| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC Agreement executed by L1 |
| 2 | L2₹4.4 Cr+₹3.5 L (0.80%)Rejected-AOC | ₹4.4 Cr+₹3.5 L (0.80%) | L2 | Rejected-AOC Agreement executed by L1 |
| 3 | L3₹4.5 Cr+₹18.2 L (4.16%)Rejected-Finance | ₹4.5 Cr+₹18.2 L (4.16%) | L3 | Rejected-Finance Approval from CE |
| 4 | L4₹4.5 Cr+₹18.6 L (4.27%)Rejected-Finance | ₹4.5 Cr+₹18.6 L (4.27%) | L4 | Rejected-Finance Approval from CE |
| 5 | L5₹4.6 Cr+₹19.5 L (4.48%)Rejected-Finance | ₹4.6 Cr+₹19.5 L (4.48%) | L5 | Rejected-Finance Approval from CE |
| Sl No | Description | Qty | Unit | VYSHAK P L3 | SHAJI V J L2 | V UMMER HAJI L6 | V ABDUL AZEEZ L1 | Abdul Gafoor K L5 | T V BENOY L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix A Bridge proper | |||||||||
| 1.00 | OD259275/2025-2026: RINGBUNDType-I-Puttingupringbundasperapprovedshape2.5mbottomwidth,1mtop widthusingemptygunny/polythenebagsfilledwithearthplacedin2rowsat0.6mapartand lledinbetweenwithpuddleclay toformbundforanaverageheight2.00mincludinglabour dismantlingthebundaftercompletionoftheworketc.complete. | 72 | cum | 605.88 ₹43,623.36 | 586.33 ₹42,215.76 | 662.93 ₹47,730.96 | 600 ₹43,200 | 200 ₹14,400 Lowest | 602.6 ₹43,387.2 |
| 1.00 | 12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location | 20 | metre | 9,054.33 ₹1,81,086.6 | 8,762.25 ₹1,75,245 | 9,906.99 ₹1,98,139.8 | 9,500 ₹1,90,000 | 500 ₹10,000 Lowest | 9,006.6 ₹1,80,132 |
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 312.45 | cum | 89.55 ₹27,979.9 | 86.66 ₹27,076.92 Lowest | 97.99 ₹30,616.98 | 100 ₹31,245 | 90 ₹28,120.5 | 89 ₹27,808.05 |
| 1.00 | OD210222/2022-2023:Providing Steel Liner 6 mm thick for RCC piles including Fabricating and Setting out as per Detailed Drawing. | 5.18 | MT | 1,42,166.21 ₹7,35,852.3 | 1,37,580.2 ₹7,12,115.12 | 1,55,554.18 ₹8,05,148.44 | 1,35,000 ₹6,98,760 Lowest | 1,40,000 ₹7,24,640 | 1,45,377.7 ₹7,52,474.98 |
| 1.00 | 12.24.6:BBored cast-in-situ M35 grade R.C.C. Pile Using Concrete Mixer excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm | 343.84 | metre | 14,270.94 ₹49,06,905.74 | 13,810.58 ₹47,48,616.02 | 15,614.85 ₹53,68,994.41 | 13,600 ₹46,76,210.4 Lowest | 15,000 ₹51,57,585 | 14,593.3 ₹50,17,745.68 |
| 1.01 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 6.77 | cum | 8,949.59 ₹60,570.83 | 8,660.89 ₹58,616.9 | 9,792.38 ₹66,274.83 | 8,700 ₹58,881.6 | 8,500 ₹57,528 Lowest | 8,901.3 ₹60,244 |
| 1.01 | 12.38.D.1:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification RCC Grade M-35 -Using Concrete Mixer | 83.52 | cum | 10,964.83 ₹9,15,782.6 | 10,611.12 ₹8,86,240.74 | 11,997.4 ₹10,02,022.85 | 10,500 ₹8,76,960 Lowest | 12,000 ₹10,02,240 | 11,212.5 ₹9,36,468 |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 68.38 | MT | 1,10,272.78 ₹75,40,121.88 | 1,06,715.6 ₹72,96,892.58 | 1,20,657.31 ₹82,50,184.89 | 97,500 ₹66,66,757.5 Lowest | 1,12,000 ₹76,58,224 | 1,12,763 ₹77,10,395.65 |
| 1.01 | 13.5.H.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - Using concrete Mixer - Height upto 5m | 126.12 | cum | 11,517.6 ₹14,52,576.68 | 11,146.06 ₹14,05,718.8 Lowest | 12,602.22 ₹15,89,366.78 | 11,200 ₹14,12,521.6 | 12,500 ₹15,76,475 | 11,456 ₹14,44,807.81 |
Tender Value
₹4.2 Cr
EMD Value
₹1 L
Closing Date
13 Mar 2026, 11:00 amClosed
Superintending Engineer,PWD Bridges,North Circle
Office of the Superintending Engineer, PWD Bridges, North Circle, Thondayad, Kozhikode 673017
GENERAL-Construction of Periya Vattoli Bridge in Mananthavady Constituency in Wayanad district-General Civil work-General Civil Work
2026_PWD_837497_2
PWD/BR/TR/24773/2022_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
540 days
Mananthavady
Please refer Tender documents.
9 documents required · 9 mandatory
₹8,270
Yes
₹1 L
Yes
29 Jun 2026
3 Mar 2026
16 Mar 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A Bridge proper | |||||
| 1.001 | OD259275/2025-2026: RINGBUNDType-I-Puttingupringbundasperapprovedshape2.5mbottomwidth,1mtop widthusingemptygunny/polythenebagsfilledwithearthplacedin2rowsat0.6mapartand lledinbetweenwithpuddleclay toformbundforanaverageheight2.00mincludinglabour dismantlingthebundaftercompletionoftheworketc.complete. | - | cum | - | - |
| 1.002 | 12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location | - | metre | - | - |
| 1.003 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 1 | cum | - | - |
| 1.004 | OD210222/2022-2023:Providing Steel Liner 6 mm thick for RCC piles including Fabricating and Setting out as per Detailed Drawing. | - | MT | - | - |
| 1.005 | 12.24.6:BBored cast-in-situ M35 grade R.C.C. Pile Using Concrete Mixer excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm | 0.6 | metre | - | - |
| 1.006 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 1 | cum | - | - |
| 1.007 | 12.38.D.1:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification RCC Grade M-35 -Using Concrete Mixer | 1 | cum | - | - |
| 1.008 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 0.8 | MT | - | - |
| 1.009 | 13.5.H.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - Using concrete Mixer - Height upto 5m | 0.2 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1422821.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
sbd.pdf
Tender Documents • 2.05 MB
nit.pdf
Tender Documents • 0.05 MB
BOQ_1422821.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .