| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accept |
| 2 | Accepted-Technical | Accepted-Technical accept |
| 3 | Accepted-Technical | Accepted-Technical accept |
| 4 | Accepted-Technical | Accepted-Technical accept |
| 5 | Not Admitted-Fee/PreQual/Technical 83 VPO SANGHI ROHTAK 124303 | ROHTAK | ROHTAK | HARYANA | 124303 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹83.0 L
EMD Value
₹1.7 L
Closing Date
12 Aug 2026, 9:00 amClosed
AJAY NIRALA
Muncipal Corporation Sonipat
CONSTRUCTION OF BOUNDARY WALL OF VARIOUS MC LANDS I.e PONDS , AGRICULTURE LANDS , COMMERCIAL LANDS ETC. IN EASTERN SIDE OF MC SONIPAT
2026_HRY_537605_1
202666FD25AA 0E24 4B97 B7AE 7EA95B525B31292ULB
Open Tender
Civil Works
Works
365 days
Sonepat
2 documents required · 2 mandatory
₹5,000
₹1.7 L
Yes
21 Sept 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [Through Rate] | 6,840.8 | Sqm | 127 | ₹8,68,781.6 |
| 2 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 2,184 | cum | 78 | ₹1,70,352 |
| 3 | [6.1.8]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 8. 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) [Through Rate] | 118.81 | cum | 2,165 | ₹2,57,223.65 |
| 4 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 243.45 | cum | 4,374 | ₹10,64,850.3 |
| 5 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 157.92 | cum | 5,969 | ₹9,42,624.48 |
| 6 | [6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate] | 2,489.98 | Sqm | 262 | ₹6,52,374.76 |
| 7 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | 24,565.4 | Kg. | 68 | ₹16,70,447.2 |
| 8 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 180 | cum | 3,968 | ₹7,14,240 |
| 9 | [7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 436.51 | cum | 4,488 | ₹19,59,056.88 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_616760.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .