Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹26.5 L+₹37,688.48 (1.44%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹29.6 L+₹3.4 L (13.1%)Rejected-AOC EDAMCHERYKUNNU HOUSE CHENGALA PO KASARGOD | KANNUR | KERALA | 670511 | L3 | Rejected-AOC L3 | |
| 4 | L4₹36.1 L+₹9.9 L (38.0%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Tender documents (form 83 & 84) not submitted. Hence rejected. |
Tender Value
₹31.3 L
EMD Value
₹50,000
Closing Date
17 Aug 2022, 6:00 pmClosed
Executive Engineer, Irrigation division, Kasaragod
Office of the Executive Engineer, Irrigation Division, Civil Station, Vidyanagar, Kasaragod-671123
Protecting the right bank of Nileshwaram river on D/s of Nambiarkkal Anicut in Nileshwaram Municipality of Hosdurg Taluk
2022_Irrig_502484_1
EEIKSET-01/2022-23
Open Tender
Civil Works - Others
Item Rate
240 days
Nileshwaram Municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
15 Oct 2022
6 Aug 2022
24 Aug 2022
6 Aug 2022
17 Aug 2022
6 Aug 2022
Amount
od41247/2021_2022/IA : Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.(60.34.9 OD Iriigation)
od41248/2021_2022/IA : Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the retaining wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.(60.45 OD Irrigation)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
60.2.1 : EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
M.V. REMESHAN
Mohammed Kunhi C A
M CHANDRAN
Bidder Name
M CHANDRAN
M.V. REMESHAN
ASHARAF M
Mohammed Kunhi C A
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_719905.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .