Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical A 15 1ST FLOOR PRIYADARSHINI VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
6 Jul 2026, 2:00 pmClosed
Executive Engineer CMD BHEP
Office of the Executive Engineer CMD BHEP
Repair works of settled area near intake structure at dam body BHEP Part - I
2026_SPDC_313731_1
ENIT 09 of 2026-27
Open Tender
Civil Works
Percentage
365 days
Dam Site BHEP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
CPAO BHEP
₹2.8 L
Office of Chief Engineer Civil BHEP
14 Jul 2026
26 Jun 2026
7 Jul 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
26 Jun 2026 - 4 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labours for dismantling the STP components | 20 | Man Days | 713.37 | ₹14,267.4 |
| 2 | Engagement of Mobile crane for shifting of the components of STP | 2 | Days | 6,120 | ₹12,240 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 581.92 | Cum | 1,725.2 | ₹10,03,928.38 |
| 4 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of : G.S. Sheet for walls and roofing | 240.91 | Sqm | 125.35 | ₹30,198.07 |
| 5 | Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 meters lead. Chain Link Fencing | 127.68 | Sqm | 55.6 | ₹7,099.01 |
| 6 | Dismantling and stacking within 50 meters lead, fencing posts or struts
including all earth work and dismantling of concrete etc. in base of
T or L iron or pipe | 80 | Each | 179.2 | ₹14,336 |
| 7 | Dumping of graded boulders of size 225 mm or above or as directed by Engineer in Charge including cost of stones | 1,454.81 | Cum | 952 | ₹13,84,979.12 |
| 8 | Supplying and stacking at site Graded crushed stone aggregate of size 90 mm to 45 mm | 260.96 | Cum | 1,204.15 | ₹3,14,234.98 |
| 9 | Supplying and stacking at site morrum | 163.97 | Cum | 668.95 | ₹1,09,687.73 |
| 10 | Supplying and stacking at site Good Earth | 163.97 | Cum | 281.3 | ₹46,124.76 |
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.46 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1015516.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .