| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-AOC 6 RAMESHWAR COMPLEX OPP OSCAR CITY SADHU VASVANI ROAD RAJKOT 360007 | RAJKOT | GUJARAT | 360007 | L1 | Accepted-AOC Meeting NIT Criteria | |
| 2 | L2₹33.2 L+₹6.8 L (25.7%)Rejected-Finance 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | L2 | Rejected-Finance Meeting NIT criteria | |
| 3 | L3₹34.3 L+₹7.8 L (29.6%)Rejected-Finance FLAT NO 201 LAXMI PARK NIWAS BT KAWADE ROAD GHORPADI PUNE 411036 | PUNE | MAHARASHTRA | 411036 | L3 | Rejected-Finance Meeting NIT criteria | |
| 4 | Rejected-Technical | - | Rejected-Technical Not Meeting NIT Criteria | |
| 5 | Rejected-Technical B 71 ASHISH ROW HOUSE 395009 RANDER SURAT GUJARAT 395009 | SURAT | GUJARAT | 395009 | - | Rejected-Technical Not Meeting NIT Criteria |
Tender Value
₹38.5 L
EMD Value
₹76,953
Closing Date
16 Jun 2022, 3:00 pmClosed
Sh J S Deshmukh
Rajkot Airport, Rajkot
Comprehensive Maintenance Contract of Air-conditioners, Water Coolers, Centralized R.O. System and Operation of Centralized R.O. System at C.A. Rajkot for 2 years (Year 2022-24).
2022_AAI_116790_1
AAI/RAJ/SM (E-E)/NIT-05/22-23
Open Tender
Electrical Works
Works
730 days
Rajkot
As per NIT
15 documents required · 15 mandatory
₹1,180
Yes
₹76,953
Yes
29 Aug 2022
25 May 2022
17 Jun 2022
25 May 2022
16 Jun 2022
25 May 2022
25 May 2022 - 15 Jun 2022
Amount
Comprehensive maintenance of 1.5 ton split type A/C for one month as per the special condition attached. (No. of AC 25 X 24 months = 600)
Comprehensive maintenance of 1.5 ton split type A/C for one month as per the special condition attached [Compressor under warranty]. [(No. of AC 43 X 24 months + 12 X 14 months = 1200)
Comprehensive maintenance of 2 ton split type A/C for one month as per special condition attached. (No. of AC 21 X 24 months = 504)
Comprehensive maintenance of 2 ton split type A/C for one month as per special condition attached [Compressor under warranty]. (No. of AC 9 X 24 months + 17 X 14 Months = 454)
Comprehensive maintenance of 3 ton 3 phase tower type A/C for one month as per special condition attached. (No. of AC 1 X 24 months = 24)
Comprehensive maintenance of 3 ton 3 phase cassette type A/C for one month as per special condition attached. (No. of AC 3 X 24 months = 72)
Comprehensive maintenance of 4 ton 3 phase tower type A/C for one month as per special condition attached. (No. of AC 9 X 24 months = 216)
Comprehensive maintenance of 4 ton 3 phase cassette type A/C for one month as per special condition attached. (No. of AC 20 X 24 months = 480)
Comprehensive maintenance of 4 ton 3 phase cassette type A/C for one month as per special condition attached [Compressor under warranty]. (No. of AC 4 X 14 months = 56)
Comprehensive maintenance of Water Coolers of various capacities / make for one month as per the special condition attached. (No. of WC 5 X 24 months = 120)
Comprehensive Maintenance of 190 Ltr Direct cool, refrigerator. including consumable items and all spare parts etc. complete as required. (No. of Refrigerator 1 X 24 months = 24)
Comprehensive Maintenance of 50 Ltr Direct cool, refrigerator. including consumable items and all spare parts etc. complete as required. (No. of Refrigerator 3 X 24 months = 72)
Comprehensive Maintenance of 687 Ltr refrigerator. including consumable items and all spare parts etc. complete as required [Compressor under warranty]. (No. of Refrigerator 1 X 17 months = 17)
Comprehensive Maintenance of 200 LPH capacity centralized R.O. Plant complete with all accessories including consumable and all spare parts but excluding the R.O. membrane. Complaints and breakdown should be attended on priority. (No. of RO Plant 2 X 24 months = 48)
Comprehensive maintenance of storage type water cooler with inbuilt RO of capacity of 40 Ltr/hr with rotary compressor & having 80 Ltr storage capacity with all accessories including consumable and all spare parts etc. complete as required. (No. of Water Cooler 2 X 24 months = 48)
Comprehensive maintenance of 25 LPH R.O. unit including consumable items and all spare parts i/c. membrane etc. complete as required. (No. of RO 5 X 24 months = 120)
Comprehensive maintenance of 14 LPH R.O. unit including consumable items and all spare parts i/c. membrane etc. complete as required. (No. of RO 2 X 24 months = 48)
Comprehensive maintenance of recessed bi level, touchless, infrared sensor based drinking water fountain tap including consumable items and all spare parts etc. complete as required. (No. of Drinking Water Fountain 4 X 24 months = 96)
Comprehensive maintenance of In-wall bottle filler with UV-C, touchless with infrared sensor, online chiller including consumable items and all spare parts etc. complete as required. (No. of Online Chiller 2 X 24 months = 48)
Installation, Testing, Commissioning of split type AC of 1.5 / 2.0 TR. capacity including all necessary connections, gas charging (as per requirement) and making interconnection wiring between indoor & outdoor units etc. complete as per the instructions of engineer in charge.
Dismantling of 1.5 / 2.0 TR A/C including all necessary connections, wiring between indoor and outdoor units and hand over to AAI store etc. complete as per the instructions of engineer in charge.
Providing & fixing extra refrigerant copper piping with Nitrile rubber insulation and copper cabling (2.5 sq.mm.) between indoor and outdoor units of split-type AC units (Upto 2 TR) etc. as required.
Providing & fixing extra refrigerant copper piping with Nitrile rubber insulation and copper cabling for power (2.5 sq.mm.) and communication (1.5sq.mm) between indoor and outdoor units of tower / casette AC units (Upto 4 TR) etc. as required.
Supply and fixing of RO membrane compatible for 200 LPH capacity centralized RO plant.
Servicing i/c. replacing minor spare of air cooler, installed at different location as per direction of E.I.C. (No. of Air Cooler 44 X 2 visit = 88, as and when required.)
Supply and fixing of spares of air cooler (As and when required). a) Air cooler electric motor 1/8 HP
Supply and fixing of spares of air cooler (As and when required). b) Air cooler pump medium
Supply and fixing of spares of air cooler (As and when required). c) Air cooler swing motor
Supply and fixing of spares of air cooler (As and when required). d) Air cooler fan 16"
Supply and fixing of spares of air cooler (As and when required). e) Air cooler outer net (3 set of one cooler)
Submission of water portability report (i/c. Chemical & Bacteriaological) from govt. lab / approved govt. lab of sample collected from the location as per instruction of E.I.C. Report to be submitted once in three month.
Operation of 200 LPH R.O. plant on all days including Sundays days and holidays in two shift.
CENTRE TAP ENGINEERING
Ganga Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .