Loading…
Loading…
227 results • Latest
Upgradation of Hydraulic system/ powerpack at all the Gates installed at Dam site and surge shaft emergency gate chamber at Power House BHEP-I including ARMAC System at Dam
Fabrication and Procurement of 33kV Multicore/ Multiratio Outdoor CT for Power House Ganderbal
Improvement of Lighting System including emergency lighting with UPS system inside and outside Power House Ganderbal
Felling/removal and sale of marked Poplars/broad leaved standing tress on as it is, where it is basis.
Repair and uplifting works like development of parks, fencing, parking shed in CEC civil office complex and Chenab colony at BHEP
Construction of Divisional Office and Sub-Divisional office for CMD LJHP Gantamulla
Construction of 4 rooms and compound walling of Girls Middle School Boniyar
Development of Approach Road for Two Room Residential Quarters at Bemina and other allied works
Desilting of Overhead Water Tank and Construction of 100ft Inspection Stair along with Repair of Steel Shed of 15HP Borewell at GT Pampore
REQUEST FOR PROPOSAL FOR COMPREHENSIVE STUDIES FOR IDENTIFICATION AND ASSESSMENT OF HYDROPOWER PROJECTS in Chenab River Basin, Union Territory of Jammu and Kashmir
Replacement of damaged window panes, painting, repair of drains, construction of septic tank and other civil works of Power House, CHEP Stage-I
Construction of Inspection hut including chain link boundary wall and other allied works at Pahalgam.
Conversion of existing Room at Direction office into conference Hall for meetings.
Repair and renovation of Hospital at base camp including procurement of lab instruments Chanderkote.
Repair of Sewerage collection system (manholes and sewerage distribution underground network) at PDC colony.
Business Development and Protocol for catering SOR PDC Colony Dam site and Guest Houses
Upgradation/Upliftment of High School Gundshart Karnah (Under CSR Head)
Repairing of Common Washroom and Kitchen for BSAT Office including Repair Replacement of Sewage Waste Pipes of all Existing Bathrooms
Maintenance and Landscaping of outside Lawn of Field Hostel including its Facelifting on front side by way of Varnishing at GT Pampore
Replacement of worn out 6 Nos 132 kV 3pole Isolators by SIT of latest motorized 3 pole 132 kV Isolators, 3 Nos without Earth Switch and 3 Nos with Earth Switch
Supply of various spares for USHP-I, Sumbal
Repair / Renovation of Power House, choked drainage system and other allied works including upgradation of Washroom, CHEP Stage-II
Protection work against sliding earth for upkeeping water conductor and project service road near RD 820m CHEP-II
Complete Reconditioning Overhauling Revival of damaged 250 KVA 415V 3phase DG set make Sudhir Cummins including one No of auto synchronizing panel (asp) in order to enhance the overall auxiliary supply capacity of power house (synchronised with exist
SITC OF COMPLETE HEATING SYSTEM (INCLUDING HEATING ELEMENTS AND CONTROL PANEL) FOR GENERATOR FOR ALL THE THREE UNITS OF 3INTO35MW LJHP BARAMULLA
Painting of CRG gates and MRG stop log gates
Removal of logs / cleaning of trash.
Physical Verification of the stores and material handling, painting and electrical works, CCTV security system repair etc.
Repair of Intake Trash Rack including Painting
Upgradation of CRG Gantry crane and overhauling of motor and gear box.
Overhauling, repair and maintenance of Surge Shaft Gantry Crane and DT Gantry Crane including complete hoisting mechanism and allied works of BHEP II
Replacement Of The Existing Damaged Chiller Plant Insulation Of HVAC System With A Nitrile Rubber Insulation Along With Repairing/Replacement of Pipe Line And Descaling Of Complete Chiller System And Radiators And Allied Parts Etc
SUPPLY INSTALLATION, TESTING AND COMMISSIONING OF FLOOD EARLY WARNING SYSTEM AT DAM FOR 900 MW BAGLIHAR HEP
Replacement of damaged 11 KV, 03 No CT PT in switchyard at USHP-I, Sumbal.
Repairs and replacement of defunct parts of lubricant oil centrifugal filtration plant (D Level)
SITC of 15 KVA DG set for power house Ganderbal
Repair/ renovation of dilapidated shift duty staff quarters along with JE and AEE quarter at Dibber CHEP-III
River training works at Headworks for protection of water conductor and service road CHEP-III
Construction of Footover Bridge on Nagulta Nallah along with abutments for approach to headworks of CHEP-I.
Providing and Fixing of Chain Link Fencing (Front and Back Sides) to the Departmental Land at Matlote (Dharmari) Distt. Reasi
Repair and Renovation of sumbal link sub-divisional office and lodging at headwork sumbal including allied works
Repairing of Oil Circulating Pumps of Generator Transformer of BHEP-II.
Fabrication of racks for AMC/RMC store in power house bhep stage-ii
PROCUREMENT OF SF6 AND NITROGEN ALONG WITH NEW CYLINDERS AND REPAIR OF OLD CYLINDERS.
Physical Verification of stores/shifting of material within the premises of BHEP-II
Fabrication of suitable shed ( 30 ft x 20 ft) for 400kv LILO tie circuit breaker installed at pothead yard of BHEP stage-II.
SITC of monorail hoist for lifting and lowering of DND and flood Pumps at MIV floor of BHEP-II
AMC/RMC of hydro mechanical equipment installed at BHEP II for a period of 2 years
SITC of Hooter System
Supply of MS Grating Intake Gate cover Plates at dam for HRT 1 and 2