The Executive Engineer
Diversion Work for SHRB on SH-118 at Ch. 89.149km of Limbdi Branch Canal
331641
10 of 2026-27
Open
Civil Works - Canal
Works
Surendranagar
4 documents required · 4 mandatory
₹2,832
Executive Engineer SBC Dn No.4-1 Limbdi
₹54,000
5 Aug 2026
5 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Crore)
Name of Division: Executive Engineer, S.B.C. Dn. No. 4/1, Limbdi.
Name of Work :- Diversion Work for SHRB on SH-118 at Ch. 89.149km of Limbdi Branch
Description of Item Quantity Unit Rate Amount
Earthwork/Back filling with selected earth brought
from out side borrow area or from excavated useful
material incl. watering, ramming, Compaction with
pnumatic temping and all lead and lift etc complete.
Excavation in all sort of strata and formations incl.
depositing the unuseful excavated stuff as and where
directed incl sorting and stacking useful materials as
2 directed upto 30 mt lead etc. complete incl. 171.00 Cum 83.00
dewatering. (Depth 0 TO 3.0 mt ) (For all type canal
& foundation trenches of C.D. works )A) IN
OVERBURDEN INCL. HARD MURRUM.
Supplying and fixing reinforced concrete heavy duty
non pressure pipes with collars for culverts including
3 setting and joining the pipes in C.M. 1:2 watering and 36.00 Rmt 10681.52
laying (To level of slops of I.S. 458 / 1971 Class NP4
of following internal diameter. (viii) 1600 mm dia.
Type - A, "W" : Metal Beam Crash Barrier (Providing
and erecting a "W" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal
beam rail, 70 cm above road/ground level, fixed on
ISMC series channel vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 1.8 m high, 1.1 m below
ground/road level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform
to IS:1367 and IS:1364, metal beam rail to be fixed on
the vertical post with a spacer of channel section
x 75 x 5 mm, 330 mm long complete as per clause
Supplying and fixing road sign board of M.S. plates
and angle iron including painting, lettering etc.
5 complete including fixing in C.C. 1:4:8 with 28.00 Each 3072.99
necessary excavation etc. complete as per I.R.C. type
design.(ii) Reflective type
Providing, cutting, bending, binding and fixing in
position as per drawing. TMT BAR , Fe-415
6 reinforcement for R.C.C. works and anchor bars incl 3.74 MT 66268.00
cost of black annealed 16 to 18 BWG M.S.. Wire etc.
complete with all lead and lift.
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed aggregate by
mass and machine mix for R.C.C/CC work including
necessary formworks centering scaffolding
compaction by vibrator, curing as directed with all
lead & lift etc complete Excluding the cost of
reinforcement A) Concrete grade M-15 and MSA-
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed aggregate by
mass and machine mix for R.C.C/CC work including
necessary formworks centering scaffolding
compaction by mechanical vibrator, curing as directed
with all lead & lift etc complete. Excluding the cost of
reinforcement A) Concrete grade M-25 and MSA-
Providing, supplying, Lowering, and laying ISI
Standard R.C.C. NP-3 Class pipes in standard lengths
of following Diameter suitable for either collar joints
or rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to Site, and
jointing in proper position, grade and alignment at all
level as directed by Engineer-in-charge including all
labour, giving hydraulic testing as per ISI code. (G)
900 mm dia. NOTE:- One collar should be supplied
with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be
supplied with each full length socketed pipe, cost
included in rates below.
Providing & laying dry rubble stone pucca pitching
with panel (of size not more than 10sqmt ) of stone
masonry 30cm thick wall in C.M. 1:5, without base
10 inverted filter and header stone but with 10 cms thick 259.00 Sq.mt 831.00
murrum layer (for base ) incl hand packing and
trimming and dressing slopes etc. b) 30 cms thick
stone pitching with pointing in C.M. 1:2
Providing, laying, spreading and compacting layer of
Quarry Spall having CBR not less than 15%, as
subgrade for the designed pavement and conforming
to Clause 305 of MoRT&H Specifications.
Providing, laying, spreading and compacting graded
stone aggregate to Water Bound Macadam (WBM)
specification including premixing the material with
water at OMC in mechanical mix plant carriage of
mixed material by tripper to site, laying in uniform
layers with paver in sub base / base course on well
prepared surface and compacting with vibratory roller
to achieve the desired density.
Total Amount Rs.
Total Amount Rs.
I/We/ am/are willing to carry out the work at… ................... %above/below percent (Should
be written in figures and words)of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Crore):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of
specifications)
------------------------As per Separate sheet attached-------------------------
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any)%(in figure)………………………………
(C)Net Tendered Amount (A-B)(in figure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payment of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Design mix the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD LBC SHRB 89149 Diversion.pdf
BOQ.pdf
Tender Notice Various Diversion on SHRB 89149.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].