Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹12,600
Closing Date
6 Jun 2026, 5:00 pmDue tomorrow
EXECUTIVE ENGINEER PMU
PROJECT MANAGEMENT UNIT VYDYUTHI BHAVANAM KSEBL KOZHIKODE PIN 673011
HT LINE USING ABC AND INSERTION 100 KVA DTR NEAR VALIYAPARAMBATHKAVU UNDER ELECTRICAL SECTION KARAPRAMBA
2026_KSEB_853273_1
PMU/KKD/e-Tender/02-A/2026-27 Dtd 29-05-2026
Open Tender
Electrical Works
KARAPARAMBA
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,298
₹12,600
29 May 2026
29 May 2026
9 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
29 May 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. | 3 | m | 158.91 | ₹476.73 |
| 2 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 2 | No | 10,473.36 | ₹20,946.72 |
| 3 | Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles. | 1 | No | 10,905.14 | ₹10,905.14 |
| 4 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. | 4 | No | 481.95 | ₹1,927.8 |
| 5 | Drilling hole of various sizes on existing Channel/Cross Arm. | 50 | No | 16.73 | ₹836.5 |
| 6 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 7 | E | 906.41 | ₹6,344.87 |
| 7 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. | 7 | No | 4,245.59 | ₹29,719.13 |
| 8 | Erection of suspension clamp for 11KV ABC of any size | 12 | No | 164.67 | ₹1,976.04 |
| 9 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles | 413 | No | 50.72 | ₹20,947.36 |
| 10 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 1 | No | 2,795.55 | ₹2,795.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BIDDOCUMENT.pdf
Tender Documents • 0.91 MB
BOQ_1441958.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid