Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 LAdmitted-Finance PLOT NO 102 VMEM ENGINEERING SERVICES PHASE II VIRAT NAGAR MODEL TOWN MODEL TOWN PANIPAT PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹35.3 L | L1 | Admitted-Finance |
| 2 | L2₹53.8 L+₹18.5 L (52.5%)Admitted-Finance 6 SHOP 6 SHASTRI MARKET S K SALES COMPANY 977 JALANDHAR PUNJAB 144001 | JALANDHAR | PUNJAB | 144001 | ₹53.8 L+₹18.5 L (52.5%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Failed to Provide the relevant documents as per SBD |
| 4 | Rejected-Technical PLOT 41 A PHASE 1 R S CORPORATION COMPOUND GIDC ESTATE VITTHAL UDHYOGNAGAR ANAND GUJARAT 388121 | ANAND | GUJARAT | 388121 | - | - | Rejected-Technical Failed to Provide the relevant documents as per SBD |
| 5 | Rejected-Technical | - | - | Rejected-Technical Failed to Provide the relevant documents as per SBD |
| Sl No | Description | Qty | Unit | vmem engineering services L1 | S.K Sales Company L2 |
|---|---|---|---|---|---|
| 1.00Panel Upgradation | |||||
| 1.01 | Supply, installation, testing and commissioning of a complete control panel system for a 50 ton gantry crane, including limit switches and operator room control switches. The new control panel should be designed to meet operational requirements, such as hoisting, lowering, and horizontal movement. Electrical drawings and Bill of material for existing panel will be provided for the reference | 1 | Complete Job | 14,00,000 ₹14,00,000 | 11,75,000 ₹11,75,000 Lowest |
| 2.00Stack rope monitoring system | |||||
| 2.01 | SITC of a stack rope monitoring system to monitor and assess the vertical movement of the hoisting rope and lifting beam in a gantry crane. The system should comprise rope tension sensors, proximity or alignment sensors, a control unit, and a vertical movement length display unit. The complete setup should be integrated into the control panel of the gantry crane to ensure seamless access and monitoring by the operator from the operator control room. This integration should provide real-time data on rope tension and vertical movement. | 1 | Complete Job | 2,51,000 ₹2,51,000 Lowest | 8,00,000 ₹8,00,000 |
| 3.00Load cell measurement system | |||||
| 3.01 | SITC of a load cell measurement system for a gantry crane to accurately measure the weight of the load being lifted. The system should include load cells, signal amplifiers/transmitters, a display unit, an alarm system, and a control unit/PLC. It should monitor load distribution across multiple load cells at both ends of the lifting beam to ensure even weight distribution. The system should be fully integrated with the crane’s control panel, enabling automatic lifting stoppage if the load exceeds preset limits or if there is an imbalance in weight distribution. Additionally, load readings should be displayed on the operator console for real-time monitoring and control during lifting operations. | 1 | Complete Job | 4,10,000 ₹4,10,000 Lowest | 7,20,000 ₹7,20,000 |
| 4.00Electromagnetic Disk Brake | |||||
| 4.01 | Supply, Installation, Testing, and Commissioning (SITC) of an electromagnetic disc brake system for the gantry crane, intended to effectively control and safely stop the hoist motion during lifting and transportation operations. The system shall comprise electromagnets, brake discs, brake pads/linings, armature plates, and springs. It shall be of the power-off (fail-safe) type, ensuring automatic brake engagement in the event of power failure to enhance operational safety.
The scope also includes replacement of the existing one (01) thruster brake with a new unit, along with fabrication and installation of a suitable foundation for both the new thruster brake and the electromagnetic brake. The control system for both braking units shall be integrated into the supplied control panel to enable seamless operation, coordination, and monitoring of the braking system.
. | 1 | Complete Job | 4,49,999 ₹4,49,999 Lowest | 6,80,000 ₹6,80,000 |
| 5.00Wired Remote | |||||
| 5.01 | SITC of a handheld wired remote for operators to control the crane's movements, such as lifting, lowering, and moving loads. Complete setup along with Control buttons (Hoist up/down, Travel left/right, Emergency stop), Cable (Wired connection), Connector/Plug, Protective housing (Waterproof, shockproof) and Indicator lights is to be provided. | 1 | Complete Job | 1,82,000 ₹1,82,000 Lowest | 7,10,000 ₹7,10,000 |
Tender Value
₹59.8 L
EMD Value
₹1.2 L
Closing Date
9 Jun 2026, 4:00 pmClosed
Executive Engineer
Mechanical Division BHEP Chanderkote
Upgradation of CRG Gantry crane and overhauling of motor and gear box.
2026_SPDC_310288_1
E NIT NO. 04-MECH OF 2026-27 DATED 19.05.2026
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
120 days
BHEP Chanderkote
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
CPAO BHEP Chanderkote
₹1.2 L
BHEP Chanderkote
27 Jul 2026
19 May 2026
11 Jun 2026
19 May 2026
9 Jun 2026
1 Jun 2026
19 May 2026 - 9 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Panel Upgradation | |||||
| 1.01 | Supply, installation, testing and commissioning of a complete control panel system for a 50 ton gantry crane, including limit switches and operator room control switches. The new control panel should be designed to meet operational requirements, such as hoisting, lowering, and horizontal movement. Electrical drawings and Bill of material for existing panel will be provided for the reference | - | Complete Job | 100 | - |
| 2Stack rope monitoring system | |||||
| 2.01 | SITC of a stack rope monitoring system to monitor and assess the vertical movement of the hoisting rope and lifting beam in a gantry crane. The system should comprise rope tension sensors, proximity or alignment sensors, a control unit, and a vertical movement length display unit. The complete setup should be integrated into the control panel of the gantry crane to ensure seamless access and monitoring by the operator from the operator control room. This integration should provide real-time data on rope tension and vertical movement. | - | Complete Job | 100 | - |
| 3Load cell measurement system | |||||
| 3.01 | SITC of a load cell measurement system for a gantry crane to accurately measure the weight of the load being lifted. The system should include load cells, signal amplifiers/transmitters, a display unit, an alarm system, and a control unit/PLC. It should monitor load distribution across multiple load cells at both ends of the lifting beam to ensure even weight distribution. The system should be fully integrated with the crane’s control panel, enabling automatic lifting stoppage if the load exceeds preset limits or if there is an imbalance in weight distribution. Additionally, load readings should be displayed on the operator console for real-time monitoring and control during lifting operations. | - | Complete Job | 10 | - |
| 4Electromagnetic Disk Brake | |||||
| 4.01 | Supply, Installation, Testing, and Commissioning (SITC) of an electromagnetic disc brake system for the gantry crane, intended to effectively control and safely stop the hoist motion during lifting and transportation operations. The system shall comprise electromagnets, brake discs, brake pads/linings, armature plates, and springs. It shall be of the power-off (fail-safe) type, ensuring automatic brake engagement in the event of power failure to enhance operational safety.
The scope also includes replacement of the existing one (01) thruster brake with a new unit, along with fabrication and installation of a suitable foundation for both the new thruster brake and the electromagnetic brake. The control system for both braking units shall be integrated into the supplied control panel to enable seamless operation, coordination, and monitoring of the braking system.
. | - | Complete Job | 10 | - |
| 5Wired Remote | |||||
| 5.01 | SITC of a handheld wired remote for operators to control the crane's movements, such as lifting, lowering, and moving loads. Complete setup along with Control buttons (Hoist up/down, Travel left/right, Emergency stop), Cable (Wired connection), Connector/Plug, Protective housing (Waterproof, shockproof) and Indicator lights is to be provided. | - | Complete Job | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
SBD.pdf
Tender Documents • 1.16 MB
BOQ_1003943.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .