Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | +1.40% | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 LAdmitted-Finance | +2.20% | ₹4.7 L | L2 | Admitted-Finance |
| 3 | L3₹4.8 LAdmitted-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | +2.50% | ₹4.8 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Unwiling to progress further with this work under the above mentioned NIeT.Withdrawal letter is also enclosed. |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Unwiling to progress further with this work under the above mentioned NIeT.Withdrawal letter is also enclosed. |
Tender Value
₹4.6 L
EMD Value
₹9,293
Closing Date
25 May 2026, 3:30 pmClosed
ASSISTANT ENGINEER,PWD,BKPSD-I
Mangal Pandey Uddyan Gandhi Ghat Barrackpore
Construction of 1 (one) no. Toilet Block adjacent to the Unit Armoury of W.B.N.V.F. Training Centre, Halisahar Project ID- DM252649769S000.
2026_WBPWD_5013890_1
WBPWD/AE/BKPSD-I/NIeT04/26-27
Open Tender
CIVIL WORKS
45 days
BARRACKPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,293
12 Jun 2026
11 May 2026
28 May 2026
11 May 2026
25 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code | GST % |
|---|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm | 10.02 | Cum | 119.27 | ₹1,195.09 | 1 | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 1.67 | Cum | 77.54 | ₹129.49 | 2 | - |
| 3 | (B) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 2.6 | Cum | 1,317.14 | ₹3,424.56 | 3 | - |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 21.19 | Sqm | 361 | ₹7,649.59 | 4 | - |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety | 3.18 | Cum | 5,265.66 | ₹16,744.8 | 5 | - |
| 6.01 | Brick work with 1st class bricks in cement mortar (1:4)
(a) In foundation and plinth | 5.42 | Cum | 5,614.17 | ₹30,428.8 | 6.01 | - |
| 6.02 | (b) In superstructure, ground floor | 9.17 | Cum | 5,837.17 | ₹53,526.85 | 6.02 | - |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 1 | Sq.m. | 728.53 | ₹727.8 | 7 | - |
| 8 | 25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately). Chequering not required over concrete or painted surface). | 1.84 | Sq.m. | 184.16 | ₹338.85 | 8 | - |
| 9.01 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plaster | 55.44 | Sqm | 163.24 | ₹9,050.03 | 9.01 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
All_Other_Documents.pdf
Additional Documents • 1.49 MB
2911.pdf
Tender Documents • 1.86 MB
BOQ_5081759.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid