Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 L+₹530 (0.11%)Rejected-Finance | ₹4.9 L+₹530 (0.11%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | Nasar PK L5 | RAJEESH KUMAR M B L1 | Raju N K L3 | MIDHUN A S L2 | K MOHAMMED KUNHI L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Re construction of compound wall near to tribal office | ||||||||
| 1.00 | 2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 45 | sqm | 107.43 ₹4,834.35 Lowest | 110 ₹4,950 | 200 ₹9,000 | 109.63 ₹4,933.35 | 109.63 ₹4,933.35 |
| 1.00 | 15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor | 96.2 | cum | 959.31 ₹92,285.62 | 900 ₹86,580 | 1,000 ₹96,200 | 835 ₹80,327 Lowest | 960 ₹92,352 |
| 1.00 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 24.26 | cum | 3,443.13 ₹83,520 | 3,450 ₹83,686.65 | 3,200 ₹77,622.4 Lowest | 3,200 ₹77,622.4 Lowest | 3,350 ₹81,260.95 |
| 1.00 | 60.7.8 : DR with Departmental. Stone -
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 72.15 | cum | 1,450.23 ₹1,04,634.09 | 1,250 ₹90,187.5 Lowest | 1,300 ₹93,795 | 1,400 ₹1,01,010 | 1,400 ₹1,01,010 |
| 1.00 | 13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 136.25 | sqm | 331.33 ₹45,143.71 | 310 ₹42,237.5 | 300 ₹40,875 Lowest | 330 ₹44,962.5 | 338 ₹46,052.5 |
| 1.01 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 33.24 | sqm | 640.81 ₹21,300.52 | 550 ₹18,282 Lowest | 600 ₹19,944 | 640 ₹21,273.6 | 653 ₹21,705.72 |
| 1.01 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 11.13 | cum | 8,959.25 ₹99,761.23 | 9,250 ₹1,02,998.75 | 9,200 ₹1,02,442 | 8,400 ₹93,534 Lowest | 8,500 ₹94,647.5 |
| 1.01 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 723.77 | kilogram | 96.94 ₹70,163.91 | 90 ₹65,139.75 Lowest | 98 ₹70,929.95 | 98 ₹70,929.95 | 98.92 ₹71,595.82 |
Tender Value
₹5.3 L
EMD Value
₹9,000
Closing Date
27 Apr 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer, LID EW Division , Kalpetta
DP WAYANAD 2021-22 Pr.No.584 Construction of Compound Wall to Kappiset School in Mullankolly GP Rs 600000
2022_LSGD_483397_2
EE/LIDEW/WYD/18/2021-22
Open Tender
Civil Works - Others
Item Rate
180 days
Kalpetta
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,420
Yes
₹9,000
Yes
13 Jul 2026
20 Apr 2022
30 Apr 2022
20 Apr 2022
27 Apr 2022
20 Apr 2022
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_699832.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .