Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹20.4 L+₹29,728.04 (1.48%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | T. MUHAMMED SADATHALI L1 | SAJI THOMAS L2 |
|---|---|---|---|---|---|
| 1.00Beautification of open auditorium | |||||
| 1.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 39.37 | cum | 359.72 ₹14,160.74 Lowest | 370 ₹14,565.42 |
| 1.00 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 41.8 | cum | 3,993.46 ₹1,66,910.65 Lowest | 4,000 ₹1,67,184 |
| 1.00 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling
up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate
20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse
sand) | 32.2 | cum | 8,343.49 ₹2,68,643.69 Lowest | 8,388 ₹2,70,076.82 |
| 1.00 | 7.8.1
Coursed rubble masonry with hard stone (first or second sort) in superstructure above
plinth level and upto floor five level.Masonry work (first sort), in cement mortar 1:6
(1 cement : 6 coarse sand) | 11.47 | cum | 11,923.94 ₹1,36,827.21 Lowest | 11,999 ₹1,37,688.53 |
| 1.00 | 50.2.26.1
Filling with contractor own earth (excluding rock) in open areas in layers not
exceeding 20 cm in depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-incharge. | 175.56 | cum | 445.71 ₹78,248.85 Lowest | 488 ₹85,673.28 |
| 1.01 | 51.2.3
Filling with Quarry Muck Filling up low lying and water logged areas with local
material/ quarry muck, spreading in layers, leveling the top at site and consolidation
by ramming, etc complete for improving the CBR value of subgrade | 92.4 | cum | 909.57 ₹84,044.27 Lowest | 950 ₹87,780 |
| 1.01 | 16.68
Providing and laying 60 mm thick factory made cement concrete interlocking paver
block of M - 30 grade made by block making machine with strong vibratory
compaction, of approved size, design & shape, laid in required colour and pattern
over and including 50 mm thick compacted bed of coarse sand, filling the joints with
fine sand etc. all complete as per the direction of Engineer-in-charge. | 642 | sqm | 1,190 ₹7,63,980 Lowest | 1,200 ₹7,70,400 |
| 1.01 | 13.34
Raised and cut pointing on stone work in white cement mortar 1:3 ( 1 white cement :
3 marble dust) | 47.7 | sqm | 749.41 ₹35,746.86 Lowest | 780 ₹37,206 |
| 1.01 | OD155609/2025-2026
Supplying and filling 10mm metal | 13.23 | cum cm | 3,189.35 ₹42,195.1 Lowest | 3,199 ₹42,322.77 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
4 Nov 2025, 4:00 pmClosed
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
LAC-ADS-Pattambi 2023-24 Construction and Beautification of Open Auditorium at Janatha School, Thiruvegappura Panchayat, Palakkad General Civil Work
2025_KEL_815942_1
KRO/BDC/2201/2025
Open Tender
Civil Works - Buildings
Item Rate
KEL MAMALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
6 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
28 Oct 2025 - 4 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1366333.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .