Loading…
Loading…
Tender Value
₹43.0 L
EMD Value
₹43,500
Closing Date
24 Jul 2026, 6:00 pmClosed
Executive Engineer Panchayat (R&B) Division, Gir Somnath
Construction of Compound Wall at Kodinar Survey No.1264/1/A Tal. Kodinar Dist. Gir Somnath.
323125
12/2026-27 Sr.No.1
Open
Civil Works - Others
Works
Gir Somnath
5 documents required · 5 mandatory
₹1,500
DD in favour of Executive Engineer, Panchayat R&B Division - Gir Somnath
₹43,500
11 Jul 2026
11 Jul 2026
11 Jul 2026
24 Jul 2026
11 Jul 2026
BILL OF QUANTITY
Memorandum showing items of works to be carried out
Item No. Discription of Item (With Brief Specification and Quantity Unit Rate In Amount
reference to book of Specification) Figures
1 Excavation for foundation upto 1.50 M.depth including 140.000 Cum 164.64
sorting out &stacking of useful materials i.e. dispositing
the excavated stuff up to All lead & Lift (a)Dense or Hard
2 Excavation for foundation upto 1.5 m depth including 51.600 Cum 281.73
sorting out and stacking of useful materials and disposing
off the excavated stuff upto All Lead & Lift.(C) Hard
3 Providing and laying cement concrete 1:4:8 (1 cement, 39.400 Cum 2957.81
4sand,8 machine crushed stone aggregates
mm.Nominal size)and curing complete, excluding cost of
formwork in(a) Foundation and Plinth
4 Providing and laying ordinary cement concrete1:1:2 19.400 Cum 7358.34
(1cement,1sand, 2 gradedstone aggregates
mm.Nominal size) and finishing smooth with curing etc.
complete excluding cost of form work and reinforcement
for reinforced cement concrete work in in A) Foundations,
footings, base of columns and mass concrete
5 Providing and laying ordinary cement concrete1:1.5:3 23.400 Cum 11028.20
(1cement,1.5sand, 3 gradedstone aggregates
mm.Nominal size) and finishing smooth with curing etc.
complete including the cost of formwork but excluding the
cost of reinforcement of R.C.C. work in Column (iii) Having
cross-sectional area more than 0.085 Sq.M. and up to
6 White Stone Bela mesonry block in course in 182.300 Cum 6698.05
superstructure with stone of approved quality in Lime
Mortar 1:5 (1-Cement :5- course sand) including packing
the joints etc.
7 Providing and laying cement concrete1:1.5:3 17.020 Cum 7329.98
(1cement,1.5sand, 3 gradedstone aggregates20
mm.Nominal size) and curing complete, including cost of
formwork in sill and sides (R.C.C. band) but excluding the
cost of reinforcement upto All floor level
8 Providing & laying C.C. 1:11/2:3 (1 cement ,11/2 course 51.100 Cum 8035.64
sand,3 graded stone agg.of 20 mm nominal size) and
finishing smooth with curring etc. comp. incl. the cost of
formwork but excl. the cost of reinforcement for R.C.C.
work in. (A) Beam :- Having cross sectional Area
to 0.12 Sqm.upto All floor level
9 Providing TMT Bar FE 500/500D reinforcement for R.C.C. 10565.000 Kg 77.29
work including bending, binding and placing in position
complete upto All floor level
10 20mm thick sand faced cement plaster on walls upto 1993.000 Sqm 358.72
height 10 metres above ground level consisting of 12mm
thick backing coat of C.M. 1:3 (1-cement : 3-sand) and
8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand)
11 Finishing wall with weather proof exterior emulsion paint 1993.000 Sqm 122.14
on wall surface(two coats) to give an required shape even
shade after thoroughly brushing the surface to rempve all
dirt, and remains of loose powdered materials etc
12 Providing and fixing M.S. Grills of required pattern to 310.000 Kg 123.12
frames of Pipe / Angles etc.including Priming coat of
approved primer and Two coats of Oil painting etc.
complete Plain Grill
13 Providing and fixing 0.60 Meter high fencing with 1.10 ( Y 535.000 Rm 337.24
shape) meter long M.S. angle posts 40mm x 40mm x
6mm and oil painting 3 coats fixed at 3.00 Mt. c/c with
Three orizontal lines and two diagonals of galvanized
steel barbed wire weighing 9.38 Kg per 100meter strained
and fixed to posts with G.I. staples including fixing the
posts in ompoundwall masonary & Coping etc. complete
Dismentled Material Credit Rs. 0 will be deducted from 1 St R.A. Bill
Rupees Forty Three Lakh Four Thousand Eight Hundred Eighty One and Paise Sixty Three only
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent ( Should be written in
figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Kodinar Gir Somnath
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Compound Wall At KDR.pdf
Building Circular.pdf
Cement Steel Cons Compound Wall At KDR.pdf
SBD Compound Wall At KDR.pdf
Specification Compound Wall At KDR.pdf
Test Shed. Compound Wall At KDR.pdf
12_2026-27 Nivida_Gir Somnath.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .