| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-AOC | 1 | Accepted-AOC Lowest Amount quoted without tax | |
| 2 | 2₹5.6 L+₹1,124.65 (0.20%)Rejected-AOC | 2 | Rejected-AOC Highest Amount quoted without tax |
Tender Value
₹6.6 L
EMD Value
₹16,409
Closing Date
6 Feb 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Subair.P
Regional Manager(Operations),Kerala SIDCO Marketing Regional Office,Kadavanthra,Kochi-20
e tender for the innovation work at Kuriyottumala Kollam
2023_SIDCO_553766_1
SIDCO/MTG/SSEKLM/ET/22-23/04
Open Tender
Miscellaneous Works
Item Rate
14 days
Kollam
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,549
Yes
₹16,409
Yes
2 Mar 2023
30 Jan 2023
7 Feb 2023
30 Jan 2023
6 Feb 2023
30 Jan 2023
Amount
Excavation Work Earth Work in Excavation by Mechanical Means (Hydraulic Excavator)/ Manual Means In Foundation Trenches Or Drains(Not Exceeding 1.5 M in Width Or 10 Sqm on Plan) Including Getting Out the Excavated Soil and Disposal of Surplus Excavated Soil As Directed with in A Lead of 50 M All Kinds of Soil.
Concrete Works Providing and Laying in Position Cement Concrete of Specified Grade Excluding The Cost of Centering and Shuttering. All Work Up to Plinth Level:1:4:8 (1 Cement:4 Coarse Sand:8 Graded Stone Aggregate 40 Nominal Size)
Concrete Works Providing and Laying in Position Machine Batched and Machine Mixed Design Mix M-25 Grade Cement Concrete for Reinforced Cement Concrete Work Using Cement Content As Per Approved Design Mix, Including Pumping of Concrete to Site of Laying But Excluding the Cost of Centering,Shuttering,Finishing and Reinforcement,Including Admixtures In Recommended Propotions As Per IS: 9103 to Accelerate,Retard Setting of Conrete Improve Workability with Out Impairing Of Engineerin Charge.Note-Cement Content Considered in This Item Is @ 330 Kg/ Cum.Excess Or Less Cement Used As Per Design Mix Is Payable Or Recoverable Seperately. All Work Up to Plinth Level.
Steel Reinforcement Work (KG) For RCC Work Including Staightening, Cutting,Bending,Placing in Position And Binding All Complete Up to Plinth Level. Thermo-Mechanically Treated Bars of Grade Fe-500D Or More
Checker Sheet -4 mm
Fiber Cement Board 9mm Thick Heavy Duty Fiber Cement Board
Steel Work Welded in Built Up Sections/framed Work, Including Cutting,Hoisting,Fixing in Position and Applying A Priming Coat of Approved Steel Primer Using Structural Steel Etc As Required. In Stringers,Treads,Landings Etc of Stair Cases Including Use of Chequered Plate Wherever Required,All Complete
Steel Work Welded in Built Up Sections/ Framed Work,Including Cutting,Hoisting Fixing in Position and Applying A Priming Coat of Approved Steel Primer Using Structural Steel Etc.As Required. In Gratings,Frames,Guard Bar.Ladder,Railings Brackets,Gates and Similar Works
Hand Rail Work(KG) Providing and Fixing Hand Rail of Approved Size by Welding Etc.to Steel Ladder Railing, Balcony Railing, Staircase Railing And Similar Work Including Applying Priming Coat of Approves Steel Primer GI Pipes
Roofing Work(KG) Providing Corrugate GS Sheet Roofing Including Vertical/ Curved Surface Fixed with Polymer Coated J Or L Hooks,Bolts and Nuts 8mm Diameter With Bitumen and GI Limpet Washers Or with GI Limpet Washers Filed With White Lead,Including A Coat Of Approved Steel Primer and Two Coats Of Approved Paintson Overlapping of Sheets Complete(Up to Any Pitch in Horrizontal/ Vertcal Or Curved Surfaces) Excluding The Cost of Purlins,Rafters and Trusses And Including Cutting to Size and Shape Wherever Required.1.00 mm Thick With Zinc Coating Not Less Than 275 Gm/m2
Steel Work Steel Work in Built Up GI Tubular(Round Square Or Rectangular Hollow Tubes Etc) Trusses Etc, Including Cutting, Hoisting, Fixing in Position and Applying A Priming Coat of Approved Steel Primer,Including Welding and Bolted with Special Shaped Washers Etc.Complete
Painting Work Finishing with Deluxe Multy Surface Paint System for Interiors and Exteriors Using Primer As Per Manufactures Specifications: Two Or More Coats Applied on Walls@ 1.25 Ltr/10 Sqm Over and Including One Coat of Special Primer Applied @0.75 Ltr/10 Sqm
Wooden Cot Providing and Instaling King Size Cot Made Up of Melamine Particle Board With Head Board and Foot Board With Storage Unit Under the Cot Including Fixtures,Mattress,Pillows Etc. Cot Size-6.25'x6' Mattress-6.25'x6', 8'' Thickness
A R TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .