Tender Value
₹3.7 Cr
EMD Value
₹3.7 L
Closing Date
18 Aug 2026, 6:00 pmClosed
Directorate of Archaeology & Museum, Gandhinagar
Conservation, Restoration, and Structural Retrofitting of Shiva temple, Village Kera, Kutch, Gujarat
322935
Shiva Temple - 2026-2027
Open
Civil - All
Works
Gandhinagar
4 documents required · 4 mandatory
₹6,000
Directorate of Archaeology and Museums, Government of Gujarat, Gandhinagar payable at Gandhinagar
₹3.7 L
18 Aug 2026
10 Jul 2026
20 Aug 2026
10 Jul 2026
18 Aug 2026
10 Jul 2026
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
SECTION A: EARTH WORK
Excavation for foundation upto 1.5 m depth including sorting out
Two Hundred Ten
and stacking of useful materials and disposing off the excavated
1.0 210.42 Rupees and Forty Two cum 114.75
stuff upto 50 Meter lead.(A) Loose or soft soil. (Note : For Plinth
Paisa Only
Protection)
Add extra for Disposing off the excavated stuff of above items for
Thirty Four Rupees and
2.0 lead of (B) 100 m to 200 m 34.56 cum 91.80
Fifty Six Paisa Only
Filling available excavated earth (excluding rock) in trenches.
One Hundred Thirty
plinth, sides of foundations etc. in layers not exceeding 20 cm. in
3.0 135.56 Five Rupees and Fifty cum 30.60
depth consolidating each disposited layer by ramming and
Six Paisa Only
Providing and excavating trial pits manually for exposing
foundations and sub soil conditions, including shoring, dewatering
(if required) and Archaeological excavation over areas (till the level
where any remains are found) around heritage structure without
damaging the buried architectural part of the building including
One Thousand Three
screening, collecting and depositing the usable objects/ articles at
4.0 1,328.00 Hundred Twenty Eight cum 72.00
the specified place including backfilling of remaining excavated
Rupees Only
soil, compaction and restoration of surface complete and disposal
of the source in the authorised dumping ground if required as per
direction of the Archaeological Engineer.
Technical/scientific clearance to be done manually by way of
carefully clearing debris and earth inside the heritage structure as
per the drawing. It also includes to avoid any damage to the
heritage structure or structure underneath, without causing any
One Thousand Seven
vibrations and jerks to the superstructure. It also includes duly
Hundred Twelve
5.0 constructing centring, struting & form work to avoid any untoward 1,712.75 cum 160.20
Rupees and Seventy
incident and getting out the excavated material manual lead
Five Paisa Only
approx. 50 mtr away from site.
Note: Item is to be considered only if advised by conservation
architect or archaeological engineer.
Subtotal of Section A
Rounding off - Total of Section A ₹4,01,465.00
SECTION B: DOCUMENTATION
SORTING, DOCUMENTATION OF ARCHITECTURAL MEMBERS AND
REFIXING : Clearance of Architectural stone elements and loose
stone pieces from within the site extents without damaging the
existing structures on site including sorting, lifting,
numbering/temporary marking, documentation and safely
Nine Hundred Two
6 stacking of all the intact parts at proper place for reuse at the time 902.00 cum 483.00
Rupees Only
of restoration work as per direction of Archaeological Engineer/
Conservation architect/ Engineer-in-charge including disposal of
debris to nearest Municipal dumping ground.
Extra for numbering, lifting and stacking the antiquities in stores
Eight Hundred Sixty
7.0 up lead of 50m as directed by Conservation Architect/ 860.00 cum 70.00
Rupees Only
Archaeological Engineer.
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Comprehensive Photographic Documentation of Site and including
systematic photographic recording of the site, architectural
elements, artefacts, dismantling, conservation interventions,
cataloguing activities, storage arrangements, sorting process, and
reinstallation works. The scope shall cover during-conservation,
and post-conservation stages, with periodic site visits as required
during the execution period. The photographer shall use
professional DSLR/Mirrorless equipment with appropriate lenses
and lighting accessories to capture high-resolution images suitable
for conservation records, technical reports, and archival purposes.
Fifty Eight Thousand
The work shall include image sorting, metadata tagging, indexing,
8.0 58,075.00 Seventy Five Rupees Job 2.00
cataloguing, date-wise organization, digital archiving, and
submission of edited photographs in both RAW and high-
resolution JPEG/TIFF formats. Complete photographic
documentation shall be submitted in organized digital folders
along with a photographic register/caption sheet indicating
location, subject, date, and description of each image. All
photographs and associated copyrights for project documentation
purposes shall remain with the Client. Complete Job on Lump Sum
Providing services of Draughtsman for Documentation and
Cataloguing of Archaeological Material including preparation of
measured sketches, recording of dimensions, preparation of
cataloguing sheets, numbering and identification of architectural
fragments, preparation of CAD drawings, digital documentation, Twenty Nine Thousand
9.0 29,038.00 per month 6.00
sorting records, inventory schedules, and compilation of Thirty Eight Rupees Only
documentation before and after conservation works complete as
directed by the Engineer-in-Charge/Conservation Architect.
Subtotal of Section B
Rounding off - Total of Section B ₹7,86,244.00
SECTION C : STONE WORK AND STRUCTURAL RETROFITTING
Uncoursed Rubble Masonry with hard stone of approved quality in Two Thousand Four
foundations and plinth in Lime Mortar 1:1.5 (1-Lime : 1.5-coarse Hundred Seven Rupees
sand including levelling up etc. complete and Forty Three Paisa
Consolidation of stone work in plain ashlar masonry in
superstructure upto 18 m of height in lime mortar 1:2:1/4 (1 lime:
2 coarse sand: 1/4 surkhi) including dismantling loose masonry,
cleaning of reusable stone, masonry work, pointing with lime Twenty Seven
11.0 mortar all complete (wherever required) : One face dressed 27,201.00 Thousand Two Hundred cum 75.31
Sandstone (stones properties matching the existing as on site) One Rupees Only
and considering 80% reusable stone to be done as per the
directions of Conservation Architect.
Consolidation of stone work in plain ashlar masonry in
superstructure upto 18 m of height in lime mortar 1:2:1/4 (1 lime:
2 coarse sand: 1/4 surkhi) including dismantling loose masonry,
cleaning of reusable stone, masonry work, pointing with lime Forty Four Thousand
12.0 mortar all complete (wherever required) : Both face dressed 44,823.00 Eight Hundred Twenty cum 101.28
Sandstone (stones properties matching the existing as on site) and Three Rupees Only
considering 80% reusable stone to be done as per the directions of
Conservation Architect.
Stone work in plain ashlar masonry in superstructure upto 18 m of
height in lime mortar 1:2:1/4 (1 lime: 2 coarse sand: 1/4 surkhi)
Fifty Eight Thousand
including pointing with lime mortar and an admixture of pigment
One Hundred Five
13.0 matching the stoneshade (wherever required)One face dressed - 58,105.26 cum 37.66
Rupees and Twenty Six
Sandstone (stones properties matching the existing as on site).
Paisa Only
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Stone work in plain ashlar masonry in superstructure upto 18 m of
height in lime mortar 1:2:1/4 (1 lime: 2 coarse sand: 1/4 surkhi)
including pointing with lime mortar and an admixture of pigment Seventy One Thousand
14.0 matching the stoneshade(wherever required): Both face dressed - 71,700.16 Seven Hundred Rupees cum 50.04
Sandstone (stones properties matching the existing as on site). and Sixteen Paisa Only
Underpinning stonework in lime mortar with stone course of the
historic structure in traditional stone masonry with same stone for
substructure by joining old stonework with new stonework by Fifty Seven Thousand
making grooves 5 cm deep in alternate course of old stonework, Two Hundred Twenty
including inserting pinning stones, filling of joints and grouting Five Rupees and Forty
with hydraulic grout mix, all work complete as per the directions Three Paisa Only
of Engineer-in-charge
Stitching of structural cracks present in stone masonry by opening
the cracks and replacing the fractured stone using matching stone
& traditional lime mortar prepared as per the directions of Sixty Eight Thousand
Conservation Architect after cleaning and washing the cracks. All Eight Hundred Forty
work complete including cost of all leads, lifting of materials, Rupees and Forty Three
labour, machinery, curing and cleaning the site as per the Paisa Only
directions of Engineer-in-charge
Removing/ dismembering of disturbed 'Architectural and
Structural block' (stone blocks) of 'Shikhara' without damaging the
parts by mechanical/manual system carefully with proper marking
One Thousand Eight
and complete documentation including all scaffolding and
17.0 1,857.00 Hundred Fifty Seven sqm 170.02
shuttering work, stacking the useful architectural parts in proper
Rupees Only
sequence at proper place as per direction of Engineer incharge (for
all lead and lift.)
Refixing of 'Architectural and Structural block' (stone blocks) of
'Shikhara' without damaging the parts by mechanical/ manual One Thousand Nine
18.0 system with proper sequence, including all scaffolding and 1,960.00 Hundred Sixty Rupees sqm 136.02
shuttering work as per direction of Engineer incharge. Only
Providing and fixing locally available Sandstone blocks, make
shape as per original (as per site and architectural profile)
including chiselling out bit by bit old decayed stone without
disturbing to the adjoining stone and including supply of all
Fifty Seven Thousand
19.0 materials T&P etc. required for proper completion of work. All the 57,019.00 cum 165.38
Nineteen Rupees Only
new stones should be time stamped/engraved (as per the year of
execution works) in order to distinguish between old and new
Refixing of out of plumb sandstone columns including propping,
shoring of existing column and supporting beam and roof,
realigning in position by removing the existing column, providing
Five Thousand Four
levelling course at the base, refixing member in position and
20.0 5,407.40 Hundred Seven Rupees each 12.00
removal of propping after the assembly is set. The work should be
and Forty Paisa Only
carefully done under the supervision of the Archaeological
Engineer, Structural Engineer and Conservation Architect.
Providing and fixing locally available sand stone columnswith
bracket and make shape as per original (as per site and
architectural profile) including chiseling out bit by bit old decayed
Fifty Two Thousand
stone without disturbing to the adjoining stone and including
One Hundred Sixty Six
21.0 supply of all required materials labour T&P etc. required for 52,166.95 cum 13.68
Rupees and Ninety Five
proper completion of work. All the new stones should be time
Paisa Only
stamped/ingraved (as per the year of execution works) in order to
distinguish between old and new stones.
Providing and fixing sand stone drains of size as found on site,
make shape as per original (as per site and architectural profile)
including chiselling out bit by bit old decayed stone without
Fifty Three Thousand
disturbing to the adjoining stone and including supply of all
Four Hundred Seventy
22.0 materials T&P etc. required for proper completion of work. All the 53,474.49 cum 9.72
Four Rupees and Forty
new stones should be time stamped/ingraved (as per the year of
Nine Paisa Only
execution works) in order to distinguish between old and new
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Providing and fixing stone dowels 10x5x2.50 cm cut to double
wedge shape as per design in lime mortar 1:1:1 (1 lime : 1 surkhi : One Hundred Twenty
1 coarse sand), including making the necessary chases. Nine Rupees Only
Providing and fixing 304 grade stainless steel 10 cm long 8mm
diameter pins for securing adjacent stones including making the One Hundred Twenty
necessary chases and good the same as per direction of Engineer- Three Rupees Only
in-charge.
Providing and fixing copper pins 7.5 cm long 6 mm diameter for
Thirty Three Rupees
25.0 securing adjacent stones in stone wall lining in lime mortar, 33.00 each 340.00
including making the necessary chases.
Providing and fixing stainless steel cramps of required size and
Five Hundred Eighty
shape for anchoring stone or securing adjacent stones in stone
Two Rupees and
26.0 wall lining in lime mortar , including making the necessary chases 582.23 Kg 50.00
Twenty Three Paisa
in stone and holes in wallswherever required.
Stone work, plain (regular cross section with simple
chamfering/recessing or molding) in copings upto 75 mm thick in
Sixty Three Thousand
lime mortar1:2:1/4 (1 lime: 2 coarse sand: 1/4 surkhi), including
27.0 63,407.00 Four Hundred Seven cum 5.06
pointing with lime mortar lime mortar 1:2:1/4 (1 lime: 2 coarse
Rupees Only
sand: 1/4 surkhi) with an admixture of pigment matching the
stone shade.
Providing and fixing of high tensile 304 grade reinforcement
helical bars of 6mm dia, single bar in one slot, MOC Austenitic
stainless steel, ASTM 304, cross section area of 8sqmm, pitch
29/30, with ultimate tensile strength not less than 9.80 kN, shear
strength 5.5kN, along with special Grout provided by
manufacturer, a special cementitious grout with low expansion,
non gassing and injectable with exceptional non shrink thixotropic
properties having compressive strength at 28 days of not less than
45 N/sqmm.Including chasing of slot in mortar bed upto a depth Four Thousand Four
28.0 of 40mm for helical bars, cleaning the dust and debris from the 4,461.00 Hundred Sixty One m 150.00
slot, making damp with water to achieve good bonding of helical Rupees Only
bar with grout in the groove of brick/ stone masonry ensuring that
it remains tight at the joint after curing, including all tools, tackles
and equipments using specified machines, excluding Staging &
Scaffolding, at various places where there is crack in
brick/stone/block masonry as per the spacing specificed by
structural engineer in charge.
Providing and fixing of high tensile 316 grade reinforcement
helical solid bars of 8 mm dia having helical cross section, MOC
Austenitic stainless steel, with ultimate tensile strength not less
than 1370 N/sqmm, along with special cementitious Grout with
low expansion and injectable with non shrink thixotropic
properties of compressive strength of grout at 28 days of not less
than 45 N/sqmm (special grout shall be used as recommended by
manufacturer of helical bars, including cost of grout and labour)
including cutting chases of required size in existing mortar
bed/joints of masonary upto a depth of 40mm for helical bars, Five Thousand Four
29.0 cleaning the dust and debris from chase, making damp with water 5,489.00 Hundred Eighty Nine m 20.00
to achieve good bonding of helical bar with grout in the groove of Rupees Only
brick/ stone masonry ensuring that it remains tight at the joint
after curing with single bar in one slot, including all tools and
equipments, machinery (but excluding Staging & Scaffolding), at
various places to arrest cracks in brick/stone/block/concrete
masonry at required spacing as decided complete as per direction
of Engineer-in-Charge.
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Providing and fixing 316 grade stainless steel tie rods of 12 mm dia
solid with stainless steel fork ends having cadmium coating of
matching shade of existing tie rods in the building including
making threads on each end as per required length and depth and
placing & anchoring the same in core drilled holes in the existing
stone / brick /concrete masonry as directed by Engineer-in-charge
Six Hundred Ninety
30.0 and anchored into the masonry on both sides with approved grout 698.00 m 20.00
Eight Rupees Only
in arches, vaults, abutments and other similar locations with SS
plates of required thickness and washers of SS 304 grade including
screwing, bolting and tightening in position all complete including
all equipment and labour required for completion of work.
Providing and fixing of high tensile reinforcement helical pins /
Ties of 10mm dia. and specified length into a predrilled hole of not
more than 8mm dia. MOC Austenitic stainless steel, with ultimate
tensile strength not less than 1750 N/sqmm along with
specialised grout provided by manufacturer, a special
cementitious grout with low expansion and injectable with non
shrink thixotropic properties having compressive strength at
days of minimum 45N/sqmm and specified length along with
Seven Thousand Fifty
31.0 grout. Including drilling of holes for Ties upto 15 mm more than 7,054.00 m 50.00
Four Rupees Only
the specified depth, cleaning the dust and debris from the hole
and making damp with water ensuring to achieve good bonding of
Tie with grouting in the holes of masonry ensuring that it remains
tight after curing, at locations as per directions of Engineer in
charge including all tools and equipments using specified
machines, excluding Staging & Scaffolding.
Providing and grouting pre-packed ready to use grout made up of
natural hydraulic lime with the addition of natural pozzolona filler,
specially designed for use in restoration of old brick/stone
masonry. The grout material shall have low (less than 1.5%) water
soluble salt content, Elastic modulus not less than 5 Gpa and
minimum compressive strength of 18 N/sqmm at 28 days. Mix the
product by introducing 3/4 of the required water (which is 7-8
litres of 25 kg or as per manufractures specification) into the
mixer. Add continuosly the product and the remaining water until
perfect mixer having a fluid consistency is achived. Inject the same
with gravity or mechanized equipment with pressure minimum 2 Two Hundred Nine
kg/cm2 to 4kg/cm2 as per site conditions by means of injection Rupees Only
technique . The item shall include all cost of materials, machinery
and labour etc. complete in all respect. (The payment shall be
made on the basis of actual weight of approved grout injected into
the cracks /voids excluding wastage. In case of honeycombed
area, each grout hole shall be grouted individually. the item
includes all cost of materials, machinery and labour etc. complete
in all respect as per the direction of Engineer -In - charge
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Providing & fixing mechanical grouted sock anchor system of
approved make comprising of grade 304 high strength 16 mm dia
stainless steel ribbed bar/stud with threaded ends having 0.2%
Proof Load of 450 N/mm² for bonding stone/brick
masonry/concrete including drilling upto 36 mm dia and depth
mm more than the required length of the anchor encased with a
specially designed sock allowing itself to inflate when the grout is
pressure filled untill the grout bleeds out of the sock micromesh so
as that the sock balloons itself into the voids around the drilled
hole, thus creating a chemically grouted mechanical anchor. The
Twenty Two Thousand
grout should be specially formulated cementitious Portland
33.0 22,824.00 Eight Hundred Twenty m 5.00
cement mix having minimum compressive strength of 65 N/mm²
Four Rupees Only
at 28 Days. Grouting should be done with a pressure pot by
maintaining 3 to 4 bar pressure during the installation/fixing. It
must be ensured that the Sock must inflate to its full capacity into
the pre-drilled holes. All operations are inclusive of all inputs but
excluding staging & scaffolding complete as per direction of
Engineer-in-Charge. Note: The length of anchor shall be as per
structural engineer/as dicided by Engineer-in-Charge.
Providing and fixing sloping chajja of stone as measured on site
with required thickness and profile matching the existing chajja
including fixing of existing nearby chajja along the slope with lime
Thirty One Thousand
mortar 1:2:1/4 (1 lime : 2coarse sand: 1/4 surkhi) with 12 mm
34.0 31,749.00 Seven Hundred Forty Cum 2.21
diameter anchoring steel bar, 45 cm long, fixed in each stone
Nine Rupees Only
including pointing in lime mortar 1:2 (1 lime: 2 stone dust) with an
admixture of pigment matching the stone shade.
Providing and fixing stone jali throughout matching the stone jali
found on site in profile, texture, design, composition and fixing
with required pins, and lime mortar with an admixture of pigment,
Fifty Five Thousand
35.0 matching the stone shade, jali slab with chamfering etc. complete 55,016.00 Cum 1.58
Sixteen Rupees Only
as per approved drawing and design and direction of the
conservation architect and Engineer-in-charge.
Subtotal of Section C
Rounding off - Total of Section C ₹2,84,99,977.00
SECTION D : FLOORING AND PLINTH PROTECTION
Providing and laying in foundation and plinth / under floors lime
Two Thousand Eight
concrete with hand broken stone aggregates 40mm nominal size
Hundred Seventy Five
36.0 and 40% mortar comprising of lime mortar 1:2:1/4 (1 lime: 2 2,875.95 cum 96.55
Rupees and Ninety Five
coarse sand: 1/4 surkhi) and curing complete excluding cost of
Paisa Only
Filling in plinth with sand under floors including watering,
Four Hundred Seventy
ramming, consolidating and dressing complete.
37.0 477.03 Seven Rupees and cum 86.76
Three Paisa Only
Surface dressing of the ground including cleaning of site
vegetation, weeds, shrubs and in equility etc. by using different
Twenty Nine Rupees
38.0 means, techniques etc. that suits the most upto the depth of 15cm 29.00 sqm 1375.00
including malba removal and disposal upto a lead of 50m.
Removing/ dismembering of disturbed stone 'Flooring' carefully
with proper marking and complete documentation carefully and One Thousand Six
39.0 stacking useful slab at proper place as per direction of 1,637.00 Hundred Thirty Seven sqm 671.88
Archaeological Engineer/ Engineer Incharge in proper sequence. Rupees Only
Refixing of existing stacked stone block (reuseable) and fixing over
50mm thick base of grinded lime surkhi/ sand mortar 1:2 and
jointed with lime cream and stone powder 1:1 complete in all
One Thousand Five
respect with all lead and lift. To be done as per the directions of
40.0 1,535.00 Hundred Thirty Five sqm 268.75
Archaeological Engineer and Conservation Architect. Note : All the
Rupees Only
stones are to be fixed in place following the documentation and
numbering sequence.
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Providing and fixing sandstone Dhrangadra Sandstone flooring
matching the size and properties of existing flooring over 20mm
(average) thick base of lime mortar 1:2:1/4 (1 lime: 2 coarse sand:
Four Thousand Five
1/4 surkhi), including pointing with lime mortar 1:2:1/4 (1 lime:
41.0 4,581.00 Hundred Eighty One sqm 421.63
coarse sand: 1/4 surkhi). All the new stones should be time
Rupees Only
stamped/ingraved (as per the year of execution works) in order to
distinguish between old and new stones.
Subtotal of Section D
Rounding off - Total of Section D ₹38,02,836.00
SECTION E : FINISHING WORK
Raking out joints of stone masonry surface to the required width
and depth, with due care and precaution, by mechanical/ manual
means, including preparing and cleaning the surface for re- Fifty Nine Rupees and
pointing/ refilling of joints, including disposal of rubbish to the Forty One Paisa Only
dumping ground within 50 metres lead.
Pointing of raked out joints of Ashlar masonry by using lime
Four Hundred Fourteen
43.0 mortar lime mortar 1:2:1/4 (1 lime: 2 coarse sand: 1/4 surkhi). 414.00 sqm 376.56
Rupees Only
Pointing to be done till the depth of 25-50mm.
Cleaning of sandstone surface by supplying and cleaning with bio-
degradable, non toxic, non hazardous, fast acting cleaner against
algae (Guard Wash Express - Product code 1415 - or equivalent). Two Hundred Forty
The surface of the stone should not be damaged/discoloured Three Rupees Only
during application of the cleaning materials.
Removal of algae deposits, dirt, blackening , dust, bird dropping,
grease, oil, algae, fungus, monkey beats, vegetable growth etc.
with High Performing Nonionic Surfactant of with water by
providing, applying and washing/cleaning the surface with non
ionic soap solution and other cleaning agent as approved by
Engineer-in-charge, of approved brand and manufacturer,with
the help of required scrubbers. Nonionic sulfur based
polyoxyethylene surfactant can be diluted with water. A typical
dilution range is between 1 and 5% by volume.The soap solution
should be mild & recommended ph. value is 7 and procedure shall
be done without causing any scratching/ damage to the surface One Hundred Twenty
and finally washing the surface with clean water complete in all Four Rupees Only
respect, including taking all precautions to safeguard ventilators,
windows, doors etc. by suitable covering so as to avoid any
damage to the building/ structure, all as per direction of Engineer-
in-charge. Note:The rate is inclusive of all materials & labours
involved except scaffolding. Soft brushes and scotch brite should
be used for cleaning surfaces all complete as per direction of
Engineer-in-Charge. The procedure of cleaning shall be approved
by Engineer In charge and heritage consultant before taking up the
work. (The rate is inclusive of all materials & labours involved
except scaffolding).
Impregnation and protection of sandstone surface by application
of solvent based, non film forming and biodegradabe deeply
consolidating sealer (Gu Hardener WO - Product code 7204 - or
equivalent) based on ethyl silicate and fluoropolymer technology.
The product should be water, oil and stain repellent with anti dirt
property and shall protect against weather, humidity, frost, high
temperature, UV radiation. The product should be breathable and
Three Hundred Rupees
46.0 treated material should remain permeable to air and water 300.00 sqm 560.38
vapour. It should not change the appearance of the material
surface. It should durably protect against degradation and
applicable for consolidating inorganic, porous, poorly cohesive
materials and for restoring old monuments in natural stone.
Subtotal of Section E
Rounding off - Total of Section E ₹5,63,239.00
SECTION F : FORM WORK AND SCAFFOLDING
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
Providing and fixing double scaffolding system (cup lock type) on
the exterior side of building/structure, upto 25 metre height,
above ground level, including additional rows of scaffolding in
stepped manner as per requirement of site, made with 40 mm dia
M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical
tubes joint with cup & lock system with M.S. Tubes, M.S. tube
challis, M.S. clamps and staircase system in the scaffolding for
working platform etc. and maintaining it in a serviceable condition
for execution of work of cleaning and/ or pointing and/ or applying Two Hundred Seventy
47.0 chemical and removing it thereafter. The scaffolding system shall 277.37 Seven Rupees and sqm 786.00
be stiffened with bracings, runners, connecting with the building Thirty Seven Paisa Only
etc, wherever required, if feasible, for inspection of work at
required locations with essential safety features for the workmen
etc., complete as per directions and approval of Engineer-in-
Note:- (1) The elevational area of the scaffolding shall be measured for
payment purpose. (2) The payment will be made once only for execution of all
items for such works.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
Two Hundred Forty
ceiling not exceeding 4 M. and removal of the same for in situ
47.0 244.76 Four Rupees and sqm 549.25
reinforced concrete and plain concrete work in. (C) Vertical surface
Seventy Six Paisa Only
such as walls (any thickness) partitions and the like including
attached buttresses & string course & the like.
Providing and fixing scaffolding net of required width made of high
density Polyethylene UV stabilized knitted on warp knitting
machines having density 100 gram / sqm and shading coefficient
minimum 75% around the construction site/ for vertical extension
as per requirement including fastening/tying with building/
Twenty Three Rupees
scaffolding pipes or with any other fixtures etc. complete as per
48.0 23.99 and Ninety Nine Paisa sqm 1,827.00
direction of Engineer-in-Charge. (One time payment shall be made
for providing Scaffolding net from start of work till completion of
work including shifting if any. The Scaffolding net shall be the
property of the contractor on completion of the work).
Propping and supporting the structural roof, leaned walls, and
other structural components with tubular steel props of 4 MT
capacity and up to 3 metre height (adjustable as required) to using One Thousand Eight
49.0 pipes, channels, bracings, runners, etc. to relieve the structural 1,872.00 Hundred Seventy Two sqm 592.38
member of the required load coming over it as per the pattern Rupees Only
given by the contractor and approved by Engineer-in-charge
Subtotal of Section F
Rounding off - Total of Section F ₹15,05,207.00
SECTION G : SITE CLEARANCE AND DISMANTLING WORK
Clearing and grubbing road land including uprooting rank
Eighty Three Thousand
vegetation grass bushes, shrubs, sapling and trees girth up to
Four Hundred Twenty
mm removal of stumps of trees cut earlier and disposal of
50.0 83,421.77 One Rupees and hectare 0.14
unserviceable materials(A) By manual means in area of light jungle.
Seventy Seven Paisa
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
De-vegetation of small plants, bushes and rank vegetation from
masonry/structures including including suitable chemical
One Hundred Forty
treatment to roots to avoid further growth including disposal of
51.0 140.54 Rupees and Fifty Four sqm 740.48
rubbish to nearest Municipal dumping ground. Lead as per
Paisa Only
direction of Engineer incharge.
Demolition and disposal of unserviceable materials with all lead Six Hundred Sixteen
52.0 and lift.(i) cement concrete 616.85 Rupees and Eighty Five cum 23.70
Paisa Only
Demolition of brick work and stone masonry including stacking of
Five Hundred Fifty
serviceable materials and disposal of unserviceable materials with
53.0 557.32 Seven Rupees and cum 103.50
all lead and lift.(ii) In Cement Mortar.
Thirty Two Paisa Only
Dismantling doors, windows, ventilators etc. (wood or steel)
One Hundred Ninety
shutters including chowkhats architraves, holdfasts and other
54.0 190.19 Rupees and Nineteen each 8.00
attachment etc. complete and stacking them within all lead and
Paisa Only
lift.(i) Not exceeding 3 Sq.M. in area.
Demolition including stacking of serviceable materilas and disposal
One Thousand Seventy
of unserviceable materials with all lead and lift. (i) R.C.C. work
55.0 1,071.63 One Rupees and Sixty cum 11.98
Three Paisa Only
Manual removal of algae, lichen, mosses etc. with knife blades,
spatula and stiff bristle or soft wire brushes without damaging the
56.0 substrate under the supervision of Conservator and disposal of 60.00 Sixty Rupees Only sqm 168.11
waste to nearest municipal dumping ground.
Careful removal, hoisting and lowering of debris and collapsed
parts from 5m to 15m using pulley or any other mechanical
means, and sort serviceable material from unserviceable material
and stacking of usable material with disposal of remaining malba
One Thousand One
to nearest approved municipal dumping ground including loading,
Hundred One Rupees
57.0 transporting and unloading. Note: Item to be only used where the 1,101.97 cum 200.00
and Ninety Seven Paisa
material cannot be brought by manual means due to narrow
access or heavy weight. To be done as per the directions of
Archaeological Engineer and Conservation Architect.
Subtotal of Section G
Rounding off - Total of Section G ₹4,32,686.00
SECTION H : SITE ENABLING WORKS
Construction of Temporary Shed for Storing and Sorting of Stone
Providing and padding architectural elements and members with
hay, wherever required, to protect them from damage including Two Hundred Sixty
supply of all materials, labour, tools etc complete as per direction Seven Rupees Only
of Engineer-in-charge.
Hire charges of crane Six Hundred Ninety
59.0 699.15 Nine Rupees and per hour 1,080.00
Fifteen Paisa Only
Subtotal of Section H
Rounding off - Total of Section H ₹8,61,882.00
Description of Item
Sr. no. Rate (In Fig) Rate (In Words) Unit Quantity Amount (INR)
SECTION I : MISCELLANEOUS WORK
Carring out plinth treatment to post construction / existing
structure by spraying chemical solution for termite control
treatment including labour and material consistment with I.S.I
specification. Using Chlordene and Chiorpurfiles 20 EC. As Per One Hundred Twenty
60.0 6131_paret-II Consentration Weight one percent is recommended 123.12 Three Rupees and sqm 936.23
i.e one litre 20 EC chemical emulsion with 19 liter give 1 % Twelve Paisa Only
concrentration inclusive of one litre chemical emulsion appication
at the rate of 5 Litre chemical / Sqm of surface is recommended as
Providing,commissioning, fixing, & installing a finished information
signage in mild steel and sandstone as per the drawings and
details provided by the architect. The dimension of panel to be
approximately 1m x 0.9m along with 2 columns of 2m height with
bottom diameter of 0.2m and middle portion diameter of 0.1m,
with carving depth from 10mm to 50mm varies as per design,
including carving out patterns manually and fine intricate patterns
with CNC cutting made in parts as per design/drawings and as per
requirement of items and measurement from site. Fixing &
installation with necessary stainlesss steel cramps/anchor/fastner Eighty One Thousand
61.0 of required size and shape & making necessary chases in stone 81,595.00 Five Hundred Ninety Each 2.00
and wall/RCC where ever required, pointing in white cement Five Rupees Only
mortar 1:2 (1 cement : 2 marble dust) with an admixture of
pigment matching the stone shade, with necessary scaffolding /
centering etc. and as per requirement of items and measurement
from site including preparation of sketches/drawings, 3D
computer model, miniature sample, transportation & final
finishing all complete on-site. All detailed work are to be done per
the drawings/3D computer model approved by the engineer-in-
charge & consultant architect.
Subtotal of Section I
Rounding off - Total of Section I ₹2,78,459.00
GRAND TOTAL
GRAND TOTAL
In Words: Three Crore Seventy One Lakhs Thirty One Thousand Nine Hundred Ninety Five Only
I/We am /are willing to carry out the work at… % above/below percent (should be written in figures and words) at the estimated
*Estimated Amount : *Estimated Amount :
Put to Tender Rs. 3,71,31,995.00 Put to Tender Rs.
Deduct: ……………% below Rs.………………… Add ………… % above Rs. …………….
Net Rs. ………………………………………….. Total Rs. ………………………………….
In words. ……………………………..…………… In words. ……………………………..……………
*(Please strike out whichever is not applicable)
1 All works shall be carried out as per Public work department handbook and other specifications of division or as directed.
2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor
3 Rates quoted include clearance of site (prior commencement of work and at its close)in all respects and hold good for work under
4 To be continued on additional sheets, if found necessary.
Contractor Contracting Authority
Sign & Seal Sign & Seal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. NIT_ShivaTemple.pdf
02. SBD DRAFT_ShivaTemple.pdf
03. Schedule B - Shiva Temple.pdf
05 Item Specifications1.pdf
04.Pre Qualification_ShivaTemple.pdf
06. Shiva Temple_Tender Drawings_Part 1.pdf
06. Shiva Temple_Tender Drawings_Part 2.pdf
06. Shiva Temple_Tender Drawings_Part 3.pdf
06. Shiva Temple_Tender Drawings_Part 4.pdf
06. Shiva Temple_Tender Drawings_Part 5.pdf
Corrigendum I Shiv Temple Kera.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .