Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.87Admitted-Finance 312 318 3RD FLOOR ARCAE MALL MALVIYA MARG C SCHEME JAIPUR 302001 | JAIPUR | JAIPUR | RAJASTHAN | 302001 | ₹4.87 | L1 | Admitted-Finance |
| 2 | L2₹5.60+₹0.73 (15.0%)Admitted-Finance | ₹5.60+₹0.73 (15.0%) | L2 | Admitted-Finance |
| 3 | L3₹7.21+₹2.34 (48.0%)Admitted-Finance 42 1ST FLOOR HARI OM TOWER MAN JI KA HATHA JODHPUR JODHPUR RAJASTHAN 342001 | JODHPUR | RAJASTHAN | 342001 | ₹7.21+₹2.34 (48.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SOLAR OPTIMISED LINE PVT LTD L2 | Stockwell Solar Services Private Limited L1 | ATRI SUNPOWER PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00RESCO MODE | ||||||
| 1.01 | Fixed Tariff Rate Per (INR / KWh) for 25 Years
of Grid Connected Solar Photo Voltaic (PV) Project of 150 KWp capacity under RESCO mode at Bharat Heavy Electricals Limited, Rudrapur.
{Quote Fixed Tariff Rate per Unit (kwh) for 25 Years} | 1 | KWH | 5.6 ₹5.6 | 4.87 ₹4.87 Lowest | 7.21 ₹7.21 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
7 Nov 2025, 1:00 pmClosed
ED-CFP BHEL
BHEL RUDRAPUR
Installation of 150 kW Rooftop Solar at BHEL Rudrapur under PM Suryaghar Muft Bijli Yojana on RESCO Mode for 25 years period
2025_BHEL_53742_1
202500721
Open Tender
Miscellaneous Works
Works
9125 days
BHEL RUDRAPUR
As Mentioned in SCC
2 documents required · 2 mandatory
₹0
₹2 L
Yes
BHEL Rudrapur
30 Dec 2025
28 Oct 2025
8 Nov 2025
28 Oct 2025
7 Nov 2025
28 Oct 2025
28 Oct 2025 - 7 Nov 2025
3 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .