| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 CrAccepted-AOC VILL ANKHIRAPARA P O CHAKVRIGU DIST DAKSHIN DINAJPUR PIN 733102 | DAKSHIN DINAJPUR | WEST BENGAL | 733102 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹20.7 Cr+₹39.2 L (1.93%)Rejected-Finance 38 SARKAR BAGAN TALPUKUR BARRACKPORE NORTH 24 PARGANAS WEST BENGAL 700123 | 24 PARAGANAS NORTH | WEST BENGAL | 700123 | L2 | Rejected-Finance 2nd lowest bid value | |
| 3 | L2₹20.7 Cr+₹39.2 L (1.93%)Rejected-Finance PURBA ASHOKPALLY NH 34 P O RAIGANJ P S RAIGANJ DIST UTTAR DINAJPUR | RAIGANJ | UTTAR DINAJPUR | WEST BENGAL | 733134 | L2 | Rejected-Finance 2nd lowest bid value | |
| 4 | L3₹21.2 Cr+₹97.1 L (4.79%)Rejected-Finance 114 3 KASUNDIA ROAD HOWRAH 711101 | HOWRAH | WEST BENGAL | 711101 | L3 | Rejected-Finance 3rd lowest bid value |
Tender Value
₹19.3 Cr
EMD Value
₹10 L
Closing Date
18 Aug 2023, 3:42 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, Northern Circle, PWD
O/o the S.E., N.C, PWD, Mangalbari, Malda
Raiganj Kaliyaganj Buniadpur Road (SH-10A) Ch. from 35.00 Km. to 55.60 Km. - Strengthening work under Dakshin Dinajpur Division.
2023_WBPWD_546871_2
WBPWD/SE/NC/NIT_04/2023-24
Open Tender
CIVIL WORKS
Percentage
300 days
Buniadpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹10 L
Yes
O/o the S.E., N.C, PWD, Malda
10 Nov 2023
13 Jul 2023
19 Nov 2025
13 Jul 2023
18 Aug 2023
17 Jul 2023
25 Jul 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COST OF ROAD WORK By mechanical means (with milling machine) : Cold milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under laying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-charge. | |||||
| 1.01 | For depth upto 100mm | 1,51,347.6 | Sqm. | 46 | ₹69,61,989.6 |
| 2 | Granular Sub-base with Graded Material (Table:- 400-1)
Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Grading – III
Using Pakur variety Stone aggregates & medium sand. | 214.2 | Cum. | 2,218.69 | ₹4,75,243.4 |
| 3 | Water Bound Macadam Sub Base
Water Bound Macadam Sub Base by consolidating Jhama metal of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening :
For 1 cum compacted volume using 1.09 cum of jhama metal and 0.26 cum of moorum screening (loose volume) | 2,665.79 | Cum. | 2,457.17 | ₹65,50,299.21 |
| 4 | Construction of Sub Base using Local Materials:
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by compacting stone chips (picking up materials by milling) | 4,237.73 | Cum. | 210 | ₹8,89,923.3 |
| 5 | Wet Mix Macadam Base Course
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Using Pakur variety Stone aggregates. | 535.5 | Cum. | 2,428.9 | ₹13,00,675.95 |
| 6 | Tack Coat
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including
cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
On Bituminous Surface (Using Bitumen Emulsion RS-1 grade (Bulk) at the rate of 0.25 kg per sqm.) | 3,03,016.5 | Sqm. | 8.48 | ₹25,69,579.92 |
| 7 | Dense Bituminous Macadam
Providing and laying dense bituminous macadam with Hot Mix Plant producing an average output of 75 tonnes per hour using coarse aggregate, fine aggregate, filler and bituminous binder as per design
Job Mix Formula conforming Marshall Method as per specification, including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, hand packing and pinning to give an even surface including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Grading 1 (37.5 mm nominal size, 75 mm compacted thickness.)
Using Batch Type HMP of minimum capacity 100-120 TPH.
Using Pakur variety Stone aggregates, Hydrated Lime Powder and VG-40 (Bulk) grade bitumen. | 11,375.17 | Cum. | 7,375.87 | ₹8,39,01,775.15 |
| 8 | Bituminous Concrete
Providing and laying bituminous concrete with Hot Mix Plant using coarse aggregates, fine aggregates, filler materials and bituminous binder of required specification including screening, cleaning of chips
and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 507 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Grading 2 (13.2 mm nominal size, 30 mm compacted thickness.)
Using Batch Type HMP of minimum capacity 100-120 TPH.
Using Pakur variety Stone aggregates, Hydrated Lime Powder and VG-40 (Bulk) grade bitumen. | 4,550.07 | Cum. | 8,505.41 | ₹3,87,00,210.88 |
| 9 | Supplying and laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658:2006) manufacured in steel mould clamped to a vibrating Table by hydraulic pressure (as per cl. no. 6.30 of IRC : SP: 63 (2018), from BIS license manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No. 3.26 of IS: 15658) and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per Cl. No. 3.3 of IS: 15658) as per Table 2 of IS: 15658 with flexural strength/breaking load as per Annexure G of IS: 15658, on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of he bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP-63) and completing the edges with cut blocks as per Cl. No. 8.7 of IRC SP-63 (2018) with proper confinement of bedding and joint filling sand, compaction, levelling and filling up of the edge gap.
120 mm thick.
Grey | 2,142 | Sqm. | 1,586 | ₹33,97,212 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1136627.xls
BOQ Document • 1.00 MB
124963472.pdf
Tender Document • 0.41 MB
FORM2911.pdf
Tender Document • 25.74 MB
124963481.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .