Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.2 Cr+₹1.6 L (0.12%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Hard copy of D.D and Earnest money not submitted by bidder |
Tender Value
₹13.2 Cr
EMD Value
₹26.5 L
Closing Date
18 Oct 2023, 5:00 pmClosed
E.E, RWD, Works Division, Gumla
E.E, RWD, Works Division, Gumla
RWD/GUMLA/STPKG-05/2023-24, 1.(STRENGTHENING OF ROAD FROM CHHARDA TO ARKO ROAD BLOCK-SISAI DISTRICT-GUMLA LENGTH-3.50KM )2.(STRENGTHENING OF ROAD FROM T06 TO SURSA BLOCK-SISAI DISTRICT-GUMLA LENGTH-2.50KM )3.(STRENGTHENING OF ROAD FROSTRENGT
2023_RWD_76849_1
RWD/GUMLA/STPKG-05/2023-24
Open Tender
Civil Works
Percentage
274 days
GUMLA
Tender Fee, EMD, Affidavit
4 documents required · 4 mandatory
₹10,000
EE RWD Works Division, Gumla
₹26.5 L
Yes
9 Jan 2024
11 Oct 2023
20 Oct 2023
11 Oct 2023
18 Oct 2023
11 Oct 2023
11 Oct 2023 - 18 Oct 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (STRENGTHENING OF ROAD FROM CHHARDA TO ARKO ROAD)Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201. S.O.R. Item No. 2.2 | 1.47 | Ha | 19,760.3 | ₹29,047.64 |
| - | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres.By Mechanaical Means using Motor Grader | 5,144.63 | m2 | 6.7 | ₹34,469.02 |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 333.38 | m3 | 61.48 | ₹20,496.2 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)S.O.R. Item No. 3.18 | 15,542.95 | m3 | 131.3 | ₹20,40,789.34 |
| - | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.S.O.R. Item No. 4.01 B(I) GSB Gr-I | 490.86 | m3 | 2,357.25 | ₹11,57,079.74 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 1,989.92 | m3 | 2,666.34 | ₹53,05,803.29 |
| - | Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.S.O.R. Item No. 5.01 A (I) | 12,157.72 | m2 | 82.03 | ₹9,97,297.77 |
| - | Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.S.O.R. Item No. 5.02 (II) | 11,690.12 | m2 | 16.22 | ₹1,89,613.75 |
| - | Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.S.O.R. Item No. 5.03 | 660.26 | m3 | 8,021.7 | ₹52,96,407.64 |
| - | Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.S.O.R. Item No. 5.02 (I) | 13,256.25 | m2 | 13.09 | ₹1,73,524.31 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_102551.xls
BOQ • 0.39 MB
DOUBLEF2BIDDOCUMENT.pdf
Tender Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .