Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹18.6 L
Closing Date
10 Jun 2026, 11:00 am4d left
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
the reconstruction of damaged bridges located at Km 27.850, 27.550, 26.000, 24.850, 22.800, 19.100, and 18.600 of the Doharighat Main Canal, and at Km 0.400 of the Main Canal Escape, in Ballia District.
2026_UPIDC_1157080_7
04/SE/2026-27
Open Tender
Civil Works
270 days
Balllia
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹18.6 L
Yes
Superintending Engineer, Drainage Circle, Ballia
5 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of old V.R.B. and proper disposal including all cost of materials,T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 654.47 | Cum | - | - | 1 |
| 2 | Dismantling of old & damage Reinforced cement concrete slab and its proper disposal including all cost of materials, T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 234.2 | Cum | - | - | 2 |
| 3 | Earth work in excavation of foundation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 7,233.2 | Cum | - | - | 3 |
| 4 | Laying C.C. 1:2:4 M15 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 269.51 | Cum | - | - | 4 |
| 5 | Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for raft,pedestal,abutment,slab, pier cap,wing wall & parapet including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 3,907.51 | Cum | - | - | 5 |
| 6 | Providing & laying steel as reinforcement (TATA,SAIL,JINDAL) including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 242.21 | MT. | - | - | 6 |
| 7 | Centering and shuttering for Plain Cement Concrete work in foundation including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 133.62 | Sqm | - | - | 7 |
| 8 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 5,015.44 | Sqm | - | - | 8 |
| 9 | Supply and laying of joint filler board on abutment and wing wall and on slab joint including cost of all material labour T&P required for proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 194.42 | Sqm | - | - | 9 |
| 10 | Supply & Laying of tarfelt / Membrane sheet below for slab including cost of all material labour and T & P etc. with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 935.06 | Sqm | - | - | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.85 MB
BID07.pdf
Tender Documents • 1.51 MB
BOQ_2168303.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid