Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC | L1 | Accepted-AOC WIN THE LOTTERY | |
| 2 | L1₹30.7 LRejected-AOC | L1 | Rejected-AOC L1 | |
| 3 | L1₹30.7 LRejected-AOC AT NIGAM NAGAR 2ND LANE WARD NO 37 PO ANKULI BERHAMPUR DIST GANJAM ODISHA | BERHAMPUR | GANJAM | ODISHA | 760010 | L1 | Rejected-AOC L1 | |
| 4 | L1₹30.7 LRejected-AOC | L1 | Rejected-AOC L1 | |
| 5 | L1₹30.7 LRejected-AOC ODISHA OB | KORAPUT | ODISHA | 764011 | L1 | Rejected-AOC L1 |
Tender Value
₹36.1 L
EMD Value
₹36,070
Closing Date
29 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer , RWSS , Berhampur
Nera Jarada Bunglow, Berhampur-760004
PWS to Raijhola -III (Fadiripalli and Church Sahi ) under Kukudakhandi Block
2023_RWSS_88929_2
SERWSSBAM- 06 (B) / 2023-24
National Competitive Bid
Civil Works - Water Works
Item Rate
330 days
PWS to Raijhola -III (Fadiripalli and Church Sahi
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹36,070
Yes
19 Dec 2023
16 May 2023
30 May 2023
16 May 2023
29 May 2023
16 May 2023
16 May 2023 - 25 May 2023
Amount
Laying of pipe line ,Head works, Other Balance Works
Supplying all materials labour T&P for design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, stand post,rechargepit,bore well platform,Drinking water supply to govt.institutions, individual house hold connection, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any leakage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 20000 LTR OHR WITH 10M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 20000 ltrs capacity with necessary staging height of 10 mtr consisting of minimum 4 nos RCC columns and square dome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of 65mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga/CET,BBSR/VSSUT,Burla/NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure-G& H)
Brajamohan Palo
TARANIDHARA BEHERA
SIBA PRASAD PANIGRAHY
Laxmikanta Panigrahi
Aswini Kumar Dalai
SHANKAR KUMAR SAHU
Manoj Kumar Pradhan
ANJAN KUMAR PANIGRAHI
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .