Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹4.5 LAdmitted-Finance R O RAMBAN GARHI | ₹4.5 L | H1 | Admitted-Finance |
| 2 | H2₹3.9 L−₹55,908.50 (12.4%)Admitted-Finance | ₹3.9 L−₹55,908.50 (12.4%) | H2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical incomplete documents |
| Sl No | Description | Qty | Unit | M/s Abbas Ali H2 | MOHD AMIN H1 |
|---|---|---|---|---|---|
| 1.00SITC | |||||
| 1.01 | Fabrication of steel structure work in welded in buildup sections, trusses and frame work including cutting, hoisting fixing in points and apply a priming coat of approved steel primer using structural steel, etc. as required
For 01 no Rack Structure:-
Main legs ISA (50x50x6) mm
4 mtr x 4 no. = 16 RM @ 4.47kg/mtr. = 71.52 Kgs
I) Side angle ISA 50x50x6mm
(1mtr x 2nos)x 4no.= 8Rm @ 4.47kg/rm= 35.76kg
II) Side angle ISA 50x50x6mm
(2mtr x 2nos)x 4no.= 16Rm @ 4.47kg/rm=71.52
Middle Supporting Angle ISA 4040 (40x40x6) mm
1mtr x 4 nos= 4Rm @ 3.52kg/mtr= 14.08 Kgs
MS Sheet (3mm)
(2mtr x 1mtr) x 4no=08 [email protected]/Sqm= 188 Kgs
Corner support ISA 4040 (40x40x6)mm
(2.5mtr approx. x 2) 4no=20rm @ 3.5kg/mtr=70 Kgs
Total Weight for 01 rack = 450.88 Kgs
For such of 8 no. Racks = 3607 Kgs | 3,607 | Kgs | 109.5 ₹3,94,966.5 Lowest | 125 ₹4,50,875 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
29 Jul 2026, 6:00 pmClosed
executive Engineer Generation Diviison BHEP II
executive Engineer Generation Diviison BHEP II chanderkote
Fabrication of racks for AMC/RMC store in power house bhep stage-ii
2026_SPDC_314358_1
06 of 2026 dated 01-07-2026
Open Tender
Iron/Steel Materials
Item Rate
60 days
BHEP II Chanderkote
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
CPAO BHEP Chanderkote
₹10,000
Yes
chanderkote
15 Sept 2026
3 Jul 2026
31 Jul 2026
3 Jul 2026
29 Jul 2026
10 Jul 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SITC | |||||
| 1.01 | Fabrication of steel structure work in welded in buildup sections, trusses and frame work including cutting, hoisting fixing in points and apply a priming coat of approved steel primer using structural steel, etc. as required
For 01 no Rack Structure:-
Main legs ISA (50x50x6) mm
4 mtr x 4 no. = 16 RM @ 4.47kg/mtr. = 71.52 Kgs
I) Side angle ISA 50x50x6mm
(1mtr x 2nos)x 4no.= 8Rm @ 4.47kg/rm= 35.76kg
II) Side angle ISA 50x50x6mm
(2mtr x 2nos)x 4no.= 16Rm @ 4.47kg/rm=71.52
Middle Supporting Angle ISA 4040 (40x40x6) mm
1mtr x 4 nos= 4Rm @ 3.52kg/mtr= 14.08 Kgs
MS Sheet (3mm)
(2mtr x 1mtr) x 4no=08 [email protected]/Sqm= 188 Kgs
Corner support ISA 4040 (40x40x6)mm
(2.5mtr approx. x 2) 4no=20rm @ 3.5kg/mtr=70 Kgs
Total Weight for 01 rack = 450.88 Kgs
For such of 8 no. Racks = 3607 Kgs | - | Kgs | 1.25 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1017864.xls
BOQ • 0.32 MB
ExtensionI.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .