Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
12 Jun 2023, 4:00 pmClosed
GENERAL MANAGER
THE BAZPUR COOPERATIVE SUGAR FACTORY LTD. BAZPUR
Boiler Retubing Work in sugar Mill.
2023_BCSFL_59349_1
Boiler Retubing Work
Open Tender
Miscellaneous Goods
Item Wise
180 days
BAZPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
THE BAZPUR COOPERATIVE SUGAR FACTORY LTD. BAZPUR
₹30,000
8 Aug 2023
6 Jun 2023
13 Jun 2023
6 Jun 2023
12 Jun 2023
6 Jun 2023
Replacement of 44.45 mm. OD. x 3.66 mm. thick Super Heater Coil of WIL Boiler Cap. 30 Ton/ hr. The work schedule- Dismantling, Fabrication and erection with Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Dismantling, Fabrication and erection of Seamless nipple of 44.45 mm. OD. x 4.06 mm. Thick. x 150 mm. long (With Supply) of W.I.L./Taxmaco/VKW Boiler.
Dismantling, Fabrication and erection of Seamless nipple of 76.2 mm. OD. x 4.06 mm. Thick. x 150 mm. long (With Supply) of Boiler.
Dismantling, Fabrication and erection of Seamless nipple of 82.5 mm. OD. x 3.66 mm.Thick. x 150 mm. long of VKW. Boiler. (a) with supply
(b) without supply
Dismantling, Fabrication and fitting of 3” NB Schedule 40 circulation Tube of 30 TPH Texmaco Boiler with Hydraulic Testing at Desire pressure and Approval from Director Of Boiler’s Uttrakhand.
Rate of per welding joint of boiler tubes (a) 44.5mm.OD
(b) 63.5mm.OD
(c) 70.0mm.OD
(d) 76.2mm.OD
(d) 82.5mm.OD
Replacement of old & worn out Fins type economizer coils of WIL Boiler 30Ton/Hr by New supplied coils as per side requirement complete IBR Norms.
Supply of New Fins type Economizer Coils of WIL Boiler As per drawing.
Replacement of 63.5mm. OD x 3.66mm.Thick drum to drum tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 70mm. OD x 4.06mm.Thick Screen tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 70mm. OD x 4.06mm.Thick Side wall tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 70mm. OD x 4.06mm.Thick Roof Tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 76.2mm. OD x 4.06mm.Thick Relief Tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 76.2mm. OD x 4.06mm.Thick Circulation Tube of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 76.2mm. OD x 4.06mm.Thick Front Bank Tube of Taxmaco Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Supply of 10" NB x SCH- 100 x 8 meter Long Front Header with Niples of WIL Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 82.5mm. OD x 3.66mm.Thick Tube of VKW Boiler Cap.13.5Ton/Hr., 12 to 15meter long each. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Supply of Worn Out/week 101.6mm. O.D. x 4.06mm. Thick x 2meter long gilled type economizer tube, bend with MS Fins & both side flange of VKW Boiler Cap.13.5Ton/Hr. The include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
-do- Without Supply
Supply of new steam bend 101.6mm. OD x 4.06mm.Thick for VKW economizer according to IBR Norms.
Supply of Flange 101.6mm. OD x 4.06mm.Thick for VKW economizer according to IBR Norms.
Dismantling, Febrication & Erection of Steam Line according to IBR Norms
Dismantling, Febrication & Erection of Bend of Steam Line according to IBR Norms
Dismantling, Febrication & Erection of Flange of Steam Line according as per IBR Norms
Replacement of 76.2mm. OD x 4.06mm.Thick Riser Tube of Taxmaco Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
Replacement of 82.5mm. OD x 3.66mm.Thick Curculation tube of Taxmaco Boiler Cap.30Ton/Hr. The work include dismantling, febrication & erection Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand.
KAURA ENGINEERING WORKS
New Heat & Boilers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .