Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹77.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Clarke Energy India L1 |
|---|---|---|---|---|
| 1.00Major Overhauling of Waukesha Make Gas Engine Unit-C & F at GGS 1 Gandhar. | ||||
| 1.01 | Lump sum charges (excluding taxes) for dismantling of auxiliary system, and external & internal parts as per scope of work | 2 | AU | 7,96,373.55 ₹15,92,747.1 Lowest |
| 1.02 | Lump sum charges (excluding taxes) for individual Cleaning and inspection of the dismantled engine components as per Scope of Work. | 2 | AU | 8,14,856.61 ₹16,29,713.22 Lowest |
| 1.03 | Lump sum charges (excluding taxes) for Checking / Overhauling of engine parts and assembly of engine parts as per scope of work. | 2 | AU | 9,95,001.93 ₹19,90,003.86 Lowest |
| 1.04 | Lump sum charges (excluding taxes) for commissioning and trial run of engine (incl. Painting) as per scope of work. | 2 | AU | 2,47,768.3 ₹4,95,536.6 Lowest |
| 2.00Centreline Boring of Crankcase of Unit #F of GGS #1 Gandhar. | ||||
| 2.01 | Centreline boring of Crankcase (MB Pockets) of P9390GSI Engine | 1 | AU | 20,18,000 ₹20,18,000 Lowest |
Tender Value
Refer Docs
Closing Date
14 May 2026, 3:00 pmClosed
Atul Kumar Patidar
OFFICE OF THE HPO and MIC ONGC Ankleshwar Asset Ankleshwar-GUJARAT
Major Overhauling of Waukesha Make Gas Engine Unit C and F and Centreline Boring of Crankcase of Unit F of GGS 1 Gandhar through OEM OES
2026_ONGC_275496_1
A15AS26001
Single
Miscellaneous Works
Works
365 days
ONGC ANKLESHWAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
15 May 2026
23 Apr 2026
15 May 2026
23 Apr 2026
14 May 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Major Overhauling of Waukesha Make Gas Engine Unit-C & F at GGS 1 Gandhar. | |||||
| 1.01 | Lump sum charges (excluding taxes) for dismantling of auxiliary system, and external & internal parts as per scope of work | - | AU | - | - |
| 1.02 | Lump sum charges (excluding taxes) for individual Cleaning and inspection of the dismantled engine components as per Scope of Work. | - | AU | - | - |
| 1.03 | Lump sum charges (excluding taxes) for Checking / Overhauling of engine parts and assembly of engine parts as per scope of work. | - | AU | - | - |
| 1.04 | Lump sum charges (excluding taxes) for commissioning and trial run of engine (incl. Painting) as per scope of work. | - | AU | - | - |
| 2Centreline Boring of Crankcase of Unit #F of GGS #1 Gandhar. | |||||
| 2.01 | Centreline boring of Crankcase (MB Pockets) of P9390GSI Engine | - | AU | - | - |
stage.html
html • 0.02 MB
finance_321809.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Notes_of_Price_format.pdf
Tender Documents • 0.13 MB
SOWSCC.pdf
Tender Documents • 0.22 MB
Annexure_I_II.pdf
Tender Documents • 1.20 MB
BOQ_321809.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].