Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹51.6 L+₹2.0 L (4.03%)Rejected-AOC KADAYIL DEW 1ST FLOOR DOOR NO 1888 NH ROAD SREEKARYAM PO TRIVANDRUM 695017 | THIRUVANANTHAPURAM | KERALA | 695017 | L2 | Rejected-AOC L2 | |
| 3 | L3₹55.4 L+₹5.9 L (11.8%)Rejected-AOC DOOR NO 5 155B KOTHARATHU BUILDING NEAR ALPHA PALIATIVE CARE VENGANELLUR CHEKKAKKARA THRISSUR KERALA 680586 | THRISSUR | KERALA | 680586 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹67,500
Closing Date
25 Jan 2022, 5:00 pmClosed
EXECUTIVE ENGINEER PMU KALPETTA
EXECUTIVE ENGINEER,KSEBL,PMU,ELECTRICAL CIRCLE KALPETTA 673121
Supply and stringing 3x120sq.mm plus 1x95 sqmm 11KV ABCables under varius section office under te jurisdiction of Electrical Circle Kalpetta
2022_KSEB_465913_1
EE/PMU(KLPT)/ET-10/2021-22
Open Tender
Electrical Works
Turn-key
90 days
KALPETTA
7 documents required · 7 mandatory
₹5,900
₹67,500
Yes
4 Feb 2022
7 Jan 2022
27 Jan 2022
7 Jan 2022
25 Jan 2022
10 Jan 2022
7 Jan 2022 - 10 Jan 2022
DETAILS OF WORK
Supplying and stringing of HTABC of size 3x120sqmm+1x95Sqmm (insulated messenger wire ) along the route length (20-25m span) on existing PSC/ Apole supports anchoring of messenger wire on Eye Hooks/SS straps and Suspension Clamp giving connections at existing AB/DT point using proper end termination materials,providing suitable extension arrangements with all to maintain the necessary clearances and sags with provisions for loops if found necessary earthing ,providing surge arresters testing and commissioning including supply of all accessories like Anchor Clamp/Dead End Clamps, Suspension Clamps,Cable end clamps,cable ties,SS Buckle and Strap ,spiral earthing set, pipe earthing using 40mm Dia GI pipe 2.5m length along with all necessary materials,Pre insulated straight through joints suitable for 120sqmm and 95 sqmm labour ,hire and tranportation and incidental charges cutting and removing tree branches wherver necessary.The offer shall include the cost of ABC and its accessories including the spare requirement given in clause 2.2 of Part 1 of the bid.The scope of work does not include supply and errection of poles ,stays treecutting compensation PTCC and Electrical inspectorate charges(Poles ,stays and AB switch will be supplied and errected byKSEBL)
Genisys Engineers and Contractors
ITHAL ENGINEERING GROUPS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_667124.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .