Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 CrAccepted-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹13.0 Cr Quoted ₹13.4 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹13.7 CrRejected-AOC 62 BALSAMAND ROAD HISAR 125001 | HISAR | HARYANA | 125001 | ₹13.7 Cr | L2 | Rejected-AOC reject |
Tender Value
₹9.8 Cr
EMD Value
₹19.6 L
Closing Date
23 May 2022, 11:00 amClosed
o/o Executive Engineer, MICAD Division
o/o Executive Engineer, MICAD Division, HIRMI Complex, Dhand Road, Kurukshetra
Micro-Irrigation Schemes in the command(s) of outlets RD. 4000-R and RD. 17000-L Mansurpur Minor villages Kaleran and Badhola, Konkpur in district Ambala of Haryana
2022_HBC_220307_1
MICADA/HR/AMB/344-MM.
Open Tender
Miscellaneous
730 days
Ambala
As laid down in the bid document
4 documents required · 4 mandatory
₹20,000
₹19.6 L
Yes
Kurukshetra
8 Jul 2022
10 May 2022
23 May 2022
10 May 2022
23 May 2022
10 May 2022
10 May 2022 - 16 May 2022
16 May 2022
Amount
Works Details
Planning, Design, Supply, Installation, Testing, Commissioning and Operation & Maintenance for 3 Years (including three years free maintenance of on-farm Micro irrigation System) after one year assured performance demonstration / defects liability period, whichever is later, of Solar Powered Integrated Micro-Irrigation Schemes in the command(s) of outlets RD. 4000-R Mansurpur Minor village Kaleran in district Ambala of Haryana including low pressure pipeline infrastructure from the outlet to on-farm ponds.-on EPC mode under Hybrid Annuity based Model (HAM).
Planning, Design, Supply, Installation, Testing, Commissioning and Operation & Maintenance for 3 Years (including three years free maintenance of on-farm Micro irrigation System) after one year assured performance demonstration / defects liability period, whichever is later, of Solar Powered Integrated Micro-Irrigation Schemes in the command(s) of outlets RD. 17000-L Mansurpur Minor villages Badhola, Konkpur in district Ambala of Haryana including low pressure pipeline infrastructure from the outlet to on-farm ponds.-on EPC mode under Hybrid Annuity based Model (HAM).
Krishan Kumar contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid