Repair of Damaged R/Wall at Switchyard along with slope protection work for sliding area of CHEP-I.
Repair of damaged R Walls at various spots of Project Road of CHEP-I due to heavy rainfall of 26 08 2025 and 03 09 2025 including filling of potholes and Surface Dressing in stretches.
Construction of RCC wall for protection of exposed cut and cover portion of water conductor at RD 420m CHEP III
Repair of damaged R Wall near right bank upstream of Tawi on Escape Outfall Gate side of Power House Stage-I
Repair works around the Shift Duty Quarters at Headworks Beni Sangam CHEP I
Renovation and Repair of administrative office and sub division
NIT for the work Geological and Geotechnical studies of LJHP
Geotechnical studies of USHP-I
Monitoring Hazard Risk assessment of existing power projects for Geological studies
Comprehensive Upkeeping and Maintenance of Power House Stage-II (Civil Works) for a Period of Two Years, Including Routine and Preventive Maintenance of Civil, Electrical, and Plumbing Installations, Minor and Major Repair Works, Cleaning and Houseke
Provision for Tapping of Water at Source Above Pot Head Yard for Power House Stage-II by way of laying GI pipe from source point to Pot Head Yard and Further to Power House Including Supply, Installation and Commissioning of 5000-Litre Triple-Layered
Provision for Treatment, Repair, and Rehabilitation of Detached and Cracked Shotcrete in Various Adits of Power House Stage-II and Its Allied Areas.
Complete Overhaul, Upgradation, and Modernization of the Existing Underground Tunnel Illumination System in the Right Bank Tunnel of BHEP Stage-II by Way of Providing, Installing, Testing, and Commissioning Energy-Efficient Overhead LED Luminaires wi
Tapping of fresh drinking water to dam site from nearby spring on approach road to Dharmund colony.
Physical Verification of the stores and material handling, painting and electrical works, CCTV security system repair etc.
Construction of washroom in store yard of power house
Repairing of fencing around the main store Mohura Power house by way of plinth mesh tilted Fencing etc.
Facelifting of Power House USHP-I Sumbal including clearance of bushes and repairing of road and other allied works
Repair and Renovation of Generation Beat quarters along Sumbal Link Canal.
Assessment and Determination of Fair Market Value FMV and Reserve Price for Decommissioned Gas Turbine Units at GT Pampore
Repair of Intake Trash Rack including Painting
Upgradation of CRG Gantry crane and overhauling of motor and gear box.
Overhauling, repair and maintenance of Surge Shaft Gantry Crane and DT Gantry Crane including complete hoisting mechanism and allied works of BHEP II
Upgrade and supply, installation testing and commissioning of strainers for generator cooling of all the three units to make it duplex LJHP Baramulla
SITC of 11KV VCB panel board (12KV 1250A 25KA with over current fault earth fault relays IEC61850 Mimic Diagram Voltmeter Ammeter Annunciation windows with annunciation relays 3 Phase trivector meter 5Amps DLMS complaint with RS485 Peernia RS
Epoxy painting of all the under sluice and Spillway Gate leafs at Barrage of LJHP Baramulla.
Clearance of Catch water drains around Penstock power house and repairing to side walls.
Construction of gauge post on upstream of trench weir for record of Daily Discharge in river
Construction of New security quarter/gate post for safe guard of new power House.
Repair Reconstruction of damaged PCC lining bed and baffle blocks of Super passage Rayil and protection works from Gund Nallah
Facelifting of Generation Division Old Ganderbal
Repair Renovation of beat quarters of USHP-I sumbal
Upgradation of AE/JE quarter at Bemina Srinagar
Interior renovation and Refurbishment of Direction office CID Srinagar
Replacement of CGI sheets and chajja of office building of superintending Engineer Generation circle-II Bemina and providing of separate entry for ladies washroom with modification to existing accessories and allied works
Repair of damaged portion of canal bed at spots between RD 10900m to RD 11300m Swena area of CHEP I by laying M25 Grade concrete Shutdown Works
Site Clearance by way of Cutting of Grass Thorny Bushes, Removal of Herbs and Shrubs to Facilitate Asset Valuation at GT Pampore
Repair of Bathroom and Construction of septic tank and soakage pit at CID sub-Division Anantnag.
Wages outsource for canal patrolling watch and ward etc
Replacement Of The Existing Damaged Chiller Plant Insulation Of HVAC System With A Nitrile Rubber Insulation Along With Repairing/Replacement of Pipe Line And Descaling Of Complete Chiller System And Radiators And Allied Parts Etc
Removal of logs / cleaning of trash.
Painting of CRG gates and MRG stop log gates
Installation of Enhanced Water Cooling Arrangement for Bearings Gearboxes and Overhauling of MIV Operating Mechanisms for Unit I and II at MHEP Pahalgam
Protection works at Swena Nallah for safeguarding the piers and abutments of the Aqueduct CHEP I.
Construction of Pipe Culvert along with concreting of eroded patches on Headworks Road of CHEP I
Overhauling of 15 HP Tail Pool Dewatering Pump at MHEP Pahalgam including SITC of Auto-Control Panel
SERVICING OF 02 H.P COMPRESSORS INSTALLED AT LJHP BARAMULLA
Rewinding/Repair of 60HP motors and other motors for 3x35 MW LJHP, Baramulla
Repair AND Renovation (civil, Sanitary AND electrical items) of JE-4 Set Quarter of CCD-I.
Strengthening of Burm for approach road at various spots of Main Access Road