Demolition of brickwork/PCC block or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. | 21 | Cubic Metre | 500 ₹10,500 | 420 ₹8,820 Lowest | 695 ₹14,595 | 600 ₹12,600 | 650 ₹13,650 | 618 ₹12,978 | 592 ₹12,432 | 810 ₹17,010 | 810 ₹17,010 | 709 ₹14,889 |
| 3.00 | Surface excavation not exc 30 cm deep and averaging 15 cm deep & getting out in any type of soil (i.e. soft/ loose or hard/ dense soil) complete all as specified and as directed. | 467 | Square Metre | 55 ₹25,685 | 37 ₹17,279 Lowest | 64 ₹29,888 | 58 ₹27,086 | 70 ₹32,690 | 60 ₹28,020 | 72 ₹33,624 | 80 ₹37,360 | 82 ₹38,294 | 70 ₹32,690 |
| 4.00 | Excavating over areas, not exc 1.5 m deep and getting out in any type of soil complete all as specified & as directed. | 2 | Cubic Metre | 660 ₹1,320 | 630 ₹1,260 | 765 ₹1,530 | 750 ₹1,500 | 500 ₹1,000 Lowest | 774 ₹1,548 | 753 ₹1,506 | 820 ₹1,640 | 910 ₹1,820 | 837 ₹1,674 |
| 5.00 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in any type of soil (i.e. soft/ loose or hard/ dense soil) complete all as specified and as directed. | 605 | Cubic Metre | 380 ₹2,29,900 Lowest | 504 ₹3,04,920 | 562 ₹3,40,010 | 510 ₹3,08,550 | 510 ₹3,08,550 | 528 ₹3,19,440 | 521 ₹3,15,205 | 555 ₹3,35,775 | 548 ₹3,31,540 | 534 ₹3,23,070 |
| 6.00 | All as per item No. 5 here-in-above but exc 1.5 m and not exc 3.0 m in depth -do- | 8 | Cubic Metre | 490 ₹3,920 Lowest | 520 ₹4,160 | 584 ₹4,672 | 553 ₹4,424 | 550 ₹4,400 | 571 ₹4,568 | 553 ₹4,424 | 636 ₹5,088 | 619 ₹4,952 | 591 ₹4,728 |
| 7.00 | Returning, filling in trenches, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soil complete all as specified and directed. | 552 | Cubic Metre | 90 ₹49,680 Lowest | 137 ₹75,624 | 136 ₹75,072 | 135 ₹74,520 | 110 ₹60,720 | 140 ₹77,280 | 134 ₹73,968 | 141 ₹77,832 | 143 ₹78,936 | 140 ₹77,280 |
| 8.00 | Removing excavated surplus soil to a distance not exceeding 50 mts and depositing where directed at a level not exceeding 1.5 M above the starting point complete all as directed. | 133 | Cubic Metre | 190 ₹25,270 | 236 ₹31,388 | 248 ₹32,984 | 273 ₹36,309 | 160 ₹21,280 Lowest | 281 ₹37,373 | 272 ₹36,176 | 333 ₹44,289 | 325 ₹43,225 | 301 ₹40,033 |
| 9.00 | M&L for broken stone or boulders hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and as directed. | 10 | Cubic Metre | 900 ₹9,000 Lowest | 1,040 ₹10,400 | 1,065 ₹10,650 | 1,045 ₹10,450 | 1,400 ₹14,000 | 1,081 ₹10,810 | 1,053 ₹10,530 | 1,122 ₹11,220 | 1,115 ₹11,150 | 1,091 ₹10,910 |
Tender Value
₹34.5 L
EMD Value
₹68,900
Closing Date
23 Mar 2026, 6:00 pmClosed
GE (I) Navy Jamnagar
INS Valsura, Jamnagar - 361 150
Special repairs to Bedi water supply system and pumping lines at various locations and Addition/ Alteration to Incinerator at certain locations at INS Valsura, Jamnagar
2026_MES_755095_1
8934/VAL/E8
Open Tender
Civil Works - Others
Item Rate
150 days
GE (I) Navy Jamnagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE (I) Navy Jamnagar
₹68,900
Yes
1 Apr 2026
3 Mar 2026
25 Mar 2026
3 Mar 2026
23 Mar 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Demolition of brickwork/PCC block or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of entire debris as ordered outside MoD land complete all as specified and as directed. | 21 | Cubic Metre | - | - |
| 3 | Surface excavation not exc 30 cm deep and averaging 15 cm deep & getting out in any type of soil (i.e. soft/ loose or hard/ dense soil) complete all as specified and as directed. | 467 | Square Metre | - | - |
| 4 | Excavating over areas, not exc 1.5 m deep and getting out in any type of soil complete all as specified & as directed. | 2 | Cubic Metre | - | - |
| 5 | Excavating in trenches, not exc 1.5 metre wide and not exc 1.5 metre in depth, for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. laying cables, pipes, etc. not exc 10 Sqm on plan & not exc 1.5m in depth and getting out in any type of soil (i.e. soft/ loose or hard/ dense soil) complete all as specified and as directed. | 605 | Cubic Metre | - | - |
| 6 | All as per item No. 5 here-in-above but exc 1.5 m and not exc 3.0 m in depth -do- | 8 | Cubic Metre | - | - |
| 7 | Returning, filling in trenches, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soil complete all as specified and directed. | 552 | Cubic Metre | - | - |
| 8 | Removing excavated surplus soil to a distance not exceeding 50 mts and depositing where directed at a level not exceeding 1.5 M above the starting point complete all as directed. | 133 | Cubic Metre | - | - |
| 9 | M&L for broken stone or boulders hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed to a true surface complete all as specified and as directed. | 10 | Cubic Metre | - | - |
| 10 | M&L for PCC 1:4:8 type D2 (using 40 mm graded crushed stone aggregate) as in foundations, filling and mass concrete complete all as specified and as directed. | 13 | Cubic Metre | - | - |
| 11 | M&L for cement concrete 1:2:4 type B1, using 20mm graded crushed stone aggregate as in lintels upto 1.5m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, roof kerbs, mud stops, coved fillets and the like including weathering, slightly rounded, chamfered angle and throating as directed including use and waste of form work (straight or curved) all exposed surface of concrete finished fair complete all as specified & as directed. | 26 | Cubic Metre | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8934TENDER.pdf
Tender Documents • 1.02 MB
BOQ_845731.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .