GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
Office of The General Manager (KUMAON), Nirman Wing, Uttarakhand Peyjal Nigam, HALDWANI
Construction of Enforcement Wing at ARTO Office in Rudrapur, District-Udham Singh Nagar
2026_MDPEY_98901_1
2155/nivida udham singh nagar/ 348 dt 7/8/2026
Open Tender
Civil Works
Item Rate
365 days
RUDRAPUR
as per tender documents
2 documents required · 2 mandatory
₹5,900
PM CONSTRUCTION UNIT UKPJN UDHAM SINGH NAGAR
₹3.0 L
GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
12 Aug 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
1 Sept 2026
19 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level Concrete of M30 grade with minimum cement content of 350 kg /cum | 163.57 | Cum | 9,823.59 | ₹16,06,844.62 |
| 2 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | 81.79 | QTL | 719.75 | ₹58,868.35 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 22,470.43 | KG | 105.83 | ₹23,78,045.61 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 176.04 | Sqm | 943.26 | ₹1,66,051.49 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 303.88 | Sqm | 722.59 | ₹2,19,580.65 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | 703.98 | Sqm | 909.86 | ₹6,40,523.24 |
| 7 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose.
The payment will be made once irrespective of duration of scaffolding. sqm 338.25
Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 466.92 | Sqm | 331.91 | ₹1,54,975.42 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 80.61 | Cum | 8,935.18 | ₹7,20,264.86 |
| 9 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | 482.61 | Sqm | 1,102.73 | ₹5,32,188.53 |
| 10 | Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry | 482.61 | Sqm | 102.83 | ₹49,626.79 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Drawings.pdf
Other Document • 0.22 MB
Tenderdocumetns.pdf
Tender Documents • 6.01 MB
BOQ_116671.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].