Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
26 Aug 2026, 6:00 pm2d left
Col Shinde SS
Commander Works Engineers, Station Road, Visakhapatnam - 530 004
Comprehensive Maintenance and Repairs including renewal Replacement of Defective Parts of lifts of Kone make Under GE Utility II Visakhapatnam.
2026_MES_783354_1
82697/E8
Open Tender
Civil Works
Item Rate
330 days
VISAKHAPATNAM
As per NIT
9 documents required · 9 mandatory
₹300
GE Utility-II
₹6,000
Yes
7 Aug 2026
7 Aug 2026
28 Aug 2026
7 Aug 2026
26 Aug 2026
20 Aug 2026
7 Aug 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Comprehensive maintenance and repair of electrically operated lifts of Kone make, equipped with collective/selective control systems, including carrying out periodic inspection, preventive maintenance, breakdown repairs, and performance testing in accordance with the OEM’s recommendations, Particular Specifications, and directions of the Engineer-in-Charge, to ensure smooth, safe, and efficient operation of the lifts. The scope shall include supply and replacement of all required spare parts, components, assemblies, and accessories of OEM approved and compatible make, except for the specific spares separately provided for herein, complete in all respects for the following lifts:- | |||||
| 1.01 | Electrically Goods Lift of 2000 KG Capacity serving up to G+2 Floors (Total 01 Lifts) installed in store house at WED(V) by deploying 01 No of Lift Technician per shift of 08 hours in general shift including Sundays and Holidays. (Shift Timing : Shift from 0900 hours to 1700 hours ). | 11 | Job Per Month Per Lift | - | - |
| 1.02 | Electrically Goods Lift of 544KG Capacity serving up to G+3 Floors (Total 01 Lifts) installed in CE(Navy) office Building by deploying 01 No of Lift Technician per shift of 08 hours in general shift including Sundays and Holidays. (Shift Timing : Shift from 0900 hours to 1700 hours ). | 12 | Job Per Month Per Lift | - | - |
| 2.01 | (d) Emergency lighting arrangements and all essential tools shall be maintained in proper working condition and kept available in a designated toolbox during each shift to ensure uninterrupted and efficient lift operation.
(e) The contractor shall provide adequate conveyance and communication facilities, such as two-wheelers and mobile phones, to all lift technicians to ensure prompt attendance and effective service delivery.
(f) The contractor shall comply with all applicable and prevailing labour laws, rules, and regulations, including their latest amendments.
(g) Wages paid to personnel deployed under the contract shall not be less than the minimum wages notified by the State Government or the Central Government from time to time, whichever is higher.
(h) The contractor shall be responsible for making all statutory contributions and subscriptions towards Insurance, EPF, ESI, Labour Welfare Cess, and any other applicable levies. The contractor shall also pay Gratuity, Bonus, and other statutory benefits to the workmen as per existing Labour Rules, Acts, and Regulations. The rates quoted shall be deemed to be inclusive of all such statutory liabilities.
(j) DRESS CODE: The contractor shall provide all deployed workmen with a uniform (formal pant and T-shirt) bearing printed/embroidered details showing the “Name of the Firm and Designation” on the front and “GE [U-II] [V]” on the back of the T-shirt. Suitable protective clothing and safety gear shall also be provided. Safety shoes shall be mandatorily issued to all personnel, and no person shall be permitted to enter the work site without wearing proper safety shoes. | - | - | - | - |
| 2.02 | (k) The contractor shall be solely responsible for any accidents or injuries sustained by the workmen during the execution of the contract. In the event of minor or fatal injury, partial disability, or any untoward incident arising due to non-adherence to safety regulations, IE Rules, improper maintenance of lift systems/safety mechanisms, mishandling, incorrect operation, lack of safety knowledge, or any other circumstances whatsoever, the contractor shall settle all compensation claims. In case of failure to do so, the Department reserves the right to recover the amount as determined by the Labour Commissioner/Court of Law from any dues payable to the contractor. No claim shall be entertained against the Department in this regard, and no compensation shall be payable by the Department. The contractor shall also provide and maintain adequate first-aid boxes to meet emergency situations.
(l) The contractor shall carry out periodic inspections, preventive maintenance, repairs, and overhauling, as and when required, of all mechanical and electrical components of the lifts, including electric motors, gear units, door drives, controllers, pulleys, limit switches, relays, and allied equipment, complete in accordance with the manufacturer’s recommendations and as directed by the Engineer-in-Charge. All safety systems, including ARDs, shall be maintained in serviceable condition round the clock, and the cost of associated spares, batteries, and components shall be deemed to be included in the quoted rates. No extra payment shall be made on this account.
(m) The rate quoted shall be deemed to be inclusive of cleaning of the lift cabin, sills, machine room, COPs, LOPs, and all associated lift areas. Cleaning shall be carried out twice daily, once in each shift, to maintain the lift premises clean, neat, tidy, and to ensure smooth functioning of the lift system.
(n) The lift technician shall be stationed at a central location between the group of five (5) lifts serving the nearby buildings to facilitate prompt access and monitoring. The technician shall visit and inspect each lift at intervals not exceeding thirty (30) minutes to check and ensure that the lifts are operating properly and safely at all times. | - | - | - | - |
| 2.03 | (o) The contractor shall ensure that the lift technician is present during the entire shift period as specified in the contract. In case any technician is found absent for any shift or at any time during the shift hours, the same shall be treated as absence for the entire shift. In such cases, the shift shall not be measured for payment, and in addition, a penal recovery equivalent to the rate quoted per shift shall be made from the contractor’s dues.
(p) In the event of any passenger being trapped inside the lift, the lift technician shall immediately respond upon receiving the information/complaint and take necessary action to rescue the passenger(s) safely, and in no case shall the rescue operation exceed thirty (30) minutes from the time the information is received. If the rescue operation is not completed within thirty (30) minutes for any reason whatsoever, the concerned technician shall be treated as absent for that shift and recovery shall be effected from the contractor’s dues as per the applicable clauses prescribed for technician absence, in addition to non-measurement of the shift.
(q) The contractor shall ensure continuous monitoring, prompt rectification of minor issues, and immediate reporting of any malfunction or abnormality to the Engineer-in-Charge. All manpower, supervision and incidental requirements for carrying out the above activities shall be deemed to be included in the quoted rate and no extra payment shall be admissible on this account.
(r) If the bidder is not the Original Equipment Manufacturer (OEM) of the lifts, the tenderer shall mandatorily upload a valid Memorandum of Understanding (MoU) obtained from the respective OEM(i.e M/S Kone), confirming provision of technical support and deployment of trained personnel for carrying out repairs, replacement, and testing of lift components, accessories, and controllers strictly through the OEM. The MoU shall be uploaded online along with the Technical Bid, failing which the bid shall be summarily rejected and the Financial Bid shall not be opened. No representation, clarification, or correspondence in this regard shall be entertained at any stage.
(Make of Lift:- M/S Kone ) | - | - | - | - |
| 3 | Supply only Maintenance Free Sealed Battery, 12 Volts, 18 AH Capacity suitable for functioning of ARD system complete all as specified and as directed.
Make: Exide / Amaron/Okaya/Luminous | 6 | Each | - | - |
| 4 | Supply only Maintenance Free Sealed Battery, 12 Volts, 7 AH Capacity suitable for functioning of ARD system complete all as specified and as directed.
Make: Exide / Amaron/Okaya/Luminous | 6 | Each | - | - |
| 5 | Supply only recessed mounted circular LED light fittings 5 W capacity suitable for lift cabin ceiling including taking down existing cabin LED light complete all as specified and as directed. | 5 | Each | - | - |
| 6 | Supply only cabin axial flow fan 300mm sweep suitable for recessed mounted in false ceiling including taking down old unserviceable fan complete all as specified and as directed. | 1 | Each Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
82697tenderdoc.pdf
Tender Documents • 0.92 MB
BOQ_877673.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].