| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC AT ARGADA DISTT RAMGARH JHARKHAND | L1 | Accepted-AOC Techno Commercially accepted L1 Bidder | |
| 2 | L2₹4.9 L+₹52,837.75 (12.0%)Rejected-Finance | L2 | Rejected-Finance Rejected since L2 Bidder | |
| 3 | L3₹5.2 L+₹77,015.95 (17.5%)Rejected-Finance 4005 4TH FLOOR SKYLINE NEAR KADRU OVERBRIDGE KADRU RANCHI PIN 834008 | RANCHI | RANCHI | JHARKHAND | 834008 | L3 | Rejected-Finance Rejected since L3 Bidder | |
| 4 | L4₹5.8 L+₹1.4 L (32.2%)Rejected-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L4 | Rejected-Finance Rejected since L4 Bidder | |
| 5 | L5₹6.2 L+₹1.8 L (39.8%)Rejected-Finance JHARKHAND | LOHARDAGA | JHARKHAND | 835302 | L5 | Rejected-Finance Rejected since L5 Bidder |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
5 May 2023, 12:00 pmClosed
SO EnM ARGADA AREA
GM OFFICE ARGADA AREA
Online Oil Filtration and repairing/maintenance of different transformers installed at different locations of Sirka Colliery Under Argada Area.
2023_CCL_277765_1
SO(EnM)/AA/e-NIT/23-24/04
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Sirka Colliery
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
28 Jun 2023
25 Apr 2023
6 May 2023
25 Apr 2023
5 May 2023
25 Apr 2023
25 Apr 2023 - 2 May 2023
Amount
(A): 05 MVA, 33KV/11KV Power Transformer at 5 MVA Sub-Station Labour Charge for Operating Filter Machine
Cost of LT Bushing Insulator with Stud
Cost of Gasket
Complete Painting and cleaning of Transformer
Labour cost for Sl. No. 2 & 3
(B): 03 MVA, 33KV/3.3KV Power Transformer at 5 MVA Sub-Station Labour Charge for Operating Filter Machine
Complete Painting and cleaning of Transformer
(C): 01 MVA, 11KV/3.3KV Power Transformer at 5 MVA Sub-Station Labour Charge for Operating Filter Machine
Cost of LT Bushing Insulator with Stud
Complete Painting and cleaning of Transformer
Labour cost for Sl. No. 9
(D): 02 MVA, 11KV/3.3KV East India Electric Co. Make Power Transformer, Sl. No. 458A/2 at Power House Argada Area Labour Charge for Operating Filter Machine
Cost of Breather with Silica Gel
Cost of Buchholz Relay
Cost of Hooter
Cost of Oil Temperature meter
Cost of LT Bushing Insulator with Stud
Cost of Gasket
Complete Painting and cleaning of Transformer
Labour Cost from Sl. No.13 to Sl. No.18
(E): 01 MVA, 11KV/3.3KV Marsons Make Power Transformer Sl. No. 23534 at Kahuabera Labour Charge for Operating Filter Machine
Cost of Winding Temperature metr
Cost of Auxiliary Contactor
Cost of 2.5 Sq mm 4 core Alluminium Cabble
Cost of Breather with Silica Gel
Cost of LT Bushing Insulator with Stud
Cost of HT Bushing Insulator with Stud
Cost of Gasket
Complete Painting and cleaning of Transformer
Labour Cost from Sl. No. 22 to Sl. No. 28
(F) 01 MVA, 11 KV/3.3KV Marsons Make Power Transformer Sl. No. 22423/1982 at 45 no. Sub Station Labour Charge for Operating Filter Machine
Cost of Oil Temperature meter
Cost of Buchholz Relay
Cost of Breather with Silica Gel
Cost of LT Bushing Insulator with Stud
Cost of HT Bushing Insulator with Stud
Cost of Gasket
Complete Painting and cleaning of Transformer
Labour Cost from Sl. No. 32 to Sl. No. 37
Total impact of GST for the purpose of CTC
Drise Power Infratech Pvt Ltd
ForenTec Engineers Pvt. Limited
M/S ADITYA ENTERPRISES
M/s Achal Electricals
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_287532.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .